ML20035F094

From kanterella
Jump to navigation Jump to search
Informs That Licensee 930326 Submittal of Plant Security Plan for Shipment of Slightly Irradiated Fuel Acceptable
ML20035F094
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/15/1993
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Leslie Hill
LONG ISLAND LIGHTING CO.
References
NUDOCS 9304200249
Download: ML20035F094 (1)


Text

_ _ _

APR 151993 IMTB:MEL DISTRIBUTION:

50-322 NMSS/IMIB r/f HRC F/C NRC PDR PDI-2 Reading Mr. L. M. Hill, Resident Manager SVarga JCalvo Shoreham Nuclear Power Station CMiller FRinaldi P.O. Box 628 M0'Brien 0GC LBell, LLW, RI EWenzinger North Country Road ACRS(10)

Wading River, NY 11792 CAnderson, RI R. Nimitz, RI G. Smith, RI

Dear Mr. Hill:

NRC local PDRs As requested in your letter dated March 26, 1993, we have reviewed your Security Plan (Plan) for the shipment of slightly irradiated fuel from the Shoreham Nuclear Power Station to the Limerick Generating Station.

For clarification, paragraph II.C.11 should be revised to require notification to the NRC within I hour for a lost or unaccounted for shipment. Also, immediate notification after the estimated time of arrival should be made to Long Island Power Authority (LIPA) for a lost or unaccounted for shipment, followed by the immediate initiation of a trace investigation.

In paragraph l

1.D.3.a., notification requirements should be included for the road segment of the shipments.

i As discussed with Mr. Schoenwiesnar of your staff on April 14, 1993, upon addressing these comments the Plan is acceptable for meeting the requirements of 10 CFR Part 73.67.

In addition, in paragraph II.C.8 we suggest that the receiver be requested to sign and return a copy of the Plan to LIPA, thereby accepting the physical protection arrangements outlined in the Plan.

Please note that pursuant to 10 CFR 70.32(d), changes that do not decrease the effectiveness of the Pian for physical protection may be made without further review by HRC. A copy of changes should be forwarded to NRC within two months after they are made.

As stated in your ictter of Apr'l 6,1993, the information in the Plan does not contain Safeguards Information as defined in 10 CFR 73.21. However, the Plan will be handled in accordance with the provisions of 10 CFR 2.790(d).

Sincerely, Original Signed by Charles E. MacDonald, Chief Transportation Branch Division of Industrial and Medical Nuclear Safety, NMSS DOCUMENT NAME:

S:\\ PLAN. LIP fw, 1YB' C-IMTB d

IMTB I

0FC IMTB_

e-IMTB C

NAME MLNahdi/ij Y JCook EEaston CMacDonald l

DATE

,' //5 /93 A4 / / C/93 4 /15 /93 9' / /f'/93

/

/93 l

y l

C = COVER E = COVER & ENCLOSURE N = NO COPY I

i am 3 -

b 2 d Ubu + L -

I 9304200249 930415 PDR ADOCK 05000322 F

PDR

)fO (

t (o