MONTHLY OPERATING REPCRT BROWNS FERRY NUCLEAR PLANT
}
TENNESSEE VALLEY AUTHORITY MARCH 1993 DOCKET NUMBERS 50-259, 50-260, AND 50-296 LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 i
P i
s 9304200215 930414 PDR ADOCK 05000259 R
I i
1 i
4 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-259 f
UNIT:
one PREPARED BY:
S.
A.
Ratliff i
TELEPHONE:
(205) 729-2937 i
i i
t MONTH MARCH 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(Mwe-Net)
(Mwe-Net)
I I
1 0
17 0
i 2
0 18 0
i 3
0 19 0
{
i 4
0 20 0
i l
5 0
21-0 6
0 22 0
7 0
23 0
i l
8 0
24 0
9 0
25 0
}
10 0
26 0
11 0
27
- 0 12 0
28 0
[
13 0
29 0
l 14 0
30 0
l t
t 15 0
31 0
I i
16 0
i t
9 i
l
..,r,4..
-sr--
i
+wa
,c+--.,,,
aw,,
e
,,o,wm- - -_-
.m.r_..,7=w,
,w--
3
,,,i---.-,
.wa
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-259 UNIT:
Two PREPARED BY:
S.
A.
Ratliff TELEPHONE:
f2051 729-2937 MONTH MARCH 1993 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)
(Mwe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
j 6
0 22 0
7 0
23 0
i 8
0 24 0
a h
9 0
25 0
1 4
l 10 0
26 0-l 11 0
27 0
l 12 0
28 0
t I
13 0
29 0
l 1
14 0
30 0
l 4
15 0
31-0 l
l j
16 0
I 1
1 a
,...,,,..n.
m._
i i
+
AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO:
50-259 h
i UNIT:
Three PREPARED BY S.
A.
Ratliff i
TELEPHONE:
(205) 729-2937 f
MONTH MARCH 1993 DAY AVEP. AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)
(MWe-Net) 1 0
17 0
i 2
0 18 0
i 3
0 19 0
i i
4 0
20 0
5 0
21 0
6 0
22 0
I 7
0 23 0
[
t 8
0 24 0
l 9
0 25 0
f 10 0
26 0
3 11 0
27 0
l 12 0
28 0
j 13 0
29 0
14 0
30 0
f i
15 0
31 O
{
16 0
DOCKET NO:
50 259 UNIT SHUTDOWNS QND POWER REDUCTIONS UNIT NAME:
_S. A. Ratliff Ona PREPARED BV:
REPORT MONT;.
MARCH 1993 TELEPHONE: (205) 739 2937 4
Method of License Cause and Corrective Duration Shutting Event System C, w't Action to Prevent No.
Date Type' (Hours)
Reason' Down Reactor' Report No.
Code
- Code Recurrence 315 06/01/85 N/A 744 F
4 Adninistrative hold to resolve various TVA and NRC concerns.
'Fi Forced
' Reason:
Method:
' Exhibit G-Instructions St Scheduled A-Equipment Failure (Explain)-
1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3 Automatic Scram Event Report (LER) File D Reguletory T ~iction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Trat y and License Examination 5-9 eduction F-Administrative 9-Other G-Operational Error (Explain)
' Exhibit I-Same Source H-Other (Explain)
.. ~~
DOCKEI NO:
$0 259 UNIT SHUTDOWNS AND POWER REQUCTIONS Unit NAME:
Two PREPARED BY:
S. A. Rattiff REPORT MONTH:
MARCH 1993 TELEPHONE: (205) 739-2937 Method of License Cause and Corrective Duration Shutting Event System Conponent Action to Prevent No.
Date type' (Hours)
Reason' Down Reactor' Report No.
Code
- Code' Recurrence 1
01/29/93 5
744 C
4 Refueling outage scheduled for 100 days.
'Ft Forced
'Reeson:
'M th do:
" Exhibit G-Instructions e
5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3 Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5 Reduction F-Adninistrative 9-Other G-operational Error (Explain)
' Exhibit I Same Source H Other (Explain) 4 u-a
--,ww s
es-
.. ~
,,w--
r w-
,-e~w
.~-
-~-w<. - --e e---,
-,-c.--
v---
a
DCCKET NO:
50-259 UNIT SHUTDOWNS QND POWER REDUCTIONS UNIT NAME:
Three 4
PREPARED BY:
S. A. Ratliff REPORT MONTH:
MARCH 1993 TELEPHONE: (205) 739 2937 Method of License Cause and Corrective Duration Shutting Event System Component Action to Prevent
. No.
Date Type' (Hours)
Reason' Down Reactor' Report No.
Code
- Code' Recurrence 315 06/01/85 N/A 744 F
4 AdministratlYe hold to resolve various TVA and NRC concerns.
'F:
Forced
- eason:
Method:
- Exhibit G-Instructions R
5: Scheduled A-Equipment Failure (Explain) 1-Manual.
for Pi<_eration of Data B-Maintenance or Test 2-Manual Scram Entry eets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Adninistrative 9 Other G-operational Error (Explain)
' Exhibit !*Same Source H-Other (Explain) i' i
1
. ~..
i OPERATING DATA REPORT I
l DOCKET NO.
50-259 PREPARED BY SCOTT A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS
- 1. Unit Name PROWNS FERRY UNIT ONE
- 2. Reporting period MARCH, 1993
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0 8.
If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: NA l
- 9. Power Level To which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any Administrative hold THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 744.0 2160 95743
- 12. Hours Reactor Was Critical O.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 l
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787 l
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-2089.0
-7166 53501506
- 19. Unit Service Factor 0.0 0.0 60.9
- 20. Unit Availability Factor 0.0 0.0 60.9 l
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 52.8
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 52.8 l
- 23. Unit Forced Outage kate 0.0 0.0 25.6 I
- 24. Shutdowns Scheduled Over Next 6 Month l
(Type, Date, and Duration of Each):
- 25. If Shut Down At End of Reporting Period, Estimated Date Of Startup: To be determined
- Excludes hours under administrative hold i
I
l I
l OPERATING DATA REPORT l
DOCKET NO.
50-260 PREPARED BY SCOTT A.RATLIFF TELEPHONE 205-729-2937 t
OPERATING STATUS l
- 1. Unit Names BROWNS FERRY UNIT TWO
- 2. Reporting period: MARCH, 1993
- 3. Licensed Thermal Power (MWt): 3293 l
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe):-1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: NA l
l
- 9. Power Level To which Restricted, If Any (Net MWe): NA i
- 10. Reason For Restrictions, If Any: NA l
THIS YEAR-TO MONTH DATE CUMULATIVE
- l
- 11. Hours In Reporting Period 744.0 2160 106711
- 12. Hours Reactor Was Critical 0.0 681 69644
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200 i
- 14. Hours Generator On Line 0.0 680 67552 l
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 1526669 192255321
- 17. Gross Electric Generation (MWh) 0.0 501730 63779378
- 18. Net Electric Generation (MWh)
-3577.0 475781 61683532
- 19. Unit Service Factor 0.0 31.5 63.3
- 20. Unit Availability Factor 0.0 31.5 63.3
- 21. Unit Capacity Factor (MDC Net) 0.0 20.7 54.3
- 22. Unit Capacity Factor (DER Net) 0.0 20.7 54.3
- 23. Unit Forced Outage Rate 0.0 0.0 19.6 l
- 24. Shutdowns Scheduled over Fere 6 Month (Type, Date, and Duration of Each):
l l
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup May 8, 1993
- Excludes hours under administrative hold l
l
{
h
(
l OPERATING DATA REPORT l
I l
l DOCKET NO.
50-296 PREPARED BY SCOTT A.RATLIFF I
TELEPHONE 205-729-2937-I I
OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT THREE l
- 2. Reporting period: MARCH, 1993
- 3. Licensed Thermal Power (MWt): 3293 l
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0
- 8. If Changes occur in capacity Ratings (Items Number 3 l
Through 7) Since Last Report, Give Reason: NA
- 9. Power Level To which Restricted, If Any (Net MWe): O i
- 10. Reason Fct Restrictions, If Any: Administrative hold l
5 i
THIS-YEAR-TO
[
MONTH-DATE CUMULATIVE
- l
- 11. Hours In Reporting Period 744.0 2160 73055
- 12. Hours Reactor Was critical 0.0 0
45306 i
t
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150 l
l
- 14. Hours Generator On Line 0.0 0
44195
- 15. Unit Reserve Shutdown Hours 0.0 0
0 f
- 16. Gross Thermal Generation (MWh) 0.0 0
131868267
- 17. Gross Electric Generation (MWh) 0.0 0
43473760
- 18. Net Electric Generation (MWh)
-1865.0
-6758 41924498
)
- 19. Unit Service Factor 0.0 0.0 60.5
- 20. Unit Availability Factor.
0.0 0.0 60.5
- 21. Unit capacity Factor (MDC Net) 0.0 0.0 54.2
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 54.2
- 23. Unit Forced Outage Rate 0.0 0.0 21.6
- 24. Shutdowns Scheduled ^^er Next 6 Month (Type, Date, and '
LLon of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startups To be determined
- Excludes hours under administrative hold-l'
- - -