ML20043G023
| ML20043G023 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/30/1990 |
| From: | Newton H SOUTHERN CALIFORNIA EDISON CO. |
| To: | Coe A CALIFORNIA, STATE OF |
| Shared Package | |
| ML20043G017 | List: |
| References | |
| NUDOCS 9006180431 | |
| Download: ML20043G023 (2) | |
Text
--.
Southern California Edison Company g5
$ AN ONOFRE NUC LE AR GENER ATING $T A TION P.O. BOK 124
$ AN C LEME N TE, C A LIFORNI A $2672 May 29, 1990 j
.)
=t i
Mr. Arthur L.
Coe, Acting Executive Officer California-Regional-Water Quality Control Board San Diego Region 9771 Clairemont Mesa Boulevard, Suite B San Diego,. California 92124-1331
Dear Mr. Coe:
Subject:
NPDES Monitoring Report San Onofre Nuclear Generating Station, Unit 2 The NPDES monitoring report for San Onofre Unit 2 covering the
]
month of April is submitted in accordance with the requirements of CRWQCB Order 85-11 (NPDES Permit No. CA0108073).
A summary of the generating unit's status and significant analytical results is provided below.,
The unit was; operational'during April.
All sampled water sources wore found to be within permit limits, with the exception of 1
Combined Discharge chlorine' residual on April 12.
The pump was reset and-confirmation analysis indicated the discharge to be within limits.
The frequency of analysis has been increased to.
weekly.
An evaluation of how the chlorine pumping system can be better controlled is in progress.
Pursuant to Order No. 85-11, Reporting Requirement 12, your letter dated' June 25, 1985, authorizes the following representative to sign and certify all reports required by this order:
Arthur Knelsel, Environmental Engineer.
I certify under penalty of law that I have personally examined and am. familiar with the information submitted in the attached document, and based on my inquiry of those individuals
-immediately responsible for obtaining the information, I believe l'
l
[DR00618043; 9006.12 R
ADOCK 05000206 PDC
i
~
o.
Mr. Arthur L.
Coe May 29, 1990 NPDES. Monitoring Report i
the-submitted information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false l'n forma tion, including the possibility of fine and imprisonment.
l
'H.
W. Newton Manager, Site Support Services Enclosures cc:
' Environmental Protection Agency, Region IX
_