Forwards LER 81-080/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G069


LER 81-080/03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written