4 Norttrd.i States Power Company l
414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telepnone (612) 330-5500 i
June 11, 1993 Monticello Technical Specifications t
Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELil) NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Nav. 1993 Attached is the Monthly Operating Report for May, 1993 for the Monticello Nuclear Generating Plant.
/>
,, l
/l lGj?t'? O'ff g,r lRogerOAnderson en Director Licensing and Management 1ssues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Rris Sanda Attachsent J
9306150410 930531 7
/
I b,f '
PDR ADDCy 05000263 Y
s R
PDR il I e-w.
-OPERATING DATA REPORT DOCKET NO.
50-263 DATE 6-1-93 COMPLETED BY H. H. Paustian TELEPHONE-612/295-5151 OPERATING STATUS
] Notes
).
- 1. Unit Name :
Monticello
]
]-
- 2. Reporting period:
May
]
]
- 3. Licensed Thermal Power (IC4t ) :
1670
]
]
- 4. Nameplate Rating (Gross MWe):
569
]
]
j
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
6~. Maximum Dependable Capacity (Gross MWe): __564
]
]
- 7. Maximum Dependable Capacity. (Net MWe) :
536
]
)
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
1 i
- 9. Power Level To Which Restricted, If Any (Net MWe):
JJ/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 3623 192144-
- 12. Number Of Hours Reactor Was Critical 744.0 2286.0 154270.7.
- 13. Reactor Reserve Shutdown-Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 2235.8 151512.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 R
- 16. Gross Thermal Energy Generated (IC4H) 1236641 3429198 232822611 17.' Gross Electrical Energy Generated (1901) 422340 1164610 78695410
- 18. Net Electrical Energy Generated (1604) 407504 1115447-75271334
- 19. Unit Service Factor 100.0%
61.7%
78.9%
- 20. Unit Availability Factor 100.0%
61.7%
78.9%
- 21. Unit Capacity Factor (Using MDC Net) 102.2%
57.4%
'73.1%
- 22. Unit Capacity Factor (Using DER Net) 100.4%
56.5%
71.8%'
- 23. Unit Forced Outage Rate
.0.0%
2.6%
3.7%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL
'1 DOCKET NO.
50-263 t
UNIT-Monticello___.
I DATE 6-1-93
-l COMPLETED-BY H.
H.
Paustian TELEPHONE 612/295-5151-MONTH OF May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
-(MNe-Net)
)
1 554.
17 549.
-2 553.
18 546.
3 552.
19 552.
i 4
- 552, 20 551.
S 553.
21 549.
6 547.
22 553.
l 7
550._
23 551.
)
8 518.
24 547.
.]
l 9
504.
25 549.
10 550.
26 549.
11 549.
27 548.
12 553.
28 550.
13 546.
29 551.
14 549.
30 551.
15 552.
31 552.
16 547.
INSTRUCTIONS On this format, list the average daily unit power. level in MWe-Net for each
+
day in the reporting month.
Compute to the nearest whole megawatt.
i
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
~,
.a DOCKET NO.
50-263 DATE 16-1-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 h
MONTH-MAY
.1 5-1-93 to Power operation, j
5-8-93 3
5-8-93 Power reduced to 60% for Reactor Feed Pump repair, Main I
to Steam Isolation. Valve quarterly testing,.and monthly turbine 5-9-93 valve testing.
l 5-9-93
.to Power operation.
5-31-93 3
a v
- l Y
.i i
i k
i I
i j
i Note: Power operation defined as essentially 100% of
-rated power except for weekend load drops for specified surveillance testing.
J
\\
l l
IR11T SHUIDOUMS AND POUER REMXXIONS DOCKET NO.
50-263 s'
UNIT NAME MonticE'iio DATE 06-01 -
COMPLETED BY 11. H. Paustian REPORT MONTH May TELEPHONE 312/295-5151 -
- ~
No.
Date Type Duratien Reason Method LER System Como.
Cause & Corrective 11)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
(5)
Prevent Recurrence (3) 4 05-08-93 S
0.0 B
4 N/A Power reduction to 60% to repair leaking Reactor Feed, Pump and perform quarterly MSIV and monthly turbine control valve testing.
i l
1 2
3 4
F: Forced Reason-Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) e,-.-.
x
~-w e
r
- ~
a w
w
=m
- +e n
r,m em
+-,r e -
er s
4 e-=,-
.c
+.se-
- w.. -c.e
-,n-m