Rev 4 to Inservice Test Program (ISI-P-106) for Vogtle Electric Generating Plant,Unit 2
ML20035F073
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/22/1993
From:
SOUTHERN NUCLEAR OPERATING CO.
To:
Shared Package
ML20035F070 List:
References
PROC-930322-01, NUDOCS 9304200224
Download: ML20035F073 (15)


Text

.-.

i GEORGIA POWER COMPANY j

INSERVICE TEST PROGRAM (ISI-P-016) i FOR VOGTLE ELECTRIC GENERATING PLANT UNIT 2 PREPARED BY SOUTHERN NUCLEAR OPERATING COMPANY

]

l INSPECTION AND TESTING SERVICES GROUP.

SNC G3C REV.

DATE DESCRIPTION PREP'D REY'O APPV.

APPR-W W

W Pnmact m SEN.

Uts)

Ole Ort sess suPP.

sant.

XXXXXX

~

XXXXXX

=.,. _. XXXXXX

~'

==

XXX XXX

~

=m w m us eu pt a D

4

1 l

V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 Ih;ERVICE TEST (IST) PROGRAM 4

ISI-P-016 Revisien 4 Summary of Chances j

List of Effective Revised to indicate the current revision number of each i

Pages page in the program document.

See below for pages 2

affected.

Page 12-43 Revised to add valve 1-1208-U6-124.

Page 12-46 Revised to change valve type for HV 8220.

Page 3.2-60 Safety position was changed to 0/C and disassembly was added to confirm reverse flow closure and reference to Relief Request RR-23 was added for valve 1301-U4-006.

i Safety position was changed from 0/C to O for valve

-l 1301-04-404.

Page 13-14 Relief Request RR-14 was revised to change frequency for disassembly and manual exercising from every outage to every other outage for valves 1206-U6-0?5 and 016.

Page 13-23 Relief Request RR-23 was revised to include valve 1301-U4-006.

Page 13-28 Added Relief Request RR-28 for testing valve 1-1208-U6-124.

Page 14-31 Cold Shutdown Justification CS-31 was revised to delete valve 1301-U4-006.

Testing for this valve has been added to Relief Request RR-23.

I

O VEGP-2 ISI-P-016, Rev. 4 List of Effective Paoes i

Distribution List, Rev..i f

Table of Contents, Orir. Issue

==

Introduction:==

Page 1-1, Re*,. O Page 1-?.

key. 2 Page 1-3, Rev. 3 i

Pumps:

Page 2-1, Rev. O Page 2-2, Rev. O Page 2-3, Rev. 0 Page 2-4, Rev. O Page 2-5, Rev. 0 Page 2-6, Rev. 0 l

Page 2-7, Rev. 0 Page 2-8, Rev. O i

Page 2-9, Rev. O Page 2-10, Rev. O Pump Relief Requests:

Page 3-1, Rev. 0 l

Page 3-2, Rev. O Page 3-3, Rev. O Page 3-4, Rev. 2 Page 3-5, Rev. 3 NSCW:

Page 4-1, Rev. O Table 4-1, Rev. 2

[

Table 4-2, Rev. 2 Table 4-3, Rev. O i

Table 4-4, Rev. 0 Table 4-5, Rev. O Table 4-6, Rev. O Table 4-7, Rev. O Table 4-8, Rev. 0 Table 4-9, Rev. 2 Table 4-10, Rev. 2 Drawings - ISI-D-250, Rev. I Drawings - ISI-D-251, Rev. 1 i

- ISI-D-252, Rev. 1

- ISI-D-253, Rev. 1

- ISI-D-254, Rev. I

- ISI-D-255, Rev. 1 i

- ISI-D-256, Rev. 2

- ISI-D-257, Rev. 2 Figures 1, Rev. O

! 2, Rev. O

3, Rev. 0-i 4, Rev. O
5, Rev. 0 l 6, Rev. 0 7, Rev. O 8, Rev. O I of 6 002827 016 Rev. 4 i

2 e

u l

CCW:

Page 5-1, Rev. 0 l

Table 5-1, Rev. 2 i

Table 5-2, Rev. 2 l

Table 5-3, Rev. 2 l

Table 53 Rev. 2 Table 5-5, Rev. 2 Table 5-6, Rev. 2 i

Table 5-7, Rev. 2 i

Drawings - ISI-D-258, Rev. 1 i

- ISI-D-259, Rev. 1 l

- ISI-D-260, Rev. 1

- ISI-D-261, Rev. 1

- ISI-D-262, Rev. 1

- ISI-D-263, Rev. I Figures 1, Rev. 0 l 2, Rev. 0 l

-53, Rev. 0 l 4, Rev. 0 l 5, Rev. 0 l 6, Rev. 0 l

SI:

i l

Page 6-1, Rev. 0 l

Page 6-2, Rev. 0 Table 6-1, Rev. 2 Table 6-2, Rev. O i

Table 6-3, Rev. 0 l

Drawings - 151-D-264, Rev. I

- ISI-D-265, Rev. I j

Figures 1, Rev. 0

' 2, Rev. 0 RHR:

Page 7-1, Rev. O Page 7-2, Rev. 0 Table 7-1, Rev. 2 i

Table 7-2, Rev. 2 i

Table 7-3, Rev. 3 l

Drawings - ISI-D-266, Rev. 2

- ISI-D-267, Rev. 2 i

Figures 1, Rev. O

2, Rev. O CS

Page 81 Rev. 0 l

3 Table 8-1, Rev. 2 l

Table 8-2, Rev. 0 i

Table 8-3, Rev. O

,j Drawings - ISI-D-268,.Rev. 2 d

- ISI-D-269 Rev. 2 Figures 1, Rev. O

! 2, Rev. O l

CVCS:

Page 9-1, Rev. O Page 9-2, Rev. 0 Table 1, Rev. 2 Table 9-2, Rev. 2 Table 9-3, Rev. 2 2 of 6 002827 016 Rev. 4

_, _. ~

f I*

CVCS: (continued)

Table 9-4, Rev. 2 Table 9-5, Rev. 0 Table 9-6, Rev. O Drawings - ISI-D-270, Pev. 2

- ISI-D-271, Rev. 2 4

- ISI-D-277, Rev. 1

- ISI-D-278, Rev. 1 Figures 1, Rev. 0

- 2, Rev. 0 4

1 3, Rev. O 4, Rev. O AFW:

Page 10-1, Rev. 0 Page 10-2, Rev. O Table 10-1, Rev. 2 Table 10-2, Rev. 2 Table 10-3, Rev. 2 Table 10-4, Rev. 2 l

Table 10-5, Rev. 2 Drawings - ISI-D-272, Rev. 1

- ISI-D-273, Rev. 1

- ISI-D-274, Rev. I Figures 1, Rev. 0 2, Rev. 0 3, Rev. 0 ESF:

Page 11-1, Rev. O Table 11-1, Rev. 2 Table 11-2, Rev. 2 Table 11-3, Rev. 2 l

Drawings - ISI-D-275, Rev. 2

~

- 151-D-276, Rev. 2 Figures 1, Rev. O

2, Rev. 0 Valves

Page 12-1, Rev. 0 Page 12-2, Rev. O Page 12-3, Rev. O Page 12-4, Rev. O Page 12-5, Rev. O Page 12-6, Rev. O Page 12-7, Rev. O Page 12-8, Rev. O Page 12-9, Rev. O Page 12-10, Rev. O Page 12-11, Rev. 0

age 12-12, Rev. O Page 12-13, Rev. O Page 12-14, Rev. O Page 12-15, Rev. 0 Page 12-16, Rev. O Page 12-17 Rev. 0 Page 12-18, Rev. O Page 12-19, P,ev. O Page 12-20, Rev. O Page 12-21, Rev. 0 3 of 6 002827 016 Rev. 4 9

+, -,

w 3---

Valv2s: (cIntinued)

Page 12-22, Rev. O Page 12-23, Rev. 0 l

Page 12-24, Rev. O Page 12-25, Rev. O Page 12-26, Rev. O Page 12-27, Rev. 0 Page 12-28, Rev. O Page 12-29, Rev. O Page 12-30, Rev. O Page 12-31.

Rev. 1 Page 12-32, Rev. O Page 12-33, Rev. O Page 12-34, Rev. O Page 12-35, Rev. O Page 12-36, Rev. O Page 12-37, Rev. 3 Page 12-38, Rev. O Page 12-39, Rev. O Page 12-40, Rev. O Page 12-41, Rev. O Page 12-42, Rev. O Page 12-43, Rev. 4 l

Page 12-44, Rev. 0 Page 12-45, Rev. O Page 12-46, Rev. 4 Page 12-47, Rev. O Page 12-48, Rev. O Page 12-49, Rev. O Page 12-50, Rev. O Page 12-51, Rev. O Page 12-52, Rev. O Page 12-53, Rev. O Page 12-54, Rev. O Page 12-55, Rev. 0 Prge 12-56, Rev. O 4

Page 12-57, Rev. O Page 12-58, Rev. O Page 12-59, Rev. 3 Page 12-60, Rev. 4 I

r ge 12-61, Rev. 0

/ age 12-62, Rev. O Page 12-63, Rev. 0 Page 12-64, Rev. O Page 12-65, Rev. O Page 12-66, Rev. O Page 12-67, Rev. O Page 12-68, Rev. O Page 12-69, Rev. 3 Page 12-70, Rev. 3 Page 12-70a, Rev. 3 Page 12-71, Rev. O Page 12-72, Rev. O Page 12-73, Rev. O Page 12-74, Rev. O Page 12-75, Rev. O Page 12-76, Rev. 0 4 of 6 002827 016 Rev. 4

i Aet^as: )asuqiunaP(

de6a tg-tI' ya^* 0 de6a tg-tg* ysA 0 de6a IZ-16' yaA* 0 de6a tg-go' ya^* 0 de6a IZ-SI' BaA* 0 I

de6a 12-3g' yaA 0 l

de6a IZ-SE' y*A* 0 de6a tg-St' yaA* 0 de6e IZ-SS' BaA* 0 de6a tz-89' ysA' E de6e IZ-SI' BaA* 0 de6a 13-88' ysA* 0 de6a IZ-86' BaA* 0 j

de6a 12-60' BaA' o I

de6e IZ-6I' BaA* o de6e 12-62' BaA* 0 dt6a IZ-6E' BaA* 0 dt6e IZ-69' yaA-I i

Aet^a yattaJ yabnasts:

i de6a ts-t' yaA 0 de6a tg-g*

ya^* 0 r

de6a tg-g*

ya^* 0 de6a tg-t' yaA* 0 de6a tg-g*

ya^* Z de6a IE-9' ya^* Z de6a ts-t yaA* 0 de6e I E - 8

BaA* 0 de6a IE-6' ya^* 0 l

de6a lE-I0' BaA* 0 dt6a IE-II' ya^* 0 de6a tg-tg* yaA 0 de6a tg-tg*

ya^* 0 de6a tE-!t' BaA' t j

de6a lE-IS' BaA* 0 de6a IE-19 ya^* 0 de6a l E -Il

ya^* 0 de6a IE-I9' BaA* 0 de6e IE-I6' 88^* 0 de63 tg-go' yaA* 0 de6a IE-ZI' BaA* 0 de6e IE-22' yaA* 0 de6a tg-zt' ya^* t I

de6e Ig-zt' yaA* 0 de6a lE-gg* yaA* 0 de6a tg-39' yaA* I de6a. tg-gL yaA* I de6a tE-gg' yaA* t y

Aet^a 3otp sgnip'omu ens 15Jtarttous:

de6a

{)-t' yaA* 0 de6a tp-g*

yaA~ ~ 0

-de6a tt-t' ya^* 0 de6a tt-t' yaA 0 de6a tt-g*

yaA* 0 de6a I)-9' yaA* 0 de6a tt-t' yaA-2 de6a tt-8' ya^* 0 S oJ 9 002822 0I9 BaA* t

Valve Cold Shutdown Justification: (c:ntinued)

~*

Page 14-9, Rev. O Page 14-10, Rev. O Page 14-11, Rev. O Page 14-12, Rev. O Page 14-13, Rev. 0 Page 14-14, Rev. O Page 14-15, Rev. O Page 14-16, Rev. O i

Page 14-17, Rev. 3 Page 14-18, Rev. O Page 14-19, Rev. 0 Page 14-20, Rev. O Page 14-21, Rev. O Page 14-22, Rev. 0 i

Page 14-23, Ray. 0 Page 14-24, Rev. O Page 14-25, Rev. O Page 14-26, Rev. 0 Page 14-27, Rev. O i

Page 14-28, Rev. O Page 14-29, Rev. O Page 14-30, Rev. 0 Page 14-31, Rev. 4 1

Page 14-32, Rev. 0 Page 14-33, Rev. O Page 14-34, Rev. 2 Page 14-35, Rev. O Page 14-36, Rev. O Page 14-37, Rev. O Page 14-38 Rev. O Page 14-39, Rev. 1 Page 14-40, Rev. 3 002827 6 of 6 016 Rev. 4

F.

VEGP unit No. 2 016 REY 4 Velve Test List Systems Chemicet and Voltane Control System No.1208 Sheet 6 of 7 Relief yelyg Act.

Req. or e

Velve Elegg PRIO Site Act.

Poeltlon or 13313gndfrglt.

C.S.

Description N&r 111 Ettia (Coord.)

Ett Lind Irgt Irgt 9.otE Lell Safety Egit 21 El E LEY d 1u.gl.

and92121 U4 284 3 313 2x405118 C

2.00 CK S

C N/A 0 A

e goric Acid (0-5)

Transfr.r Pimp Olocherge U4 299 3 313 2x408118 C

2.00 CK 3

C N/A 0 A

Q Boric Acid (e-5)

Trenefer Ptap Discharge U4 499 2 212 2x400116-1 C 1.00 CK S

C N/A O A

CS CS-29 Boric Acid to (0-3)

RR 2 Chereing Pis9e U6 032 2 212 2x40e114 AC 3.00 CK S

0 N/A 0/C A

R R RR 2,16 CVCS to Reg-( F-3) e enerative Nx - Pene-tretton No. 50 (Note 1)

U6 124 2 212 2x40e116-1 C 4.00 CK S

0 N/A C A

R RR-2,28 VCT Outlet Check g

(E-4) s U6 142 2 212 2x40e116-2 C 4.00 CK C

N/A O/C A

POR RR 2,12 CVCS Ptap Out (G-6)

Check U6 149 2 212 2x40s116-2 C 4.00 CK S

C N/A O/C A

POR RR 2,12 CVCS Ptap out (C-6)

Check 001173 12-43

8 e

e 4

VEGP Unit No. 2 016 NEY 4 Velve Test Llet system:

Nucteer semptine-Li pid - system No. 1212 sheet 2 of 2 pellef Vetve Act.

Req. or Velve Ct m P&ID site Act.

Poeltlen or Teste and Free.

C.s.

Description lhs$et 1R frgj. (Coord.)

Eg1 ((nd I)gg 13gt 193 1311 Sefety Lge_t 21 [1 E []Y L1 lygh d Egitt MV 3514 2 212 2x40e140 A 0.50 GL A0 C

C C

A Y e o

e R

Presourfter (F.7) steen space -

Penetretten No. 67A (Note 1)

MV 3548 2 212 2x40e140 A 0.50 GL NO O

Al C A

Y e e

R Reactor Not (D-8)

Les sample Line -

Penetration No. 24 (Note 1)

NV 8220 2 212 2x405140 A 0.50 CA Es C

C C

A Y e e

e R

Post-Accident g

(o 7) semptIns -

8 Penetrotton No. 24 (Note 1) 001339 12-46

.m l

l s.

VEGP Unit No. 2 016 ItEV 4 l

Vetwo Test List System:

Mein Sttem - System 1301 Sheet 9 of 9 l

Rollef Iglyg Act.

Req. or Velve

$1332 P&Ie site Act.

Position of 11111 SDd IIS9a C.S.

Description lluubec 13.[EE21a (C00fd.)

E91 11D d lYER 12EE E9fE1111 Safety treeg f.[ [I E Z E L1 AMEla Sud H2L'E g

PV 3020 2 212 2x408159-2 e 10.00 GL EM C

C O/C A

Y e e

e Main Steam (D 2)

Power-operated Relief Vetve PV 3030 2 212 ZX405159-2 8 10.00 GL EM C

C O/C A

T e o

e Mein Steam (C 2)

Power-operated Relief Velve U4 006 3 313 2x408159-2 C 4.00 CK S

C N/A O/C A

PeCS RR 23, Aunillery l

(s-4) an 2

Feeduster I

(AFW) Ptap theck U4 008 3 313 2x40e159-2 C 4.00 CK S

C W/A O/C A

PeCS RR 23, AFW Pump (E 4)

RM 2

theck ut 404 3 313 2x40e159 2 C 4.00 CK S

C W/A 0 A

PeCS CS-31, AFW Puup l

(E 4)

RR 2 theek 001173 12-60 i

-...._.,,,..m.,

i l

p-RELIEF REQUEST i

i RR-14 i

SYSTEM:

Containment Spray-System No. 1206 t

VALVE (S):

1206-U6-015, 1206-U6-016 CATEGORY: AC CLASS:

2 r

l FUf;CTION: Valve opens to allow flow for containment spray. Valve l

closes to perform containment isolation function.

QUARTERLY TEST REQUIREMENT:

Verify forward and reverse flow operability per IWV-3522.

BASIS FOR RELIEF:

Forward flow operability can be verified only by i

initiating flow through-the. valves into the containment structure. The initiation of i

containment spray into the containment would result in extensive damage to equipment inside containment.

The only method available to verify reverse flow i

closure is valve leak testing during Appendix J,

type C, testing at refueling.

i l

ALTERNATE TESTING:

One of these valves will be disassembled and l

manually stroked every other refueling on a l

staggered test basis.

If disassembly reveals that the valve is-inoperable, the remaining valves will be disassembled.

In addition, reverse. flow closure will be verified during Appendix J, type C, testing at refue'i:1 These valves can not be partial exercised with flow after reassembly due to open discharge path inside containment. Appendix J 1eak rate testing after reassembly should confirm proper reassembly and disk alignment and will provide an adequate confidence.

level that check valve is functional.

GENERIC LETTER 04 REVIEW:

This relief request complies with the alternative to full flow testing of check valves as described in Position 2 of NRC Generic Letter 89-04. The l

provisions for extending the disassembly frequency have been reviewed and extension to every other outage is justified.

i 001160 13-14 Rev. 4 l

l I

I

=.

._..-.. -......, _, _ _ _ _ _. ~,.. _ _ -. _, -. ~. _.. _

o **

RELIEF REQUEST RR-28 SYSTEM:

Chemical and Volume Control - System 1208 VALVE:

2-1208-U6-124 CATEGORY:

C CLASS:

2 FUNCTION:

Isolate potential leakage path outside containment QUARTERLY TEST REQUIREMENT:

Verify reverse flow closure quarterly per IWV-3522(a).

BASIS FOR RELIEF:

Testing this check valve requires that letdown and Reactor Coolant Pump (RCP) seal water return to the Volume Control Tank (VCT) be isolated, thus, removing the Chemical and Volume Control System (CVCS) from service. The CVCS is required to be in service during normal operation. Therefore, quarterly testing is not possible.

Similarly, performing the test at cold shutdown would require isolating seal water to the RCPs. RCP seal water is typically only isolated during mid-loop operations when the Reactor Coolant System (RCS) level is below the RCP seals thus preventing 1

crud intrusion into the seal packages. There have been numerous undersirable events throughout the industry which have resulted from mid-loop operations, e.g., vortexing/ cavitation of the Residual Heat Removal (RHR) pumps due to improper RCS level indication. Mid-loop operation reduces RCS inventory which thereby reduces the plant's margin of safety. Therefore, the safety risks associated with testing this check valve during cold shutdowns are unwarranted.

ALTERNATE TESTING:

Reverse flow closure will be verified during each refueling outage by measuring a change in VCT level over time. This test will be performed in conjunction with the Emergency Core Cooling Systems (ECCS) check valve flow tests when the RHR system is I

providing flow to the suction of the centrifugal charging pumps. This check valve must close to prevent flow diversion to the VCT.

GENERIC LETTER 89-04 Review:

The proposed alternate testing method complies with Postion 3 of NRC Generic Letter 89-04.

001160 13-28 016 Rev. 4 I

l

RELIEF REQUEST RR-23 SYSTEM:

Main Steam - System No. 1301 VALVE (S):

1301-U4-008, 1301-U4-006 CATEGORY: C CLASS:

3 FUNCTION:

These valves open to allow steam to the AFW pump turbine and close to prevent reverse flow.

l QUARTERLY TEST REQUIREMENT:

Verify forward flow operability and reverse flow closure per IWV-3522.

BASIS FOR RELIEF:

Full-stroke exercising these valves during full power operation would require establishing full AFW pump flow into the steam generators. The introduction of cold water into the hot steam generators during full power operation results in a significant thermal shock to the feedwater nozzle. Subjecting the feedwater nozzle to this thermal transient on a quarterly basis decreases the fatigue life of the nozzle and could possibly result in nozzle cracking.

There are no system provisions for utilizing flow or pressure as an indication of reverse flow closure.

ALTERNATE TESTING:

These valves are partial-stroke exercised quarterly during the turbine-driven AFW pump test.

These valves will be full-stroke exercised on a cold shutdown frequency by verifying that the AFW pump is delivering the required flow through valves 1302-04-014, 1302-U4-017, 1302-U4-020, 1302-U4-023 and 1302-U4-026 as discussed in CS-19.

Reverse flow closure will be demonstrated by j

disassembly and manual full-stroke exercising on a staggered test basis at refueling. Valves will be exercised with flow after reassembly.

GENERIC LETTER 89-04 REVIEW:

This relief request complies with the alternative to full flow testing of check valves as described in Position 2 of NRC Generic Letter 89-04.

001160 13-23 Rev. 4 i

j

!. a 1

COLD SHUTDOWN JUSTIFICATION l

i CS-31 1

j I

I SYSTEM:

Main Steam - System No. 1301 j

2 l

VALVE (S):

1301-U4-404 l l 1

i CATEGORY: C i

1 l

CLASS:

3

(

I ll FUNCTION: This valve opens to allow steam to the AFW pump turbine.

I QUARTERLY TEST REQUIREMENT:

Verify forward flow operability per IWV-3522.

l l COLD SHUTDOWN l

TEST JUSTIFICATION:

This valve is partial-stroke exercised quarterly

[l during the turbine-driven AFW pump test.

i Full-stroke exercising.during power operation cannot be performed because the turbine-driven AFW pump is not delivering full flow to the steam generators.

j i

QUARTERLY FARTIAL

~

STROKE TESTING:

Partial-stroke exercising is perfomed during the turbine-driven AFW pump test.

i COLD SHUTDOWN TESTING: Testing of valves 1302-U4-014,1302-U4-017, d

1302-U4-020, 1302-U4-023, and 1302-U4-026 as discussed in CS-19 verifies that valve 1301-U4-404 opens to perform its safety related function by ensuring that the AFW pump is. delivering required flow.

=

i GENERIC LETTER 89-04 REVIEW:

This cold shutdown justification complies with the full-stroke testing requirements for check valves as described in Position 1 of NRC Generic Letter 89-04.

1 001160 14-31 016 Rev. 4

.