Monthly Operating Rept for May 1993 for Monticello Nuclear Generating Plant
ML20045A970
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/31/1993
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306150410
Download: ML20045A970 (5)


Text

.

4 Norttrd.i States Power Company l

414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telepnone (612) 330-5500 i

June 11, 1993 Monticello Technical Specifications t

Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELil) NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Nav. 1993 Attached is the Monthly Operating Report for May, 1993 for the Monticello Nuclear Generating Plant.

/>

,, l

/l lGj?t'? O'ff g,r lRogerOAnderson en Director Licensing and Management 1ssues c:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Rris Sanda Attachsent J

9306150410 930531 7

/

I b,f '

PDR ADDCy 05000263 Y

s R

PDR il I e-w.

-OPERATING DATA REPORT DOCKET NO.

50-263 DATE 6-1-93 COMPLETED BY H. H. Paustian TELEPHONE-612/295-5151 OPERATING STATUS

] Notes

).

1. Unit Name :

Monticello

]

]-

2. Reporting period:

May

]

]

3. Licensed Thermal Power (IC4t ) :

1670

]

]

4. Nameplate Rating (Gross MWe):

569

]

]

j

5. Design Electrical Rating (Net MWe):

545.4

]

]

6~. Maximum Dependable Capacity (Gross MWe): __564

]

]

7. Maximum Dependable Capacity. (Net MWe) :

536

]

)

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

1 i

9. Power Level To Which Restricted, If Any (Net MWe):

JJ/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 744 3623 192144-
12. Number Of Hours Reactor Was Critical 744.0 2286.0 154270.7.
13. Reactor Reserve Shutdown-Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 2235.8 151512.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 R
16. Gross Thermal Energy Generated (IC4H) 1236641 3429198 232822611 17.' Gross Electrical Energy Generated (1901) 422340 1164610 78695410
18. Net Electrical Energy Generated (1604) 407504 1115447-75271334
19. Unit Service Factor 100.0%

61.7%

78.9%

20. Unit Availability Factor 100.0%

61.7%

78.9%

21. Unit Capacity Factor (Using MDC Net) 102.2%

57.4%

'73.1%

22. Unit Capacity Factor (Using DER Net) 100.4%

56.5%

71.8%'

23. Unit Forced Outage Rate

.0.0%

2.6%

3.7%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
None
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL

'1 DOCKET NO.

50-263 t

UNIT-Monticello___.

I DATE 6-1-93

-l COMPLETED-BY H.

H.

Paustian TELEPHONE 612/295-5151-MONTH OF May DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

-(MNe-Net)

)

1 554.

17 549.

-2 553.

18 546.

3 552.

19 552.

i 4

552, 20 551.

S 553.

21 549.

6 547.

22 553.

l 7

550._

23 551.

)

8 518.

24 547.

.]

l 9

504.

25 549.

10 550.

26 549.

11 549.

27 548.

12 553.

28 550.

13 546.

29 551.

14 549.

30 551.

15 552.

31 552.

16 547.

INSTRUCTIONS On this format, list the average daily unit power. level in MWe-Net for each

+

day in the reporting month.

Compute to the nearest whole megawatt.

i

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

~,

.a DOCKET NO.

50-263 DATE 16-1-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 h

MONTH-MAY

.1 5-1-93 to Power operation, j

5-8-93 3

5-8-93 Power reduced to 60% for Reactor Feed Pump repair, Main I

to Steam Isolation. Valve quarterly testing,.and monthly turbine 5-9-93 valve testing.

l 5-9-93

.to Power operation.

5-31-93 3

a v

l Y

.i i

i k

i I

i j

i Note: Power operation defined as essentially 100% of

-rated power except for weekend load drops for specified surveillance testing.

J

\\

l l

IR11T SHUIDOUMS AND POUER REMXXIONS DOCKET NO.

50-263 s'

UNIT NAME MonticE'iio DATE 06-01 -

COMPLETED BY 11. H. Paustian REPORT MONTH May TELEPHONE 312/295-5151 -

  • ~

No.

Date Type Duratien Reason Method LER System Como.

Cause & Corrective 11)

(hours)

(2) of No.

Code Code Action to Shutdown (4)

(5)

Prevent Recurrence (3) 4 05-08-93 S

0.0 B

4 N/A Power reduction to 60% to repair leaking Reactor Feed, Pump and perform quarterly MSIV and monthly turbine control valve testing.

i l

1 2

3 4

F: Forced Reason-Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) e,-.-.

x

~-w e

r

  • ~

a w

w

=m

  • +e n

r,m em

+-,r e -

er s

4 e-=,-

.c

+.se-

w.. -c.e

-,n-m