Monthly Operating Repts for May 1993 for North Anna Power Station,Units 1 & 2
ML20045A974
Person / Time
Site: North Anna  
Issue date: 05/31/1993
From: Bowling M, Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-366, NUDOCS 9306150419
Download: ML20045A974 (12)


Text

r

1 VIRGINIA ELECTRIC AND PowEn CourANY RICI!MOND. VIRGINIA 23201 June 10, 1993 i

i i

U. S. Nuclear Regulatory Commission Serial No.93-366 Attention: Document Control Desk NL&P/JMJ:jm]

i Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 l

NPF-7 l

Gentlemen:

i VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPER ATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of May 1993.

Very truly yours,

/l^

?)

M. L Bowling, Manager Nuclear Licensing and Programs t

Enclosure cc:

U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite' 2900 Atlanta, GA 30323 Mr. D. R. Taylor NRC Resident inspector North Anna Power Station f

l f

1h'I j/v I,(

/

i

=

$386110$$ OSOSkj8 h R

'l

o VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

May YEAR:

1993 Approved:

Y i

' St'ation Manager I

CPERATING DATA REPORT DOCKET NO.:

50-338 DATE: June 1,1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 DPERATING STATUS Un i t N ame :............................... N or t h Anna 1 2.

R epor t i ng Per i od:.......................Ma y 1993 3.

L i c ens ed Therma l Power (MWt ):..........

2,893 4.

tameplat e R at i ng (Gross KWe):.............

947 5.

Design Electrical Rating (Net MWe):.......

907 6.

MIximum Dependable Capacity (Cross MWe):..

959 7.

Muinun Dependable Capacity (Net MWe)....

911 8.

If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:__The licensed thermal power has been increased due to the recent steam generator rep!acements which allows resuming 100%

power production. The maxinun dependable capacities have been changed to ";f tect the return to 100% power production.

9.

Power level to which restricted, if any (Net MWe):

N/A

10. Reasons f or restrictions, if any:

N/A This Month Y-t-D Cumulative

11. Hours in Report i ng Peri od......................

744.0 3,623.0 130,979.0

12. Number of Hours R eact or was cri t i ca t.....................

744.0 1,337.9 95,268.7

13. Reac t or Reserve shut down H ours..........................

0.0 68.8 6,826.8

14. Hours Generator On-Line..................................

744.0 1,307.2 92,303.9

15. Unit Rese ve shutdown Hours.............

0.0 0.0 0.0

16. Gross T hernal E nergy Gener at ed (MWH)..................... 2,151,558.6 3,422,211.9 243,593,398.8
17. Grocs S tectrical Energy Generated (MWH).........

708,185.0 1.122,807.0 80,049,712.0

18. Net Electrient Energy Generated (MWH).........

674,002.0 1,066,136.0 75,780,076.0

19. Unit Service factor........

100.0%

36.1%

70.5%

20. Unit Availability Factor...............

100.0%

36.1%

70.5%

21. Unit Capacity Factor (using MDC Net).....

99.4%

34.2%

64.8%

22. Unit Capacity Factor (using DER Wet).

99.9%

32.4%

63.8%

23. F or c ed Dut ag e R a t e....................................

0.0%

0.0%

11.3%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each),,_N/A
25. If shutdown at erd of Report Period, estimated time of startup:_N/A
26. Unit m Test Status (Prior to Consnercist Operation):

Fore:est Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION

l AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-338 Unit:

NA-1 Date:

June 1.

1993

Contact:

G. E.

Kane j

Phone:

(703) 894-2101 MONTH:

May 1993 t

8 DAY A7ERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 904 17 908 2

904 18 908 3

906 19 909 4

905 20 901 5

904 21 903 6

906 22 902 7

909 23 903 8

910 24 901 i

9 909 25 901 10-909 26 902 11 909 27 908 12 908 28 908 13 908 29 907 14 897 30 908 15 908 31 907 16 909 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NORTH ANNA POWER STATION UNIT NO.:

1 MONTH:

May

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data May 01, 1993 0000 Began month with unit at 100% power, 950 MWe.

May 14, 1993 0905 Commenced unit ramp-down for TVFT.

1040 TVFT completed satisfactorily.

1200 Commenced unit ramp-up to 100% power.

l 1348 Unit stable at 100% power, 955 MWe.

May 31, 1993 2400 Ended month with unit at 100% power, 955 MWe.

i i

Page 1

of __1 i

t UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month May Unit Name:

NA-1 t

Year:

1993 Date: June 1, 1993

Contact:

G.

E.

Kane

  • No entry this month.

i 4

4 k

b i

5 A

1 I

i i

4 l

1

?

1 1

UNIT SHUTDOWNS AND POWER REDUCTIONS b

4 DOCKET NO.:

50-338,

UNIT NAME:

NA-1 DATE: June 1, 1993 REPORT MONTH: May 1993 CONTACT:

G.

E.

Kane' PHONE: (703) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Causc & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence oNo entry this month.

1: Type 2:. Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source b

e---s v

w,

<cw r

v var,w-w-w w-<v--

v 3, v t-+ v vt-+r v w ve v+

vvv er r wwer-=--r-v-+er

-mv-*w-t-s*-

-*i-o-w-*rvev

,v--

e v e' e -e w ww*v e et v-t we--*e-e

=>w'-v,*

44

+ m.*--m*=

=~e,+e-

---a er am2+

+

~-

C7ESATING DATA REPC3T DOCKET No.:

50-339 DATE: June 1,1993 CONTACT:

G. E. Kane l

PHONE: (703) 894-2101 1

OPERATING STATUS 1.

Uni t N ame :................................ North Anna 2 2.

Seport i ng Per i od:.........................May 1993 3.

Licensed Thermal Power (MWt):.............

2893 4.

N amepl at e R a t i ng ( Gross MWe):.............

947 5.

Design Electrical Rating (Net MWe):.......

907-6.

Caxinun Dependable capacity (Gross MWe):..

957 7.

Maximum Dependable Capacity (Net MWe):....

909 l

8.

If changes occur in capacity Ratings (Items No. 3 thru 7) since test report, give reasons:

N/A

'l L

9.

Power level to which restricted, if any (Net NWe):

N/A I

10. Reasons for restrictions, if any:

N/A l

i f

This Month Y-t-D Cumulative

11. H ours i n R eport i ng Per i od................................

744.0 3,623.0 109,247.0

[

12. Number of Hours R eac t or was Cr i t i ca l.....................

744.0 3,391.5 90,435.7 l

13. Reac t or Reserve Shut down Hours...........................

0.0 120.8 6,365.2

14. H ours Genera t or On-L i ne..................................

744.0 3,381.4 89,394.5 i

15. Unit Reserve Shutdown Hours.............................

0.0 0.0 0.0

16. Gross T he rm6 L E nergy Generat ed ( M JH ).................... 2,148,538.3 9,585,529.6 241,710,294.1
17. Gross E lectrical Energy Generated (MWH)..................

703,327.0 3,136,772.0 79,173,488.0

18. Ne t E l ec t ri c a l Ene rgy Genera t ed (MWH )....................

668,465.0 2,982,792.0 75,807,273.0

19. Unit Service Factor......................................

100.0%

93.3%

21.B%

{

20. Uni t Ava i l abi l i t y f ac t or................................

100.0%

93.3%

81.8%

l

21. Un i t c apac i t y f ac t or (us i ng MDC Net ).....................

98.3%

90.6%

77.0%

t

22. Uni t Capac i ty F ac t or ( us ing DE R Ne t )....................

99.1%

90.8%

76.5%

23. F orc ed Dut age R a t e.......................................

0.0%

6.7%

5.6%

l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling outage, September 4, 1993, 60 days, j

i l

25. If Shutdown at end of Report Period, estimated time of Startup:

N/A

26. Units in Test Status (Prior to Comercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION a,

1 1

1

4 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

June'1, 1993

Contact:

G.

E. Kane Phone:

(703) 894-2101 MONTH:

May 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 856 17 885 2

902 18 886 3

903 19 886 4

903 20 886 5

903 21 904 6

903 22 905 7

904 23 904 8

903 24 904 9

903 25 904 10 903 26 904 11 902 27 904 12 901 28 903 13 901 29 902 14 902 30 903 15 888 31 902 16 895 Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

NORTH ANNA POWER STATION UNIT NO.:

2 MONTH:

May

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

surmary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

Date Time Data May 01, 1993 0000 Began month with unit at approximately 64% power, 595 MWe and ramping to 100% power.

0937 Unit stable at 100% power, 945 MWe.

May 9, 1993 0219 The "C"

S/G PORV opened to approximately 40% with no apparent cause.

Indicated power increase from 100.0% to 100.3%.

0229 "C"

S/G PORV manually overridden close.

0241 "C" S/G PORV isolated.

i May 15, 1993 0245 Secured 2-SD-P-1B for maintenance, resulting in operation of 2-SD-TK-1B i

)

and 2-FW-E-2B on high level diverts.

1 May 20, 1993 2320 Returned 2-SD-P-1B and associated I

equipment to service.

May 31, 1993 2400 Ended month with unit at 100% power, 947 MWe.

~

~

Page 1

of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-339 Report Month May Unit Name:

NA-2 Year:

1993 Date: June 1.

1993

Contact:

G.

E.

Kane

  • No entry this month.

E

3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-339.

I UNIT NAME:

NA-2 DATE: June 1, 1993 REPORT MONTH: May 1993 CONTACT:

G.

E. Kane PHONE: (703) 894-2101 1

2 3

4 5

No.

Date Type Duration. Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence ONo entry this month.

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram-for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training &. License Examination-5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same-Source

-