Forwards IE Insp Rept 50-302/81-24 on 811027-30.No Noncompliance Noted
ML20038D057
Person / Time
Site: Crystal River 
Issue date: 11/23/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML20038D058 List:
References
NUDOCS 8112160028
Download: ML20038D057 (2)


See also: IR 05000302/1981024

Text

=

.

,

=

l

l

l

NOV23198I

/W Q

Florida Power Corporation

d

dh

,

ATTN:

Mr. J. A. Hancock

N

Cs N '/A

9'

Assistant Vice President

li!

c- #C ;}[/A

P. O. Box 14042, Mail Stop C-4

-

D[w %

'$, ,

Nuclear Operations

C

't

f

'

4%h'

St. Petersburg, FL 33733

b

%

4.

,,

Gentlemen:

'b /

f

Subject: Report No. 50-302/81-24

This refers to the routine safety inspection conducted by Mr. W. P. Ang of this

office on October 27-30, 1981, of activities authorized by NRC Operating License

No. DPR-72 for the Crystal River facility and to the discussion of our findings

held with Mr. D. C. Poole, Plant Mar,ager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

of fice by telephone within ten days f -o.T

the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanieo by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

l

Florida Power Corporation

2

NOV 2 31981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/s/

Paul J. Kellogg, Chief

Reactor Projr: cts Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-302/81-24

cc w/ encl:

D. C. Poole, Nuclear Plant Manager

bec w/ encl .

NRC Resident Inspector

Dccument Management Branch

State of Florida

RII

RII

RII

RII

RII

,s1p -

Sc.L l&

{f ^{

f"

WPAng:ht

ARHerdt

CEMurphy

VBrownlee

PJKe ogg

11/11 /81

11//'7/81

11//t /81

11/f/81

11/

81

7