Responds to Violations Noted in Insp of License SNM-714. Corrective Actions:Procedures for Conducting SNM Inventories Revised to Assign Responsibility for Maintaining Inventory to Radiation Safety Officer
ML20043F990
Person / Time
Site: 07000738
Issue date: 06/05/1990
From: Beghian L
MASSACHUSETTS, UNIV. OF, LOWELL, MA (FORMERLY LOWELL
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9006180392
Download: ML20043F990 (3)


Text

u k

' &y9 V6,;<.nu,;p /$,,.e//

0Ar Vbri ers17y J9$<sae

$ erd (.$rssar/usein gal'54 (617) 452 5000 June 5,1990 Docket NOS.

50-223 70-738 U.S. Nuclear Regulamsy Commission, Region 1 475 Allendale Road King of Prussia, PA 19406

Dear Sirs:

This letter is in response to the Notice of Violation resulting from the NRC inspection of license # SNM-714 conducted on April 10-13,1990.. The following actions have been taken in regard to the violations listed in the notice:

Violation A.

1.

Corrective steps taken:

The seven foils containing'a total of one gram of U-235 and the fission chamber containing.35 grams of plu-tonium were added to the University of Lowell inventory form. A physical inventory of special nuclear material at the University of 1.owell w:'s completed on May 14, 1990. A copy of this inventory was sent to the NRC Region 1 office on May 15, 1990.

2.-

Corrective steps taken to avoid fuilher violations:

The proce-dures for conducting special nuclear material inventories has been revised to specifically assign the responsibility for maintaining this inventory to the University Radiation Safety Officer. These procc-dures weie sent to the NRC Region 1 Office on May 15, 1990.

3.

- Full compliance on this violation was achieved with the com-pletion of the May 15, 1990 inventory.

9006100392 900605

~

REQ 1 LIC70 SNM-0714 PDR o

M u

'l9

1

/ %

Violation B.

The Radiation Safety Office has developed a system for tracking due dates for recurring activities such as leak testing of special nu-clear material sources. The Radiation Safety Officer will be able to tell at a glance the particular activities which are due each month. The dates on which ' activities have been completed will be recorded, thus l

helping insure that all activities will be completed in the scheduled i

month.

Violation C The changes made to the Security Plan will be submitted to the NRC within the next two weeks. These changes will include the im-provements we have made to the plan and also some changes as sug-I gested by the inspector. These changes, including clarification of certain sections of the plan, will be submitted through proper chan-nels.

1 Violation D The requirement for inventory of keys will be added to our tracking system for our Tech Spec, requirements. This should pre-1 vent.any. lapse in completing this requirement of the Security Plan in i

the future.

If you have any questions regarding this response please direct l

them to Wmren Church, RSO at (508) 934-3372 or Thomas Wallace, Reactor Supervisor at (508) 934-3365.

Sincerely yours, Q k Leon. Beghian y'

Associate Vice President for Research I

i 1

-..