Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000413/1990200 + (ML20043F976)
- ML20043F979 + (ML20043F979)
- RBG-32951, Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately + (ML20043F980)
- ML20043F983 + (ML20043F983)
- ML20043F985 + (ML20043F985)
- ML20043F986 + (ML20043F986)
- ML20043F988 + (ML20043F988)
- ML20043F989 + (ML20043F989)
- ML20043F990 + (ML20043F990)
- ML20043F992 + (ML20043F992)
- U-601682, Comment Supporting Petition for Rulemaking PRM-50-55, Coordinating Revs of FSAR W/Refueling Cycles.Approval of Rulemaking Change Would Provide for More Logical & Timely Basis for Incorporating Plant Procedure Changes in Future + (ML20043F994)
- ML20043G002 + (ML20043G002)
- ML20043G003 + (ML20043G003)
- ML20043G009 + (ML20043G009)
- ML20043G010 + (ML20043G010)
- ML20043G012 + (ML20043G012)
- ML20043G013 + (ML20043G013)
- ML20043G014 + (ML20043G014)
- ML20043G016 + (ML20043G016)
- ML20043G019 + (ML20043G019)
- ML20043G021 + (ML20043G021)
- ML20043G023 + (ML20043G023)
- ML20043G024 + (ML20043G024)
- ML20043G027 + (ML20043G027)
- ML20043G028 + (ML20043G028)
- ML20043G044 + (ML20043G044)
- PMNS20200113, Notice of Public Meeting with the Nuclear Energy Institute Regulatory Issues Task Force + (ML20043G046)
- ML20043G050 + (ML20043G050)
- ML20043G056 + (ML20043G056)
- ML20043G057 + (ML20043G057)
- ML20043G060 + (ML20043G060)
- PNO-III-90-038, on 900612,controlled Shutdown Initiated After Small Leak Identified in Inlet Flange Joint on Pressurizer Safety Valve.In Nov 1989,leak Also Identified in Unit 2. Possible Generic Implications of Leak Being Reviewed + (ML20043G061)
- PNO-II-90-032, on 900610,hydrogen Burn in Charcoal Absorbers in Gas Treatment Bldg Occurred.Fire Lasted for More than 10 Minutes Based on Levels of Carbon Dioxide/Carbon Monoxide. Gas Treatment Bldg Purged W/Nitrogen + (ML20043G062)
- ML20043G065 + (ML20043G065)
- 0CAN069011, Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control Panels + (ML20043G066)
- ML20043G070 + (ML20043G070)
- 05000324/LER-1990-005-03, :on 900514,unplanned Closure of HPCI Isolation Valve Occurred During Maint Surveillance Test.Caused by Technician Placing RCIC Instead of HPCI Test Switch to Test Position.Personnel Counseled & Trained + (ML20043G071)
- ML20043G072 + (ML20043G072)
- PNO-I-90-046, on 900607,control Element Assemblies (Ceas) Fully Withdrawn from Fully Inserted Position During Tests. Attempts to Insert CEAs Further Were Unsuccessful.Fuel Assembly Visually Inspected.State of Me Notified + (ML20043G073)
- 05000482/LER-1990-011, :on 900514,feedwater Isolation Signal & Main Turbine Trip Signal Occurred When Steam Generator B Reached hi-hi Level Setpoint & Generator C Reached lo-lo Setpoint. Caused by Power Oscillations.Procedure Revised + (ML20043G074)
- ML20043G075 + (ML20043G075)
- ML20043G077 + (ML20043G077)
- 05000259/LER-1990-008-02, :on 900512,actuations/isolations of Various ESF Sys Occurred Due to Blown Fuse in Primary Containment Isolation Sys Logic Panel.Caused by Jumpering Wrong Relay Contact.Fuse Replaced & Logic Reset + (ML20043G079)
- ML20043G080 + (ML20043G080)
- 05000278/LER-1990-006-03, :on 900511,blown Fuse from Battery Charger 3B Resulted in Declaring HPCI Sys,Core Spray B Logic,Rhr B Logic,Core Spray Subsystem B,Rhr Subsystem B & E2 & E4 Emergency Diesel Generators Inoperable + (ML20043G082)
- IR 05000320/1990003 + (ML20043G083)
- ML20043G084 + (ML20043G084)
- ML20043G088 + (ML20043G088)
- ML20043G091 + (ML20043G091)
- IR 05000271/1990004 + (ML20043G092)
- 05000219/LER-1990-006, :on 900511,average Power Level Exceeded Licensed Limit by Approx 1.64 MW When Cleanup Sys Placed in Svc W/O 7.84 MW Loss Added Into Heat Balance Calculation. Caused by Personnel Error.Procedures Changed + (ML20043G093)