_ _
o..
g 19010muteau Averve Post D!!ce Box 149 SL 1aws. Miss:>ud 63 ?56 314 554 ?S50 i
UNION-Donald F.Schnell Etscriac sew wx exwur rac.
April 16, 1993 U.S. Nuclear Regulatory Commission Attn:
Document Control' Desk Mail. Station P1-137 Washington, D.C.
20555-ULNRC-2793 Gentlemen:
CALLAWAY PLANT DOCKET NUMBER 50-483 i
REVISION TO TECHNICAL SPECIFICATION 3/4.9.7 CRANE TRAVEL-SPENT FUEL STORAGE FACILITY l
Reference:
ULNRC-2722 dated November 10, 1992 i
The referenced letter transmitted an j
amendment application to Technical Specification 3.9.7 i
and associated Bases.to allow the fuel pool transfer gates to travel over fuel assemblies in the. spent fuel i
pool for refueling activities, fuel handling. system maintenance, and transfer gate seal replacement.
The l
attachment to this letter contains additional information in support of this license amendment application.
As is shown in the attachment,-the spent fuel pool gate rigging and hoist have a minimum safety factor which exceeds the Crane Manufacturers Association of America (CMAA) recommended safety factor of 5.
The high safety factor in conjunction with the redundant-slings used during a lift ensure that the gates will l
not be dropped on the spent fuel pool racks.
This information was discussed'with the NRC staff on April 6,
1993.
If you have any questions concerning this information, please contact us.
I very truly.yours, c
200040 g none1e y, sc3ne11 WEK/plh 1
I Attachment-9304200170 930416 i
.PDR ADOCK 05000483 P
PDR.
s l
i STATE OF MISSOURI
)
)
)
Alan C.
Passwater, of lawful age, being first duly sworn upon oath says that he is Manager, Licensing and Fuels (Nuclear) for-Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
j
/
/
Alan C.
Passwater Manager, Licensing and Fuels Nuclear SUBSgRIBED and sworn to before me this
/
-day of (144 //
1993.
n A AAA hW
// ~
t/ f/ /)
DAREMRA J. PFAFF TJCI ARY PUBLIC, STATE OF MISSOURI Mr COMftlSSION EXPIRES APRIL 22,1993 ST. LOUIS COUNTY
i RIGGING t.AYOUT-SPENT FUEL POOL GATE. HKE 16A Or 168 i
j West Ton Safety v 5-Ton Sa'ety East z
bTrolley beam on i
3 5
Spent Fuel Pool d
3 a
)
Bridge Crane, y
,g 4
HKE04 B
g 4
0 4
[4 n
0 P
, (s s i
t OO s
O 7
i GATE GATE Side hiew of Gate After 1 Ft. Uft Gate in installed Position Rigging i
P t
RIGGING PARTS LIST RIGGING SEQUENCE 1.
Existing 5-Ton Yale Hoist With the gate in the insta;1ed position, connect the hoist 2.
2-each 5-Ton Safety Trolleys lifting slings and safety cables (6), one cable to each 3.
5-Ton Shackle @ Ea. Safety Trolley safety trolley. Lift the gate to clear supports (approx.11").
4.
5-Ton Shackle Connect safety cables (8). Gate may now be moved to its 5.
Existing Lifting Slings storage position. Remove safety cables (8) and lower gate 6.
2-each 7/8", slings. 5-Ton capacity to rest on storage supports. Remove remainder of rigging.
7.
10-Ton Shackle Repeat above sequence to place the gate in its installed
{
8.
2-each 7/8", slings, 5-ton capacity position.
I l
,s n
cc:
T. A.
Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N.
- Street, N.W.
Washington, D.C.
20037 Dr. J.
O.
Cermak CFA, Inc.
18225-A Flower Hill Way Gaithersburg, MD 20879-5334 L. Robert Greger Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission Region III
(
799 Roosevelt Road Glen Ellyn, Illinois 60137
)
Bruce Bartlett Callaway Resident Office U.S.
Nuclear Regulatory Commission RR#1 Steedman, Missouri 65077 L. R. Wharton (2) l Office of Nuclear Reactor Regulation e
U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 Ron Kucera Department of Natural Resources P.O.
Box 176 Jefferson City, MO 65102
.