MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
r .,;_
.. :1 VIRGINIA ELECTRIC AND PowEn CourANY RICI!MOND. VIRGINIA 23201 June 10, 1993 ;
i i
i U. S. Nuclear Regulatory Commission Serial No.93-366 Attention: Document Control Desk NL&P/JMJ:jm] i Washington, D.C. 20555 Docket Nos. 50-338 !
50-339 :
License Nos. NPF-4 l NPF-7 l Gentlemen: ;
i VIRGINIA ELECTRIC AND POWER COMPANY !
NORTH ANNA POWER STATION UNITS 1 AND 2 :
MONTHLY OPER ATING REPORT .
Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 .;
for the month of May 1993. :!
Very truly yours, ,
/l^ ?)
M. L Bowling, Manager -
Nuclear Licensing and Programs !
t Enclosure cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, NW ;
Suite' 2900 -
Atlanta, GA 30323 ,
Mr. D. R. Taylor NRC Resident inspector North Anna Power Station f
l f
= /
1h'I i
$386110$$ OSOSkj8 h j/v I,(
R 'l
- o ..
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT ;
MONTH: May YEAR: 1993 Approved:
i Y
' St'ation Manager l I
l
CPERATING DATA REPORT DOCKET NO.: 50-338 DATE: June 1,1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 DPERATING STATUS Un i t N ame : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N or t h Anna 1
- 2. R epor t i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . .Ma y 1993
- 3. L i c ens ed Therma l Power (MWt ): . . . . . . . . . . .. 2,893
- 4. tameplat e R at i ng (Gross KWe): . . . . . . . . . . . . . 947
- 5. Design Electrical Rating (Net MWe):....... 907
- 6. MIximum Dependable Capacity (Cross MWe):.. 959
- 7. Muinun Dependable Capacity (Net MWe) .... 911
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:__The licensed thermal power has been increased due to the recent steam generator rep!acements which allows resuming 100%
power production. The maxinun dependable capacities have been changed to ";f tect the return to 100% power production.
- 9. Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons f or restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours in Report i ng Peri od. . . . . . . . . . . . . . . . . . . . . . .. .. 744.0 3,623.0 130,979.0
- 12. Number of Hours R eact or was cri t i ca t . . . . . . . . . . . . . . . . . . . . . 744.0 1,337.9 95,268.7
- 13. Reac t or Reserve shut down H ours. . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 68.8 6,826.8
- 14. Hours Generator On-Line.................................. 744.0 1,307.2 92,303.9
- 15. Unit Rese ve shutdown Hours............. ................ 0.0 0.0 0.0
- 16. Gross T hernal E nergy Gener at ed (MWH) . . . . . . . . . . . . . . . . . . . . . 2,151,558.6 3,422,211.9 243,593,398.8
- 17. Grocs S tectrical Energy Generated (MWH)......... ....... 708,185.0 1.122,807.0 80,049,712.0
- 18. Net Electrient Energy Generated (MWH)......... .......... 674,002.0 1,066,136.0 75,780,076.0
- 19. Unit Service factor........ ..... ....................... 100.0% 36.1% 70.5%
- 20. Unit Availability Factor............... .. .............. 100.0% 36.1% 70.5%
- 21. Unit Capacity Factor (using MDC Net)..... .............. 99.4% 34.2% 64.8%
- 22. Unit Capacity Factor (using DER Wet). ............. .. 99.9% 32.4% 63.8%
- 23. F or c ed Dut ag e R a t e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0% 0.0% 11.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each),,_N/A
- 25. If shutdown at erd of Report Period, estimated time of startup:_N/A
- 26. Unit m Test Status (Prior to Consnercist Operation):
Fore:est Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION
l AVERAGE DAILY UNIT POWER LEVEL ,
Docket No.: 50-338 Unit: NA-1 !
Date: June 1. 1993
Contact:
G. E. Kane j Phone: (703) 894-2101 MONTH: May 1993 !
t 8
DAY A7ERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 904 17 908 2 904 18 908 ,
3 906 19 909 4 905 20 901 5 904 21 903 6 906 22 902 7 909 23 903 8 910 24 901 i 9 909 25 901 10- 909 26 902 11 909 27 908 12 908 28 908 13 908 29 907 14 897 30 908 15 908 31 907 16 909 ,
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
NORTH ANNA POWER STATION
, UNIT NO.: 1 MONTH: May
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data May 01, 1993 0000 Began month with unit at 100% power, 950 MWe.
May 14, 1993 0905 Commenced unit ramp-down for TVFT.
1040 TVFT completed satisfactorily.
1200 Commenced unit ramp-up to 100% power.
l 1348 Unit stable at 100% power, 955 MWe.
May 31, 1993 2400 Ended month with unit at 100% power, 955 MWe.
. i
. i Page 1 of __1 i t
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month May Unit Name: NA-1 t Year: 1993 Date: June 1, 1993 .
Contact:
G. E. Kane
i 4
4 k
b
.:i 5
A 1
I i
i 4
l 1
?
1 1
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
b 4
DOCKET NO.: 50-338 ,
UNIT NAME: NA-1 DATE: June 1, 1993 REPORT MONTH: May 1993 CONTACT: G. E. Kane' ,
PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Causc & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence oNo entry this month.
1: Type _
2: . Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same Source b
e---s v w, <cw r v var ,w-w-w w-<v-- v 3, v t-+ v vt-+r v w ve v+ vvv er r wwer-=--r-v-+er -mv-*w-t-s*- -*i-o-w-*rvev ,v-- e v e' e -e w ww*v e et v- t we--*e- e =>w'-v,* - 44 + m.*--m*= =~e,+e- ---a er -- - am2+ - - - -
+
~-
C7ESATING DATA REPC3T DOCKET No.: 50-339 $
DATE: June 1,1993 ,
CONTACT: G. E. Kane l PHONE: (703) 894-2101 1
OPERATING STATUS
- 1. Uni t N ame : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . North Anna 2
- 2. Seport i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . . . .May 1993
- 3. Licensed Thermal Power (MWt):.. . ..... .... . 2893
- 4. N amepl at e R a t i ng ( Gross MWe): . . . . . . . . . . . . . 947
- 5. Design Electrical Rating (Net MWe):....... 907- ,
- 6. Caxinun Dependable capacity (Gross MWe):.. 957
- 7. Maximum Dependable Capacity (Net MWe):.... 909 l
- 8. If changes occur in capacity Ratings (Items No. 3 thru 7) since test report, give reasons: ,
N/A 'l L
- 9. Power level to which restricted, if any (Net NWe): N/A I
- 10. Reasons for restrictions, if any: N/A l
i This Month Y-t-D Cumulative f
- 11. H ours i n R eport i ng Per i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0 109,247.0 [
- 12. Number of Hours R eac t or was Cr i t i ca l . . . . . . . . . . . . . . . . . . . . . 744.0 3,391.5 90,435.7 l
- 13. Reac t or Reserve Shut down Hours. . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 120.8 6,365.2 ,
- 14. H ours Genera t or On- L i ne. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 3,381.4 89,394.5 :
i
- 15. Unit Reserve Shutdown Hours...... ....................... 0.0 0.0 0.0 -
- 16. Gross T he rm6 L E nergy Generat ed ( M JH ) . . . . . . . . . . . . . . . . . . . . 2,148,538.3 9,585,529.6 241,710,294.1
- 17. Gross E lectrical Energy Generated (MWH)... . . . .. .. ...... .. 703,327.0 3,136,772.0 79,173,488.0
- 18. Ne t E l ec t ri c a l Ene rgy Genera t ed (MWH ) . . . . . . . . . . . . . . . . . . . . 668,465.0 2,982,792.0 75,807,273.0 !
- 19. Unit Service Factor...................................... 100.0% 93.3% 21.B% {
- 20. Uni t Ava i l abi l i t y f ac t or. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100.0% 93.3% 81.8% l
- 21. Un i t c apac i t y f ac t or (us i ng MDC Net ) . . . . . . . . . . . . . . . . . . . . . 98.3% 90.6% 77.0% .
t
- 22. Uni t Capac i ty F ac t or ( us ing DE R Ne t ) . . . . . . . . . . . . . . . . . . . . 99.1% 90.8% 76.5% ;
- 23. F orc ed Dut age R a t e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0% 6.7% 5.6% l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling outage, September 4, 1993, 60 days, j i
l
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
- 26. Units in Test Status (Prior to Comercial Operation):
Forecast Achieved
, INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION _
a, 1
1 1
4 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: June'1, 1993
Contact:
G. E. Kane Phone: (703) 894-2101 MONTH: May 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 856 17 885 2 902 18 886 3 903 19 886 4 903 20 886 5 903 21 904 6 903 22 905 7 904 23 904 8 903 24 904 9 903 25 904 10 903 26 904 11 902 27 904 12 901 28 903 13 901 29 902 14 902 30 903 15 888 31 902 16 895 Instructions: '
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i
NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: May
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a surmary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data May 01, 1993 0000 Began month with unit at approximately 64% power, 595 MWe and ramping to 100% power.
0937 Unit stable at 100% power, 945 MWe.
May 9, 1993 0219 The "C" S/G PORV opened to approximately 40% with no apparent cause. Indicated power increase from 100.0% to 100.3%.
0229 "C" S/G PORV manually overridden close.
0241 "C" S/G PORV isolated. i May 15, 1993 0245 Secured 2-SD-P-1B for maintenance, i resulting in operation of 2-SD-TK-1B
) and 2-FW-E-2B on high level diverts. 1 May 20, 1993 2320 Returned 2-SD-P-1B and associated I equipment to service.
May 31, 1993 2400 Ended month with unit at 100% power, 947 MWe.
~
~
Page 1 of __1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month May Unit Name: NA-2 Year: 1993 Date: June 1. 1993
Contact:
G. E. Kane
E
3 UNIT SHUTDOWNS AND POWER REDUCTIONS ..
DOCKET NO.: 50-339.
I UNIT NAME: NA-2 DATE: June 1, 1993 REPORT MONTH: May 1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration. Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence ONo entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram- for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training &. License Examination- 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H - Same-Source