Forwards IE Insp Repts 50-321/81-29 & 50-366/81-29 on 810929-1020.No Noncompliance Noted
ML20038D093
Person / Time
Site: Hatch  
Issue date: 11/19/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20038D094 List:
References
NUDOCS 8112160055
Download: ML20038D093 (2)


See also: IR 05000321/1981029

Text

VpNu

.

.

'

NOV 191981

\\ N1 O

f

/ V - [ M\\

/N[y

Georgia Power Company

il y/[p ,C'h 0

//

ATTN: Mr. J. H. Miller, Jr.

"

Executive Vice President

0E0J 41981%

~

270 Peachtree Street

i

Atlanta, GA 30303

v3

~

,

6Ddgroc,

11

Gentlemen:

-

y

Subject: Report Nos h /81-29 )pd 50-366/81-29

y

This refers to the routine safety inspection condu.ted by Mr. R. F. Rogers of.

this office on September 29 - October 20, 1981, of activities authorized by NRC

Operating License Nos. DPR-57 and NPF-5 for the Hatch facility and to the

discussion of our findings held with Mr. H. Manry, Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews' with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this -

letter and the enclosed report will be placed in the NRC',s Public Document Room.

If the report contains any .infomation that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such infomation.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be. accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the infomation should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The infomation

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

9112160055 811119*

PDR ADOCK 05000321

G

PDR-

I[O[$

.

.

M

hoV 191R

-

Georgia Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

Paul J. Kellogg, Chief

Reactor Projects Branch 2, Division of

Resident and Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-321/81-29

and 366/81-29

cc w/ encl:

J. T. Beckham, Vice President and

General fianager-Nuclear Generation

11. itanty, Plant ihnager

C. E. Bel flower, Site QA Supervisor

bcc w/ encl:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document !!anagement Branch

State of Georgia

RII g

RII

RI

RII

k

sl '

1

<

/

VBroanlee

JRogge

PJK

gg

RRogers:gr

11/j'/81

11/4/81

11/p /81

11/ /81