Forwards Engineering & Technical Support Insp 50-341/93-07 on 930329-0602 & Notice of Violation
ML20045D190
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/21/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20045D191 List:
References
NUDOCS 9306280078
Download: ML20045D190 (3)


See also: IR 05000341/1993007

Text

_

-

.

JUN 211933

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

6400 North Dixie Highway

Newport, MI 48166

Dear Mr. Gipson:

This refers to the engineering and technical support inspection conducted by

Messrs. I. T. Yin, Z. Falevits, and K. Salehi of this office on March 29

through June 2, 1993. The inspection included a review of activities

authorized for your Fermi 2 facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

i

enclosed report.

Subsequent to the inspection, a telephone exit was held on

June 2,1993, to discuss additional technical and regulatory issues.

Areas examined during the inspection are identified in the report.

The

inspection focused on your control and implementation of plant design changes

and corrective actions.

The enclosed copy of our inspection report identifies

areas examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative records,

,

'

observations, and interviews with personnel. The purpose of the inspection

was to determine whether activities were authorized by the license were

conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice.

Although 10 CFR 2.201 requires you to submit to this office, within 20 days of

your receipt of this Notice, a written statement of explanation, we note that

Part b. of this violation had been corrected and those actions were reviewed

during this inspection. Therefore, no response with respect to Part b. is

required. With regard to Part a. of the enclosed Notice of Violation

(Notice), the violation is of concern because it identified a weakness in your

engineering evaluations of water hammer events.

l

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

f

9306280078 930621

[#

PDR

ADOCK 0500034.1

0

PDR

'

}

,

)

,

.

.

_

.

.

..

The Detroit Edison Company

2

JUN 211993

actions you plan to prevent recurrence.

After reviewing-your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

,

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C6GNAL ENED BY T. Q M AP,TR{

,

T. O. Martin, Acting Director

Division of Reactor Safety

.;

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-341/93007(DRS)

cc w/ enclosures:

John A. Tibai, Supervisor of

Compiiance

P. A. Marquardt, Corporate

Legal Department

OC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

_

Fermi LPM, NRR

i

W. Hodges, RI

A. Gibson, RII

S. Collins, RIV

K. Perkins, RV

bcc w/ enclosures:

PUBLIC-IE01

RIII

RIII

TIT

RIII

RIII

RIII

RIII

[ ----- see previous page for concurrence ---- ]

p\\

Yin /cg/jk

Falevits Salehi

Burgess

Phillips Lange

TMartin

06/16/93

06/ /93 06/ /93 06/ /93 06/ /93 06/ /93 06/o/93

_ _

..

._

.

t

,

The Detroit Edison Company

2

,

i

actions you plan to prevent recurrence. After reviewing your response to'this

Notice, including your proposed corrective actions and the results ~of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will. be placed

'

in the NRC Public Document Room.

!

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

requl red by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

T. O. Martin, Acting Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

't

2.

Inspection Report

+

No. 50-341/93007(DRS)

cc w/ enclosures:

John A. Tibai, Supervisor of

Compliance

P. A. Marquardt, Corporate

-

Legal Department

OC/LFDCB

'

Resident Inspector, RIII

James R. Padgett, Michigan

'

Public Service Commission

Michigan Department of

Public Health

Monroe County Office of

t

Civil Preparedness

Fermi LPM, NRR

W. Hodges, RI

.'

A. Gibson, RII

S. Collins, RIV

K. Perkins, RV

bcc w/ enclosures:

PUBLIC-IE01

9

RIII

RJIf',-

I

Fl1RI /

Rillr ,

R

RI)}ih

Iyhf

,

y

Cf,IItv

.J

i

I

Yiri c4/jk

Fa1

ts

St. eh"i'

Ifurgess

P

lips

L

TMartin

/

06/l>/93 06/[/93 06/ /93

06/16/93

06/(b /93 06/b/93 06/i4/93

- .

- -

- - -

=

.-

+ 'r