- ML20009G054 + (ML20009G054)
- ML20009G057 + (ML20009G057)
- ML20009G058 + (ML20009G058)
- ML20009G061 + (ML20009G061)
- BSEP-81-1271, Confirms 810625 Conversation Between CS Bohanan & R Butcher Re United Engineers & Constructors,Inc Notification That 38 Control Rod Driveline Gang Pipe Supports Would Fail in as-built Condition During Design Seismic Event + (ML20009G062)
- BSEP-81-0945, Ro:On 810506,investigation on RHR Heat Exchangers Determined That B Heat Exchanger Baffle Was Deformed at Bottom Allowing Bypass Flow.Cause Being Evaluated.Repairs on 2B RHR Heat Exchanger in Progress + (ML20009G063)
- ML20009G064 + (ML20009G064)
- IR 05000412/1981005 + (ML20009G065)
- ML20009G066 + (ML20009G066)
- 05000369/LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl + (ML20009G068)
- ML20009G069 + (ML20009G069)
- AECM-81-232, First Status Rept on Potentially Reportable Deficiency Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve,Initially Reported on 810527.Investigation Ongoing.Final Rept Expected by 811029 + (ML20009G070)
- ML20009G071 + (ML20009G071)
- TXX-3373, Forwards Test Procedure to Qualify Protective Envelope Sys to Protect Redundant Essential Electrical Cables at Comanche Peak Steam Electric Station + (ML20009G073)
- ML20009G074 + (ML20009G074)
- IR 05000213/1981007 + (ML20009G075)
- ML20009G076 + (ML20009G076)
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written + (ML20009G077)
- 05000287/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (ML20009G078)
- ML20009G079 + (ML20009G079)
- ML20009G080 + (ML20009G080)
- 05000324/LER-1981-056, Forwards LER 81-056/01T-0 + (ML20009G081)
- ML20009G082 + (ML20009G082)
- 05000309/LER-1981-081, Forwards LER 81-081/03L-0.Detailed Event Analysis Encl + (ML20009G083)
- ML20009G085 + (ML20009G085)
- ML20009G086 + (ML20009G086)
- 05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room + (ML20009G087)
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared + (ML20009G088)
- 05000324/LER-1981-056-01, /01T-0:on 810624,notification Received That 38 Pipe Supports Would Have Failed During Design Basis Seismic Event.Caused by Higher than Normal Slenderness Ratio. Identified Supports Upgraded + (ML20009G089)
- ML20009G090 + (ML20009G090)
- 05000311/LER-1981-037, Forwards LER 81-037/03L-0.Detailed Event Analysis Encl + (ML20009G091)
- ML20009G092 + (ML20009G092)
- 05000324/LER-1981-055, Forwards LER 81-055/03L-0 + (ML20009G093)
- ML20009G094 + (ML20009G094)
- ML20009G095 + (ML20009G095)
- ML20009G096 + (ML20009G096)
- ML20009G097 + (ML20009G097)
- ML20009G098 + (ML20009G098)
- ML20009G099 + (ML20009G099)
- ML20009G100 + (ML20009G100)
- BSEP-81-1259, Clarifies Event Previously Reported as LER (2-81-56)per 810618 Telcon.Facility in Compliance W/Ieee 279-1971.No Reportable Event Determined.Ler Number Referenced Will Be Reassigned as Appropriate + (ML20009G102)
- ML20009G103 + (ML20009G103)
- 05000369/LER-1981-090, Forwards LER 81-090/03L-0.Detailed Event Analysis Encl + (ML20009G104)
- ML20009G105 + (ML20009G105)
- 05000324/LER-1981-055-03, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced + (ML20009G107)
- BSEP-80-1263, RO 2-84-55:anchor Bolt Testing Required by IE Bulletin 79-02 Not Performed on Control Rod Drive Piping.Caused by Unusual Arrangements for Installation of Piping.Anchor Bolt Repairs & as-built Verifications Table Done + (ML20009G108)
- 05000261/LER-1981-016, Forwards LER 81-016/03L-0 + (ML20009G109)
- ML20009G110 + (ML20009G110)
- 05000311/LER-1981-037-03, /03L-0:on 810608,paper Filter Drive for Containment Particulate Channel 2R11A Failed.Caused by Failure of Racket Arm Link on Filter Drive Mechanism.Link Replaced + (ML20009G111)
- 05000311/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (ML20009G112)
- ML20009G113 + (ML20009G113)