Extends Appreciation for Attendance at 930323 Meeting W/ Yankee Atomic Electric Co in Rockville,Md.Requests Review of Calculations & Rept Re Transport of Four SGs from Yankee Nuclear Power Station to Barnwell,Sc for Disposal
ML20035F098
Person / Time
Site: 07109256
Issue date: 04/06/1993
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sandhusen H
TRANSPORTATION, DEPT. OF
References
NUDOCS 9304200257
Download: ML20035F098 (2)


Text

........ _ _ _ _ _

nau 4

UNITED STATES

.e 1

-[

j NUCLEAR REGULATORY COMMISSION

  1. d
  • g g

WASHINGTON, D.C. 20566 4001

%,*****f APR 6 1993 I

IMTB:NLO l

71-9256 Mr. Henry Sandhusen Federal Highway Administration Office of Highway Safety 4

400 Seventh Street, S.W.

Washington, DC 20590

Dear Mr. Sandhusen:

Thank you for attending the meeting with Yankee Atomic Electric Compar.y (YAEC) s which was held at our offices in Rockville, Maryland, on March 23, 1993.

t As discussed at that meeting, YAEC is planning to transport four steam generators from their Yankee Nuclear Power Station to the disposal facility in Barnwell, South Carolina. The steam generator. are large steel components, weighing about 300,000 pounds each. The steam u.erators contain low levels s

of radioactive contamination and are filled with coni. rete.

The transport route is from the Yankee Nuclear Power Station near Rowe, Massachusetts, to the rail line at the Hoosac Tunnel, near the town of Florida, Massachusetts. After leaving the Yankee site, the shipments will

_~

cross a privately owned earth dam and a privately owned bridge. The dam and bridge are owned by New England Power Company. The shipment route is then along six miles of highway owned by Franklin and Berkshire Counties. We understand that the towns of Florida and Monroe are responsible for issuing overweight permits for this highway.

As discussed at the March 23 meeting, YAEC has contracted with private engineering firms to survey the route and to evaluate the adequacy of the roadway, the culverts, the earth dam, the bridge, and the portable beams which will be used to span the bridge. YAEC and its contractors will prepare engineering calculations and reports which evaluate the safety of tte roadeay and structures.

We request that the Federal Highway Administration review these calculations and reports, and evaluate the adequacy of the route, including the private bridge and dam. We understand that YAEC's reports will be available by mid-May. We also understand that approxwately two weeks will be needed for you to review the reports and to survey the route, if necessary.

M N

200C57 1 0

,b 9304200257 930406 PDR ADOCK 07109256

[

C PDR

.Mr. Henry Sandhusen If you are able to provide this assistacce, we will forward copies of the engineering reports and calculations to you, or the person you designate within the Federal Highway Administration.

The project manager for our review of this application is Ms. Nancy Osgood (301) 504-2459.

Please contact us if you have any questions or comments. Thank you for your assistance.

Sincerely, Original Signed By Charles E. MacDonald, Chief Transportation Branch Division of Industrial and Medical Nuclear Safety, NMSS cc:

Bruce Holmgren Yankee Atomic Electric Co.

Di st ribution_1 NRC File Center-RChappell Mort Fairtile N0sgood

~~

Jack Parrott RCunningham RBernero IMTB r/f GArlotto NMSS r/f CMacDonald NRC PDR OFC IMTB C

IMTB G

IMTB C

IMTB IMTB NAME N0sgood/ij R$h'apEell CMbnald 2

DATE 4/! /93 4/(93 l 4/// /93

/

/93

/

/93 C = COVER E = COVER & ENe>0SURE N = NO COPY

_...