" I'!'lTP,UITED m >1TH (jo ueug LORTAINS 2.7S04 SAFEGUARDS INFORMAI!DN UNITED STATES o,'n NUCLEAR REGULATORY COMMISSION P
g a
REGION 11 o
101 MARIETTA ST., N.W, SUITE 3100 ATLANTA, GEORGIA 30303 o
DEC 9 1981 i
Report No. 70-1151/81-15 Docket No. 70-1151 License No. SNM-1107 Safeguards Group No. III Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Columbia, SC 29205 Facility Name:
Nuclear Fuel Division Inspection at: Westinghouse Electric Corporation site near Columbia, SC Inspection Conducted: Oc ooer 27-30, 1981 Type of Inspection: Unannounced Material Control and Accountability
- p. BhEes, "Se'n'ior 5'afeguards Chemi st
'/2, [9 /f /_
Inspectors:
//
ct D/te Sfigned'
.o>r.. M ia IQem
-J.
. Sabados, Safeguards Chemist D4t igried Approved by:
8(FTn
- RLarw_,
I 2__/ 9 / 9 (
E. J. McAlbine, Chief) Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected: Measurements, measurement control program, follow-up on previ-ously identified inspection findings and independent inspection effort.
The inspection involved 59 inspector hours on site by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the four areas examined during the inspection.
l S-F2 9l
/9 Ccpy.S of 9 Copico Y
Pagen
'D:is Lacer;:ent is not to be terreduced without specific j
orvo en1 of IE :II l
f/ATERIAL TR/MSMITTED HEREY!!TH bRdooOgoyggyp U