ML20038D057
| ML20038D057 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/23/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20038D058 | List: |
| References | |
| NUDOCS 8112160028 | |
| Download: ML20038D057 (2) | |
See also: IR 05000302/1981024
Text
=
.
,
=
l
l
l
NOV23198I
/W Q
Florida Power Corporation
d
dh
,
ATTN:
Mr. J. A. Hancock
N
Cs N '/A
9'
Assistant Vice President
li!
c- #C ;}[/A
P. O. Box 14042, Mail Stop C-4
-
D[w %
'$, ,
Nuclear Operations
C
't
f
'
4%h'
St. Petersburg, FL 33733
b
%
4.
,,
Gentlemen:
'b /
f
Subject: Report No. 50-302/81-24
This refers to the routine safety inspection conducted by Mr. W. P. Ang of this
office on October 27-30, 1981, of activities authorized by NRC Operating License
No. DPR-72 for the Crystal River facility and to the discussion of our findings
held with Mr. D. C. Poole, Plant Mar,ager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
of fice by telephone within ten days f -o.T
the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanieo by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
l
Florida Power Corporation
2
NOV 2 31981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
Paul J. Kellogg, Chief
Reactor Projr: cts Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-302/81-24
cc w/ encl:
D. C. Poole, Nuclear Plant Manager
bec w/ encl .
NRC Resident Inspector
Dccument Management Branch
State of Florida
RII
RII
RII
RII
RII
,s1p -
Sc.L l&
{f ^{
f"
WPAng:ht
ARHerdt
CEMurphy
VBrownlee
PJKe ogg
11/11 /81
11//'7/81
11//t /81
11/f/81
11/
81
7