ML20035F065
| ML20035F065 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 02/28/1993 |
| From: | TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20035F060 | List: |
| References | |
| NUDOCS 9304200216 | |
| Download: ML20035F065 (1) | |
Text
.
OPERATIONAL SUMFJtRY FEBRUARY 1993 UNIT 1 Unit I remains on administrative hold to resolve various TVA and NRC concerns.
This month's operating data report reflects the assignment of administrative hold status to unit one effective June 1, 1985.
Administrative hold status is considered by TVA to suspend the accrual of reporting period hours, because this unit is considered to have a maximum dependable capacity of 0 Mwe.
For L
this reason, cumulative reporting period hours for the period after June 1, 1985, to present are not considered when calculating operating status variables such as cumulative capacity factor rate.
These considerations will affect the other operating status reporting variables accordingly.
UNIT 2 Unit 2 entered a refueling outage on January 29, 1993. The outage is scheduled to last 100 days, with estimated unit restart on May 8, 1993.
The reporting factors have been revised to reflect the administrative hold status for Unit 2 from June 1, 1985 until restart for cycle 6 (May 24, 1991).
UNIT 3 Unit 3 remains on administrative hold to resolve various TVA and NRC concerns.
This months operating data report reflects the assignment of administrative hold status to Unit 3 effective June 1, 1985.
Administrative hold status is considered by TVA to suspend the accrual of reporting period hours, because this unit is considered to have a maximum dependable capacity of 0 Mwe.
For this reason, cumulative reporting period hours for the period after June 1, 1985, to present are not considered when calculating operating status variables such as cumulative capacity factor rate.
These considerations will affect the other operating status reporting variables accordingly, i
i 9304200216 930414 PDR ADOCK 05000259 R
pm
.