Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20038D054 + (ML20038D054)
- ML20038D055 + (ML20038D055)
- ML20038D057 + (ML20038D057)
- PNO-I-81-131, on 811209,steam Leak from iso-condenser Isolation Valve Resulted in Removal of iso-condenser from Svc.Probably Caused by Limit Switch Bypassing to Backseat Valve.Plant Shut Down to Repair Valves Using Same Procedure + (ML20038D059)
- ML20038D060 + (ML20038D060)
- IR 05000302/1981024 + (ML20038D061)
- 05000320/LER-1981-030, Forwards LER 81-030/01L-0 + (ML20038D062)
- ML20038D066 + (ML20038D066)
- 05000320/LER-1981-030-01, /01L-0:on 811030,eight Containment Penetration Isolation Valves Found Open W/O Control Per Tech Specs. Caused by Lack of Proper Administrative Procedures. Procedures Developed + (ML20038D067)
- ML20038D068 + (ML20038D068)
- ML20038D072 + (ML20038D072)
- IR 05000193/1981001 + (ML20038D075)
- 05000317/LER-1981-074, Forwards Updated LER 81-074/01X-1 + (ML20038D076)
- 05000309/LER-1981-024, Forwards LER 81-024/03L-0 + (ML20038D081)
- ML20038D083 + (ML20038D083)
- ML20038D084 + (ML20038D084)
- 05000317/LER-1981-074-01, Determined That Component Cooling Isolation Valve to Containment CC-3832-CV Would Fail in Unconservative Position on Loss of Instrument Air. Administrative Controls Revised + (ML20038D085)
- ML20038D086 + (ML20038D086)
- 05000309/LER-1981-024-03, /03L-0:on 811130,primary Vent Stack Halogen & Particulate Filter Sample Found Not Removed & Analyzed within Prescribed Time.Samples Taken & Analyzed.Personnel Retrained Re Surveillance Schedule + (ML20038D087)
- 05000318/LER-1981-045, Forwards Updated LER 81-045/01X-1 + (ML20038D088)
- TXX-3446, Forwards Schedule & Summary of Critical Events Re Facility Emergency Planning Activities,Per D Rohrer Request + (ML20038D090)
- ML20038D093 + (ML20038D093)
- 05000318/LER-1981-045-01, Discovered That Component Cooling Isolation Valve to Containment Would Fail in Unconservative Position on Loss of Instrument Air or Loss of Ac Power.Administrative Controls Revised + (ML20038D095)
- PNO-III-81-107, on 811206,leak Discovered in Pressurizer Manway,Delaying Recovery from Current Refueling Outage. Repairs Completed & Initial Criticality Estimated for 811208 + (ML20038D096)
- IR 05000321/1981029 + (ML20038D097)
- ML20038D100 + (ML20038D100)
- ML20038D101 + (ML20038D101)
- PNO-III-81-108, on 811208,licensee Notified That Exxon Had Made Nonconservative Assumption in Analysis of Fq for Upper Core Area Re Small Break LOCA Transient + (ML20038D102)
- ML20038D103 + (ML20038D103)
- 05000237/LER-1981-070-01, /01T-0:on 811120,core Spray Valve Operator MO2-1402-4A Found Cracked at Weld Attaching Mounting Flange to Valve Yoke.Area of Cracked Weld Ground Off & New Fillet Weld Applied.Will Continue DOS 1400-2 Monthly + (ML20038D105)
- ML20038D106 + (ML20038D106)
- ML20038D107 + (ML20038D107)
- IR 05000334/1981026 + (ML20038D109)
- ML20038D110 + (ML20038D110)
- PNO-II-81-110, on 811130,site Evacuated After Bomb Threat Phoned In.Search Initiated & No Bomb Discovered + (ML20038D112)
- ML20038D113 + (ML20038D113)
- IR 05000458/1981012 + (ML20038D114)
- ML20038D115 + (ML20038D115)
- ML20038D117 + (ML20038D117)
- ML20038D118 + (ML20038D118)
- PNO-II-81-111, on 811130,bomb Threat Phoned In.Search Conducted W/Negative Results + (ML20038D120)
- ML20038D121 + (ML20038D121)
- ML20038D122 + (ML20038D122)
- IR 05000416/1981052 + (ML20038D124)
- IR 05000373/1981039 + (ML20038D125)
- ML20038D126 + (ML20038D126)
- ML20038D127 + (ML20038D127)
- 05000315/LER-1981-051, Forwards LER 81-051/03L-0 + (ML20038D129)
- ML20038D131 + (ML20038D131)
- ML20038D133 + (ML20038D133)