Text
.
~
l* J
. VIROINIA I$LI:CTRIC AND l' OWE H COMI'ANY lt icu n osta, Vinoin:A 20061 4
July 13, 1993 i
U. S. Nuclear Regulatory Commission Serial No.
93 424 l
Attention: Document Control Desk NL&P/JMJ:Jmj Washington, D.C. 20555 Docket Nos.
50-338 50-339 i
License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of June 1993.
i Very truly yours,
.~
4
, ). (m' [%. _
t
.i '
A g
N
\\
t W. LT Sf'ewart Senior Vice President - Nuclear Enclosure t
cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 NRC Senior Resident inspector l
North Anna Power Station i
i 1
i I
l 190066 PDR9307190094 930630
/
R ADOCK 05000338 9 IN PDR
o a
i VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
June YEAR:
1993 Approved:
8 Stat n
ant
OPERATING DATA REPORT DOCKET NO.:
50 338 DATE: July 1,1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 i
OPERATING STATUS 1.
Uni t N ame :................................ N o r t h A nna 1 2,.
Report ing Per i od:......................... June 1993 3.
Licensed Thermal Power (MWt).............
2,893
'4.
Nameplate Rating (Gross MWe):.............
947 5.
Design Electrical Rating (Net MWe):.......
907 5
6.
Maximum Dependable Capacity (Gross MWe)..
959 7.
Maximum Dependable capacity (Net MWe):...
911 t
8.
If r.hanges occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:___N/A s
9.
Power level to which restricted, if any (Net MWe):.___N/A
- 10. Reasons for restrictions, if any:
N/A
)
This Month Y-t-D Cumulative 11.' Hours in Reporting Period...............................
720.0 4,343.0 131,699.0
- 12. Number of Hours Reac tor was Cri t ical...................
720.0 2,057.9 95,988.7
- 13. Reactor Reserve Shutdown Hours.......................
0.0 68.8 6,826.8
- 14. Hours Generator On-Line...................
720.0 2,027.2 93,023.9
- 15. Unit Reserve,$hutdown Hours.........
0.0 0.0 0.0
- 16. Gross Therna l Energy Generated (MWH )..................... 2,081,756.3 5,503,968.2 245,680,155.1
- 17. Gross Electrical Energy Generated (MWH)........
682,790.0 1,805,597.0 80,732,502.0
- 18. Net Electrical Energy Generated (MWH).....
649,106.0 1,715,242.0 76,429,182.0
- 19. Unit Service Factor..................
100.0%
46.7%
70.6%
^
?O. Unit Availability Factor................................
100.0%
46.7%
70.6%
- 21. Unit capacity Factor (using MDC Net).....................
99.0%
45.4%
65.0%
- 22. Unit Capacity Factor (using DER Net).....
99.4%
43.5%
64.0%
.23. Forced Outage Rate...........................
0.0%.
0.0%
11.2%
i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)__N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup __N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY.
COMMERCIAL OPERATION j
I J
li t
1 s
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Date:
July 1, 1993
Contact:
G.
E.
Kane Phone:
(703) 894-2101 MONTH:
June 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Ne t).
1 907 17 902 2
907 18 895 3
907 19 902 4
900 20 901 5
907 21 901 j
6 906 22 893 7
906 23 885 8
905 24 898 9
903 25 901 10 903 26 901 11 903 27 900 12 902 28 900 13 904 29 899 14 903 30 900 15 905 16 902 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
e NORTH ANNA POWER STATION UNIT NO.:
1 MONTH:
June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1
)
Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1993 0000 Began month with unit at 100% power, 955 MWe.
i l
June 04, 1993 0100 Commenced ramp-down to 90% power to perform j
belt maintenance on 1-GM-F-1 & 2.
0156 Unit stable at 90% power, 865 MWe.
0238 Commenced unit ramp-up to 100% power after completion of maintenance, 0415 Unit stable at 100% power, 955 MWe.
June 18, 1993 0835 Commenced unit ramp-down for TVFT.
0927 Unit stable at approximately 90% power, 880 MWe for TVFT.
1025 TVFT completed satisfactorily.
1039 Commenced unit ramp-up to 100% power, i
1200 Unit stable at 100% power, 946 MWe, June 30, 1993 2400 Ended month with unit at 100% power, 950 MWe.
i i
~.
O p,
.l 1
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 Report Month June Unit Name:
NA-1 Year:
1993 Date: July 1, 1993
Contact:
G.
E.
Kane
- No entry this month.
i I
J 1
s.
UNIT SHUTDOWNS AND POWER REDUCTIONS
. 4 DOCKET NO.:
50-339-UNIT NAME:
NA-1 DATE: July 1, 1993 REPORT MONTH: June 1993 CONTACT:
G.
E.
Kane PHONE: (703) 894-2101 f
3 1
- 1.
2 3
4 5
- No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event.
Code Code Action to Down Reactor Report #
Prevent Recurrence oNo entry this month.
l a
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions f
S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Dataf C= Refueling 3= Automatic Scram Entry Sheets for Licensee-D= Regulatory Restriction-4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source i-i 4
L 1..A.am.t-m
---T%'-
.a s.-%-
.r w
w N--w P
S7
- a w
a we riN1s e
t&
w V'w w
a
- ^m fe m'
-v w
1.6.
rw-s s-w tu
- DCeer ms wu d
m a.
OPERATING DATA REPORT DOCKET No.:
50-339 DATE: July 1, 1993 CONTACT:
G. E. Kane PHONE: (703) 894 2101 OPERATING ST%TUS
- 1. - Un i t N ame :............................... N o r t h Anna 2
. 2.
Deporting Period:,........................ June 1993 3.
Licensed Thermal Power (MWt):.............
2893 4 Nameplate Rating (Stoss MWe):.............
947 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximum Dependable Capacity (Gross MWe):..
957 7.
Maximum Dependable Capacity (Net MWe):....
909 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): ___N/A
'10. Reasons for restrictions, if any:
N/A This Month Y-t-D Cumulative
- 11. Hours in Reporting Period.......................
720.0 4,343.0 109,967.0
- 12. Nunber of Hours Reactor was Cri t ical...................
720.0 4,111.5 91,155.7
- 13. Reactor Reserve Shutdown Hours...........................
0.0 120.8 6,365.2
- 14. Hours Generator 0n-Line..........................
720.0 4,101.4 90,114.5
- 15. Uni t R ese rve Shut down Hours.......................
0.0 0.0 -
0.0
- 16. Gross Thermal _ Energy Generated (MWH).................... 2,082,332.2 11,667,861.8 243,792,626.3
- 17. Cross Electrical Energy Generated.(MWH).....
680,268,0 3,817,040.0 79,853,756.0
- 18. Net Electrical Energy Generated (MWH)....................
646,176.0 3,628,968.0 76,453,449.0
- 19. Unit Service Factor......................................
100.0%
94.4%
81.9%
'20. Unit Availability Factor................................
100.0%
94.4%
81.9%-
21.- Unit Capacity Factor (using MDC Net).....................
98.7%
91.9%
'77.2%
- 22. Unit Capacity Factor (using DER Net).......
98.9%
92.1%
76.7%
- 23. f orc ed Out ag e R a t e....................................
0.0%
5.6%
5.6%
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): Refueling outage,. September 4, 1993, 60 days, i
- 25. if Shutdown at end of Report Period,- estimated time of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial operation):
Forecast Achieved INITIAL CRITICALITY-INITIAL ELECTRICITY COMMERCIAL OPERATION i
m v-y
AVERAGE DAILY UNIT POWER LEVEL l
Docket No.:
50-339 Unit:
NA-2 Date:
July 1, 1993
Contact:
G. E. Kane Phone:
(703) 894-2101 MONTH:
June 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 902 17 898 2
902 18 898 3
901 19 897 4
885 20 897 5
885 21 896 6
902 22 896 7
902 23 896 8
901 24 896 9
901 25 897 10 897 26 897 11 898 27 896 12 899 28 896 13 899 29 895 14 899 30 896 15 900 16 899
- Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest i
whole megawatt.
l I
l.
s.
l NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1993 0000 Began month with unit at 100% power, 947 MWe.
June 04, 1993 0930 Commenced unit ramp-down for TVFT.
1000
. Unit stable at approximately. 90%.
]
power, 880 MWe.
1040 7VFT completed satisfactorily.
1045 Commenced unit ramp-up to 100%
power.
1120 Unit stable at 100% power, 933 MWe.
June 30, 1993 2400 Ended month with unit at 100% power, 945 MWe.
i l
i i
o O
Page 1
of 1
i i
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet
-Docket No.:
50-339 Report Month June Unit Name:
NA-2 Year:
1993 Date: July 1, 1993 l
Contact:
G.
E.
Kane
- No entry this mcnth.
1 r
's
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-339' UNIT NAME:
NA-2 i
DATE: July 1, 1993
' REPORT MONTH: June 1993' CONTACT: G.
E.
Kane
-PHONE: (703) 894-2101
?
1 2-3 4
5 No.
Date Type Duration Reason.
Method of Licer le System Component Cause & Corrective-(hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence oNo entry this month.
3: Method 4:
1: Type 2: Reason
- (explain) 1= Manual Exhibit F - Instructions F= Forced A= Equipment Failure S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee t D= Regulatory Restriction 4= Continuations Event Report (LER) File.
E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) 4 F= Administrative 9=Other G= Operational Error 5:
H=Other.(explain)'
Exhibit H - Same Source-