Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045A965 + (ML20045A965)
- ML20045A966 + (ML20045A966)
- ML20045A967 + (ML20045A967)
- ML20045A969 + (ML20045A969)
- ML20045A970 + (ML20045A970)
- ML20045A971 + (ML20045A971)
- ML20045A972 + (ML20045A972)
- ML20045A974 + (ML20045A974)
- ML20045A975 + (ML20045A975)
- ML20045A976 + (ML20045A976)
- BVY-93-055, Monthly Operating Rept for May 1993 for Vermont Yankee Nuclear Power Station + (ML20045A977)
- ML20045A978 + (ML20045A978)
- ML20045A982 + (ML20045A982)
- ML20045A984 + (ML20045A984)
- ML20045A986 + (ML20045A986)
- ML20045A987 + (ML20045A987)
- ML20045A989 + (ML20045A989)
- ML20045A990 + (ML20045A990)
- 05000446/LER-1993-004-01, :on 930514,failure to Satisfy TS Surveillance for Verification of Valve Position Due to Valve Discrepancies Discovered During DBD Review.Valve Cap & Clearance Installed + (ML20045A991)
- ML20045A992 + (ML20045A992)
- ML20045A995 + (ML20045A995)
- ML20045A997 + (ML20045A997)
- ML20045A998 + (ML20045A998)
- ML20045A999 + (ML20045A999)
- ML20045B000 + (ML20045B000)
- ML20045B002 + (ML20045B002)
- ML20045B004 + (ML20045B004)
- ML20045B005 + (ML20045B005)
- ML20045B007 + (ML20045B007)
- ML20045B010 + (ML20045B010)
- ML20045B016 + (ML20045B016)
- ML20045B019 + (ML20045B019)
- ML20045B020 + (ML20045B020)
- ML20045B024 + (ML20045B024)
- ML20045B026 + (ML20045B026)
- ML20045B027 + (ML20045B027)
- ML20045B031 + (ML20045B031)
- HL-3341, Informs of Organizational Changes,Per 920818 Application Which Would Authorize Southern Nuclear Operating Co,Inc to Become Licensed Operator & Have Responsibility & Control Over Physical Const,Operation & Maint of Plant + (ML20045B036)
- 05000321/LER-1993-009, :on 930514,scram Occurred When Mode Switch Moved to Run Position Due to Blown Fuses in Rps.Procedures 52PM-B21-005-1S,52PM-B21-005-2S & 52GM-MEL-007-0S Revised + (ML20045B037)
- 05000321/LER-1993-010, :on 930514,unplanned ESF Actuation Occurred Due to Less That Adequate Procedures.Procedures 34SV-B21-001-1S & 34SV-B21-001-2S, MSIV Closure Instrument Functional Test Revised + (ML20045B040)
- ML20045B041 + (ML20045B041)
- ML20045B053 + (ML20045B053)
- HL-3337, Special Rept 93-004:on 930512,fire Rated Assemblies Were Inoperable for More than 14 Days Due to Inadequate Design. LCO 1-93-2010 Initiated,Appropriate Fire Detectors Were Verified Operable & Fire Watch Established + (ML20045B064)
- ML20045B067 + (ML20045B067)
- ML20045B071 + (ML20045B071)
- ML20045B073 + (ML20045B073)
- 05000321/LER-1993-011, :on 930521,partial Group 1 Primary Containment Isolation Sys Actuation Occurred Due to Component Failure. MSLRM Returned to Svc,Failed electro-pneumatic Control Valve in MSIVs Replaced + (ML20045B076)
- ML20045B079 + (ML20045B079)
- ML20045B082 + (ML20045B082)
- ML20045B084 + (ML20045B084)
- ML20045B085 + (ML20045B085)