Forwards Insp Repts 50-295/90-08 & 50-301/90-08 on 900316 & 0403.No Violations Noted.Lack of Attendance Noted During First Requalification Program Cycle
ML20043G003
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/06/1990
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20043G005 List:
References
CAL, NUDOCS 9006180411
Download: ML20043G003 (2)


See also: IR 05000295/1990008

Text

_

--

--__ _ -- ----__ ,

'

, .

. ,.

L

T,-

.

t

JUN

01999

L

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

o

L

Chicago, IL 60690

g

Gentlemen:

.

,

'

This refers to the Confirmatory Action Letter Rlll 89-02, followup inspection

[

conducted by Kristine M. Shembarger of this office on March 16, 1990 and

< April 3, 1990 of activities at Zion Generator Station, authorized by Operating

>

License DPR-39; DPR-48 and to the-discussion of our findings with Glenn Tryzna

at the conclusion of the inspection.

On April 23 and May 10, 1990 management meetings.were held between Geoffrey

Wrig1t and Thomas Joyce and others to discuss the inspection findings.

The enclosed copy of our inspection report identified areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

'

The inspection identified on attendance problem during the first requalification-

program cycle in 1990 which, while improving, also extended into the second

. cycle.

This lack of attendance was considered a weakness in the licensee's

requalification program, particularly in light of cominitments made in the

CAL.

All licensee personnel who missed this training were given the lecture

notes for review and exams on the subject material.

No violations of NRC requirements were identified during the course of this

inspection.

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

-

Public Document Room.

,

'

'

.

i

i

!

hp

\\

OF J

  • g

'

M/

g

.

lc

y

'

<

'

. .

s.

. , . -

.

,.

-

p4 '

'

. Commonwealth Edison Company

2

JUN

61990

We will gladly discuss any ~ questions you have concerning this inspection.

t

~

CRIGINAL SIGNED BY T. O. MAP. TIN

Hubert J. Miller, Director

r-

Division of Reactor Safety

1

Enclosure:

Inspection Reports

'

No. . 50-295/90-008;

No. 50-304/90008-

cc w/en::losure:

P

!

T. J. Maiman Vice President,

PWROperatlons

C'

T. Kovach, Nuclear

Licensing Manager

Station Manager

T. Joyce (RIDS)-

c

DCD/DCB

4

-.

Licensing Fee Mansgement Branch

Resident inspector, Rill

- Richard Hubbard

. J.-W.,McCaffrey, Chief, Public'

Utilities Division

Mayor, City of-Zion

~

Chandu'Patel, Project

LManager, NRR

Robert Newmann, Office of

.Public Counsel

. State of:1111nois

,

s

1

h

i

i

~.

l11

RIII

{A

& ks<

\\

RII

Ril)

,

.lWri

[.f

.(>

S en6'arg]sr/cg

t

Miller

Burdick-

6/ 6 /90 =

6/ 6/90

  • 6/ /90.

6/4 /90

=-

)