ML20043F989

From kanterella
Jump to navigation Jump to search
Submits Daily Highlight Re 900613 Meeting W/Util in Rockville,Md to Discuss Status of Crdr at Facilities
ML20043F989
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/11/1990
From: Wang A
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9006180391
Download: ML20043F989 (4)


Text

l

).p i

- p eron -

I+

1:

,j

%j UNITED STATES

-1 j

g-NUCLEAR REGULATORY COMMISSION s

,L&

t 8 WASHINGTON, D, C. 20555

k..... p June 11, 1990 l
Docket Hos. 50-245' 50-213 l

-MEMORANDUM FOR: -T. Murley*

B. Grimes-P. McKee l

F. Miraglia*

F. Congel A. Thadani W. Russell, ADT*

"J.

Roe EAB/ Acting Chief J. Partlow, ADP*

C. Grimes

J. Dyer, EDO D. Crutchfield, ADSP*

B. Boger Operations Center **

S. Varga G. Lainas F. Gillespie G. Holahan W. Travers W. Bateman i

C. Rossi B. D. Liaw L. Reyes, RII**

.l J. Richardson E.-Butcher T. Cox***

J. Zwolinski

_. Lanning-W THRU:

John F. Stolz, Director i

Project Directorate 1-4 Division of Reactor Projects - 1/11 i

FROM:-

-Alan B. Wang, Project Manager Project Directorate 1-4 Division of Reactor Projects - 1/11 f

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEET 1tlG WITH NORTHEAST UTILITIES I"T: & TIME:

June 13, 1990, 10 a.m. - 12 p.m.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, MD-y Room 8-D-11 PURPOSE:

To discuss the status of the. Control Room Design Reviews at Millstone 1 and Haddam Neck, a

3 bli en esos,1 +00s11 fD ADOCK 030002{8

\\

7 pu

q 2

PARTICIPANTS *:

-NRC UTILITY D arga-F. Sears B. Boger P. Blasioli, Et A1.

J C. Thomas J. Wermiel

'J. Stolz A. Wang-r M. Boyle R. Eckenrode J. Bongarra C. Goodman.

NT Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - 1/II cc: See next page.

'f Heetings between NRC technical staff and applicants or licensees are open j

~*?

for interested members of the public, petitioners, intervenors, or other e

parties to attend as observers pursuant to "Open Meeting Statement of NRC Policy," 43' Federal; Register 28058,6/28/78.

L.

4 1

4

)

.j, v

'I o

o.

Mr. Edward J. Mroczka Haddam Neck Plant & Millstone Connecticut Yankee Atomic Power Company Nuclear Power Station Unit No. I cc:

j Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Count,elors at Law Northeast Utilities Service Company i

City Place

. 06103-3499 Hartford, Connecticut 06141-0270 Post Office Box 270 i

Hartford, Connecticut W. D. Romberg, V. ice President D. O. Nordquist Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 i'

Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 05106 J. T. Shedlosky, Resident Inspector Haddam Neck Plant E. A. DeBarba Nuclear Station Director c/o V. S. Nuclear Regulatory Commission HaddamNeckPlant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RFD 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton,. Connecticut 06424 G. H. Bouchard, Nuclear Unit Director W. J. Raymond, Resident Inspector Haddam Neck Plant Millstone Nuclear Power Station Connecticut Yankee Atomic Power Company c/o U. S. Nuclear Regulatory Commission RFD 1, Post Office Box 127E Post Office Box 811 East Hampton, Connecticut 06424 Niantic, Connecticut 06357 First Selectmen Town of Waterford Hall of Records

-200 Boston Post Road Waterford, Connecticut 06385 S. E. Scace, Nuclear Station Director Millstone Nuclear Power Station Northeast Nuclear Energy Company Post Office Box 128 Waterford, Connecticut 06385 J. P. Stetz, Nuclear Unit Director Millstone Unit No. I hoh0ffkchN!"[2gne gy ompany Waterford, Connecticut 06385 l

]

4 1

l C -

June 11, 1990 PARTICIPANTS *:-

NRC UTILITY C Varga F. Sears B. Boger P. Blasioli, Et, A1.

J C. Thomas

'j J. Wermiel J. Stolz.

A. Wang i

M. Boyle j

R. Eckenrode i

J. Bongarra C. Goodman

!J/

Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II-cc: See next page-Meetings between NRC technical staff and applicants or licensees are open-j for interested members of;the.public, petitioners, intervenors, or other parties to attend as observers-pursuant to "Open Meeting Statement of NRC i

Policy," 43 Federal Register 28058,6/28/78.

i DISTRIBUTION d' pceget-711e uh l

NRC &' Local PDRs R

PDI-4 Rdg.

0GC

'E. Jordan (MNBB3302)

B. Grimes (9A2)

' Receptionist (0WFN)

+

C. Thomas (10H5)-

J.Wermeil(10024)

J. Stolz-A. Wang-M.;Boyle R.Eckenrode(10D24)

J.Bongarra(10D24)

C. Goodman (10D24)

ACRS(10)

GPA/PA V.. Wilson

'L. Thomas (12E4)

.J.Caldwell(17G21)

K. Abraham, RI S.tNorris L: DI M PM:PDI-4 PD:PD (o /(( 0

/0 DOCUMENT NAME: 6/13/90

.__i_.-__........

__