Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035E997 + (ML20035E997)
- IR 05000282/1993006 + (ML20035E998)
- ML20035F002 + (ML20035F002)
- ML20035F004 + (ML20035F004)
- ML20035F006 + (ML20035F006)
- ML20035F007 + (ML20035F007)
- ML20035F008 + (ML20035F008)
- ML20035F009 + (ML20035F009)
- ML20035F013 + (ML20035F013)
- ML20035F015 + (ML20035F015)
- ML20035F022 + (ML20035F022)
- ML20035F023 + (ML20035F023)
- ML20035F027 + (ML20035F027)
- ML20035F028 + (ML20035F028)
- ML20035F029 + (ML20035F029)
- 05000302/LER-1992-006-01, Forwards LER 92-006-01,reflecting Change in Corrective Action Implementation Schedule.Only 12 Supports Spread Among Six Different Sys Affected & Factors of Safety Above 2.0 + (ML20035F030)
- ML20035F037 + (ML20035F037)
- ML20035F038 + (ML20035F038)
- ML20035F049 + (ML20035F049)
- 05000263/LER-1993-005-01, :on 930315,480-volt LPCI Swing Bus Transferred to Alternate Power Supply During Simulated Actuation Test of Eccs.Caused by Inadequate Info Re DG Voltage Regulator.Bus Transferred to Normal Power Source + (ML20035F057)
- ML20035F058 + (ML20035F058)
- ML20035F059 + (ML20035F059)
- 05000309/LER-1993-006, :on 930222,defective Cutoff Switch Actuator (Paddle) Detected on Reactor Trip Circuit Breaker 10.Faulty Switch on Breaker Replaced & Trip Breaker Tested Successfully + (ML20035F061)
- ML20035F064 + (ML20035F064)
- ML20035F065 + (ML20035F065)
- 05000425/LER-1993-002-02, :on 930319,discovered That Interlock for Containment Bldg Personnel Airlock Door Defeated.Caused by Personnel Error.Individual Disciplined Re Importance of self-checking + (ML20035F066)
- ML20035F069 + (ML20035F069)
- ML20035F072 + (ML20035F072)
- ML20035F073 + (ML20035F073)
- ML20035F076 + (ML20035F076)
- ML20035F078 + (ML20035F078)
- 05000324/LER-1993-005-01, :on 930316,chloride Level in Reactor Coolant Sample Found Above TS Limits & Levels Could Not Be Restored within 48 H.Caused by cross-tie Valve Leaking & Loss of Offsite Power.Clogged Drain Line Cleared + (ML20035F079)
- 05000263/LER-1990-001-05, Forwards LER 90-001-05 Re Potential Emergency Filter Train Sys Inoperability Due to Interaction w/nonsafety-related Equipment.New NRC Commitments Listed + (ML20035F080)
- 05000263/LER-1990-001, :on 900313,design Deficiencies Noted in Emergency Filter Train Sys.Ventilation Units & Ductwork Isolated.On 930315,determined That Train B of CR Emergency Filtration Sys Could Not Supply Adequate Flow + (ML20035F082)
- 05000263/LER-1989-040, :on 891219,secondary Containment Failed to Meet Operability Requirements for Secondary Containment Capability.Caused by Design Deficiencies.On 930317,addl Design Deficiency Noted Re Damper Controls + (ML20035F085)
- ML20035F086 + (ML20035F086)
- ML20035F091 + (ML20035F091)
- ML20035F094 + (ML20035F094)
- ML20035F096 + (ML20035F096)
- ML20035F097 + (ML20035F097)
- ML20035F098 + (ML20035F098)
- ML20035F099 + (ML20035F099)
- ML20035F100 + (ML20035F100)
- ML20035F101 + (ML20035F101)
- ML20035F102 + (ML20035F102)
- ML20035F103 + (ML20035F103)
- ML20035F104 + (ML20035F104)
- 05000482/LER-1993-004-01, :on 930316,broken Fuel rod,11-12 Inches in Length,Protruded Out of Fuel Assembly F67 at Core Position FH-6.Caused by Grid to Rod Fretting Failures.Util Evaluating Fluid Elastic Instability + (ML20035F105)
- ML20035F106 + (ML20035F106)
- ML20035F107 + (ML20035F107)
- ML20035F113 + (ML20035F113)