April 15, 1993 Docket No. 50-301 4
NOED No. 93-6-012
)
l Mr. Robert E. Link, Vice President l
Nuclear Power Department Wisconsin Electric Power Company l
231 West Michigan Street, Room P379 Milwaukee, Wisconsin 53201
Dear Mr. Link:
i l
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION FOR WISCONSIN ELECTRIC POWER l
COMPANY REGARDING POINT BEACH UNIT 2 l
By letter dated April 9,1993, you requested the U.S. Nuclear Regulatory l
Commission (NRC) to exercise its discretion not to enforce compliance with the l
monthly reactor protection and safeguards circuit testing requirements speci-fled in Technical Specification (TS) Table 15.4.1-1 Item Nos.1, 4(1), 4(2),
5, 6, 7, 8, 11, 12, 18, 24, 25, 26, and 33 and TS Table Item No. 26(a).
You informed the NRC on April 8,1993, that Point Beach, Unit 2, would not be in compliance with TS Section 15.4, " Surveillance Requirements," on April 13, l
1993. Your request indicated a need for enforcement discretion based on the limited availability of baseload units and the potential for a localized degraded voltage condition to exist if Point Beach, Unit 2 were to be inadver-tently removed from the northeast Wisconsin power grid.
Your justification for continued operation included a review of reactor trip breaker performance and significant operating experience data related to instrument drift to assure instrument setpoints would not drift beyond the setpoint limits.
i Based on our review of your justification and the limited time this exercise l
of enforcement discretion is in effect, we have concluded that this course of action involves minimum or no safety impact, and we are clearly satisfied that this exercise of enforcement discretion is warranted from a public health and i
safety perspective. Therefore, it is our intention to exercise discretion not to enforce compliance with the aforementioned items contained in TS Tables 15.4.1-1 and 15.4.1-2 for the period from April 9,1993 to 14 days following the startup of the Kewaunee Nuclear Plant or Point Beach, Unit 1, not to exceed May 13, 1993. However, we will consider enforcement action, as i
appropriate, for the conditions that led to the need for this exercise of enforcement discretion.
Sincerely, l
,, John Zwolinski, Assistant Director y., n w,y m o.
H' '
~'
for Region III Reactors N304200273930415 D@fice of Nuclear Reactor Regulation on of Reah hojeds HIM l
Of i
PDR ADOCK 05000301 P
PDR cc: See next page DISlRIBUTION Docket-File ATGody,Jr.
NRC & Local PDRs JRichardson g
i g
PDIII-3 Reading OGC JRoe MRushbrook %p ACRS(10)
JZwolinski JHannon Region III, DRP e
c>
CBerlinger JWermiel MBoyle_
/
1 ] e,/ A A/
i ADR3 ( h 1.DE:DIRM OFFICE PD3-3:LA PD3-3:PM /,
PD3 P) l NAME MMhhok AGodyJr/a[g/bj JHannon k
JZwolinskFJRicha41' son 3g N /k k93 Y//f/93 h//h/93 h//d/93 N/ /393 11 O DATE l
DOCUMENT NAME: g:\\PIBEACH\\N0ED4-9.PD OFFICIAL RECORD i
i Note: W. Forney, RIII concurred per telecon dated April 9, 1993.
7 d
i
$p*"Ecg y
! O f
t UNITED STATES I
[.k2[ f*pg }
NUCLEAR REGULATORY COMMIS$10N WASHINGTON. D C. 20566-0001 gg% j 3
...+
April 15, 1993 l
2 Docket No. 50-301 N0ED No. 93-6-012 l
i Mr. Robert E. Link, Vice President Nuclear Power Department l
Wisconsin Electric Power C/,mpany 231 West Michigan Street, Room P379 J
Milwaukee, Wisconsin 53201
Dear Mr. Link:
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION FOR WISCONSIN ELECTRIC POWER COMPANY REGARDING POINT BEACH UNIT 2 l
By letter dated April 9,1993, you requested the U.S. Nuclear Regulatory Commission (NRC) to exe-cise its discretion not to enforce compliance with the monthly reactor protection and safeguards circuit testing requirements speci-fled in Technical Specification (TS) Table 15.4.1-1 Item Nos.1, 4(1),.4(2),
5, 6, 7, 8, 11, 12, 18, 24, 25, 26, and 33 and'TS Table Item No. 26(a).
You informed the NRC on April 8,1993, that Point Beach,. Unit 2, would net be in compliance with TS Section 15.4, " Surveillance Requirements," on April 13, 1993. Your request indicated a need for enforcement discretion based on the limited availability of baseload units and the potential for a localized i
degraded voltrg condition to exist if Point Beach, Unit 2 were to be inadver-tently removed rom the northeast Wisconsin power grid.
Your justification for ccatinued operation included a review of reactor trip breaker performance and significant operating experience data related to instrument drift to assure instrument setpoints would not drift beyond the setpoint limits.
i Based on our review of your justification and the limited time this exercise l
of enforcement discretion is in effect, we have concluded that this course of l
action involves minimum or no safety impact, and we are clearly sati'sfied that this exercise of enforcement discretion is warranted from a public health and safety perspective. Therefore, it is our intention to exercise discretion not to enforce compliance with the aforementioned items contained in TS Tables 15.4.1-1 and 15.4.1-2 for the period from April 9,1993 to 14 days following the startup of the Kewaunec Nuclear Plant or Point Beach, Unit 1, not to exceed May 13, 1993. However, we will consider enforcement action, as appropriate, for the conditions that led to the need for this exercise of enforcement discretion.
S r ly,
/
/
ohn Zwolinski, Assistant Director for Region III Reactors Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc: See next page a
4 w
Mr. Robert E. Link Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 cc:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations t
799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road
)
i Two Rivers, Wisconsin 54241 i
l l
1 l
i