ML20035F049

From kanterella
Jump to navigation Jump to search
Forwards Book 5, Final Decontamination & Decommissioning Surveys, Transmitting Survey Info Tabbed as Attachment A,B, C & D
ML20035F049
Person / Time
Site: 07000371
Issue date: 04/08/1993
From: Gregg R
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
To: Joseph Austin
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20035F053 List:
References
NIS-93-04-02, NIS-93-4-2, NUDOCS 9304200208
Download: ML20035F049 (2)


Text

(T

~

70- DI m a sa m A 6/ Sandy Desert Re,ad uswNavalProducts un__ _,

203/848-1511 Teiecopy 203< 6460022 o

h.;.

TW7. 710i432-1243 s

In Reply Please Refer'To:

NIS 93-04-02 April 8, 1993

[

t Mr. John Austin, Chief t

Decommissioning and Regulatory Issues Branch Division of Low-Level Waste Management and Decommissioning

+

Office of Nuclear Material Safety and Safeguards

- U.S. Nuclear Regulatory Commission l

Washington, DC 20555 g

Reference:

(1)

Letter R. J. Gregg (UNC) to J. H. Austin (NRC) f dated 3/5/92 (2)

Letter R. J. Gregg (UNC) to J. H. Austin (NRC) i dated 4/7/92 (3)

Letter R. J. Gregg (UNC) to J. H. Austin (NRC)

I dated 10/16/92

Dear Mr. Austin:

[

This letter transmits survey information, tabbed as Attachment A,

which becomes a part of.our Book 1, Final Decontamination and Decommissioning Surveys previously sent under the reference (1) and i

(2) letters which are included for your convenience.

I This letter also transmits. survey information, tabbed, as Fliial i

M Attachment B,

which is a

supplement to Book 3B' Decontamination and Decommissioning Surveys previously sent under the reference (3) letter which is included for_your convenience.

Copies of-Attachment A and B survey data were Fupplied to ORISE and the NRC Region 1 project manager during alread, completed site visits.

i

&.f.f.+r)-

\\,h T

~

,mm,.

g/

,' [/

// ff f I

.[DR ADDCK 07 1

h*p/hg A udCCompany ossposst J

7;_..

o y

i Mr. John Austin NIS 93-04-02 Page 2 i

i

Finally, this letter transmits final survey data for L Building support areas, tabbed as Attachment C,

and subsurface excavations associated with certain equipment and core sampling associated with loading docks, tabbed as Attachment D.

We anticipate that these areas will be surveyed by ORISE during their i

scheduled visit next month.

I If there are any questions regarding this submittal, please contact me.

I very truly yours, r

k) ll, R. J. Gregg,, Director, Technical Services Attachments

/ mag I

cc:

J. Roth (NRC, Region I)

[

J. Parratt (NRC)

[

M.

Landis/J., Berger (ORIEE)

D. Luster G. Waugh i

f P