ML20043G024
| ML20043G024 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/30/1990 |
| From: | Newton H SOUTHERN CALIFORNIA EDISON CO. |
| To: | Coe A CALIFORNIA, STATE OF |
| Shared Package | |
| ML20043G017 | List: |
| References | |
| NUDOCS 9006180432 | |
| Download: ML20043G024 (2) | |
Text
$.
l Southern California Edison Company
,5CE S A N ONOFR E NUC LE A R GENER A TING S T A TION P.O. BO K 12 4 S AN CLEMENT E. C ALIFORNI A $$$?3 May 29, 1990 a
Mr. Arthur-L. Coe, Acting Executive Officer y
i California Regional Water Quality Control Board San Diego Region 9771 Clairemont Mesa Boulevard, Suite B San Diego, California 92124-1331
Dear Mr. Coe:
Subject:
NPDES Monitoring Report.
San Onofre Nuclear Generating station, Unit 3 The NPDES monitoring report for San Onofre Unit 3 covering the month of April is submitted in accordance with:the requirements of CRWQCD Order 85-13 (NPDES Permit No. CA0108181).
.A summary of
~
the generating unit's status and significant analytical results is.provided below.
Th'e unit was in operation through April 14 when it was taken off line for refueling.
All sampled water sources were foundito be within permit-limits,-with the exception of Combined Discharge chlorine residual on April 12.
The chlorine injection was not operated after April-12 due to the refueling outage.
The frequency of analysis has been increased to weekly.
An evaluation of how the chlorine pumping system can be better.
controlled is in: progress.
1 Pursuant to Order No. 85-13, Reporting Requirement 12,-your letter dated June 25, 1985, authorizes the-following representative to sign and certify all reports required by this order:
Arthur Kneisel, Environmental Engineer.
I certify under penalty of law that I have personally examined and am - familiar with-the information submitted in the attached document, and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe
$k$000$2 PhC 9
~
l l
Mr. Arthur L. Coe May 29, 19'90
- NPDES Monitoring Report the submitted information is true, accurate, and complete.
I;am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
S cer ly,
. W. Newton Manager, Site Support Services Enclosures cc:
Environmenta L Protection Agency, Region IX
- n i