Text
_ _ _ _ _ _ _ _ _ _ _ - _ _ _
o U S N R C R C rW * > -
Georgia Power Company 3 ' '. *., ?) 74, Q Post Offee Box 4545 Atlanta, Georgia % 302 b
- " "* * ' 522" 3I DEC 3 A8 50 Vogtle Project Southem Company Servces, Inc.
Post Offee Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 November 24, 1981 United States Nuclear Regulatory Commission
Reference:
l Office of Inspection and Enforcement ID:
II:
Region II - Suite 3100 50-424/81-10 101 Marietta Street 50-425/81-10 Atlanta, Georgia 30303 Attention: Mr. James P. O'Reilly File: X7BG10 Log:
GN-151 Gentlemen:
The Georgia Power Company wishes to subnit the following information concerning the violation discussed in your inspection reports 50-424/81-10 and 50-425/81-10.
We concur with finding identified concerning failure to control welding.
The reason for the violation was failure to properly follow procedures.
The weld identified where red pencil was used to mark fitup locations was cleaned along with the adjacent area on the pipe rack. The area was visually reinspected and there was no evidence of unacceptable conditions resulting from the red mark being in or near the weld area. The weld is considered acceptable. The Contractor has instructed all craft personnel responsible for welding that weld preps must be clean of all foreign material and that these instructions apply to rack steel and hangers as well as piping.
In addition, Q.C. inspectors have been instructed to monitor in process rack and hanger welding to assure compliance.
Damaged electrodes and electrode stubs discarded in unauthorized trash container have been removed and properly discarded. A letter has been sent to all Contractors requesting that they assure that all welders and crew foremen comply with the appropriate procedure when disposing of damaged electrodes and electrode stubs.
In addition, the letter requests that all Q.C. inspectors (Georgia Power Company and Contractors) monitor compliance to the procedure.
Full compliance was achieved November 19, 1981, 8112160097 811200 PDR ADOCK 05000424 o
Mr. James. P. 0'Railly 50-424/81-10-50-425/81-10 November 24, 1981 page 2.
Neither the inspection report nor this reply contains any proprietary infonnation and may be placed in the NRC's Public Document Room.
Very truly yo s,
/
.h>
D. O. Foster-Project General Manager D. O. Foster states that he is. Project General Manager of Georgia Power Company's Vogtle Project and is authorized to execute this oath on behalf of Georgia Power Company and that to the. best of his knowledge and belief the facts set forth in this letter are true.
GPC:
D. 0. Foster Sworn to and subscribed before me thisdS/ day of November,1981.
J fictsry Pu%c, Gr.orda, st:ta et Lerge (
h'y Comension Ex;;ircs Jdy 23.1934 xc:
U. S. Nuclear Regulatory Comission Attn: Victor J.'Stello, Jr., Director Office of Inspection and Enforcement Washington, D. C.
20555 J. H. Miller
- 0. Batum R. J. Kelly D. O. Foster R. E..Conway H. H. Gregory III G. F. Head E. D. Groover D. E.- Dutton-L. T. Gucwa R. H. Pinson B. L. Lex
(
C. F. Whitmer C. R. Miles, Jr.
D. L. McCrary H. C. Nix R. A. Thomas R. W. Staffa J. A. Bailey J. L. Vota I