Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045D100 + (ML20045D100)
- NG-93-2419, Monthly Operating Rept for May 1993 for Duane Arnold Energy Ctr + (ML20045D101)
- ML20045D102 + (ML20045D102)
- ML20045D103 + (ML20045D103)
- ML20045D105 + (ML20045D105)
- 05000245/LER-1991-018, :on 910417,hydraulic Snubber Visual Insp Procedure Inadequacy Identified.Caused by Misapplication of Bergen Patterson Technical Info Bulletin 1-104-5/79-300, Rev 0.Maint Procedure MP 739.5 Revised + (ML20045D107)
- ML20045D108 + (ML20045D108)
- ML20045D109 + (ML20045D109)
- ML20045D110 + (ML20045D110)
- ML20045D112 + (ML20045D112)
- ML20045D113 + (ML20045D113)
- ML20045D114 + (ML20045D114)
- ML20045D115 + (ML20045D115)
- ML20045D116 + (ML20045D116)
- ML20045D117 + (ML20045D117)
- ML20045D119 + (ML20045D119)
- 05000333/LER-1992-015-01, :on 920317,deficiencies W/Potential to Effect Safe Shutdown During Postulated Fires Identified Due to Lack of Commitment to Fire Protection Implementation by Mgt.Plant Mods Scheduled + (ML20045D120)
- ML20045D121 + (ML20045D121)
- ML20045D132 + (ML20045D132)
- ML20045D136 + (ML20045D136)
- ML20045D138 + (ML20045D138)
- ML20045D141 + (ML20045D141)
- IR 07200001/1993002 + (ML20045D143)
- ML20045D144 + (ML20045D144)
- ML20045D146 + (ML20045D146)
- ML20045D149 + (ML20045D149)
- ML20045D151 + (ML20045D151)
- 05000324/LER-1993-007-02, :on 930522,discovered That MSL D High Flow Trip Unit Failed Downscale Due to Personnel Error.Appropriate Operations Personnel Counselled + (ML20045D153)
- PNO-III-93-032A, on 930618,shutdown Initiated After Damage to HPCI Turbine Labyrinth Seal Due to 930609 Rupture Disc Event Discovered.Hpci Pump Thrust Bearing Replaced + (ML20045D157)
- ML20045D162 + (ML20045D162)
- ML20045D163 + (ML20045D163)
- ML20045D167 + (ML20045D167)
- ML20045D170 + (ML20045D170)
- ML20045D173 + (ML20045D173)
- ML20045D175 + (ML20045D175)
- ML20045D177 + (ML20045D177)
- DD-93-08, Order.* Pursuant to 10CFR2.772(g),time within Which Commission May Act to Take Review of Director Decision DD-93-08,dtd 930423,hereby Extended Until 930719. W/Certificate of Svc.Served on 930617 + (ML20045D181)
- ML20045D183 + (ML20045D183)
- 05000293/LER-1993-010, :on 930519,SUT Became de-energized During Planned Calibr of Turbine/Generator Relays Lockout Test While Shut Down.Caused by Personnel Error.Discussion Conducted W/Personnel Re Attention to Detail + (ML20045D186)
- ML20045D187 + (ML20045D187)
- ML20045D189 + (ML20045D189)
- ML20045D190 + (ML20045D190)
- ML20045D193 + (ML20045D193)
- ML20045D196 + (ML20045D196)
- ML20045D199 + (ML20045D199)
- ML20045D201 + (ML20045D201)
- IR 05000341/1993007 + (ML20045D202)
- ML20045D207 + (ML20045D207)
- ML20045D208 + (ML20045D208)
- ML20045D210 + (ML20045D210)
- ML20045D213 + (ML20045D213)