Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G016 + (ML20009G016)
- 05000369/LER-1981-092-03, /03L-0:on 810530,auxiliary Feedwater Flow Rate Instrumentation Pegged High.Caused by Failed Transmitters. Transmitters Replaced & Calibr.Power Supply Removed & Will Be Replaced + (ML20009G017)
- 05000261/LER-1981-014-03, /03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced + (ML20009G018)
- 05000369/LER-1981-078, Forwards LER 81-078/03L-0.Detailed Event Analysis Encl + (ML20009G019)
- ML20009G020 + (ML20009G020)
- ML20009G022 + (ML20009G022)
- 05000369/LER-1981-078-03, /03L-0:on 810507,reset Pushbutton on Pressurizer Safety Injection Train B Pressed Instead of Safety Injection Reset Train 1B Button.Caused by Personnel Error.Different Method to Be Used to Reset Valve Timing Computer Program + (ML20009G023)
- 05000327/LER-1981-067, Forwards LER 81-067/01T-0 + (ML20009G025)
- ML20009G026 + (ML20009G026)
- 05000369/LER-1981-096, Forwards LER 81-096/01T-0.Detailed Event Analysis Encl + (ML20009G027)
- ML20009G028 + (ML20009G028)
- 05000369/LER-1981-096-01, /01T-0:on 810624,Type C Leak Test Not Performed as Required for Bypass Leakage Paths on Penetration Used for Ice Loading.Caused by Not Being Listed in FSAR as Requiring Leak Test.Test Performed Satisfactorily + (ML20009G030)
- 05000369/LER-1981-097, Forwards LER 81-097/03L-0.Detailed Event Analysis Encl + (ML20009G031)
- ML20009G032 + (ML20009G032)
- 05000327/LER-1981-067-01, /01T-0:on 810626,while in Mode 4,site Evaluation Identified That Steam Generator Level Transmitters 1-LT-3-148,156,164,172,174 & 175 Would Fail During Loca. Caused by Incorrect Insulating Sleeving + (ML20009G033)
- 05000338/LER-1981-034, Forwards LER 81-034/03L-0 + (ML20009G034)
- ML20009G035 + (ML20009G035)
- 05000369/LER-1981-097-03, /03L-0:on 810612,in Mode 5,routine Surveillance Discovered That Quantity of Fire Detection Equipment Installed in Five Fire Zones Did Not Comply W/Tech Specs. Caused by Typographical Error & Incorrect Blueprints + (ML20009G036)
- 05000369/LER-1981-091, Forwards LER 81-091/03L-0.Detailed Event Analysis Encl + (ML20009G037)
- ML20009G038 + (ML20009G038)
- 05000338/LER-1981-034-03, /03L-0:on 810627,quadrant Power Tilt Ratio Indicated Tilt in Excess of 1.02 During Power Escalation. Caused by Control Rods Being Inserted Lower in Core than Desired While Increasing Reactor Power to 100% + (ML20009G039)
- ML20009G040 + (ML20009G040)
- L-81-316, Final Deficiency Rept Re Protuberance on Local Control Station Switches Supplied by Gould Rundel,Initially Reported 810625.Purchase Spec Revised to Specify Contact Maint During Position Change + (ML20009G041)
- 05000369/LER-1981-091-03, /03L-0:on 810530,peak Shock Annuciator Amber Light Observed On.Caused by Light Reed Switch from Triaxial response-spectrum Recorder Making Contact.Reed Switch Adjusted,Tested & Delared Operable + (ML20009G042)
- ML20009G043 + (ML20009G043)
- 05000259/LER-1981-031, Forwards LER 81-031/03L-0 + (ML20009G044)
- ML20009G045 + (ML20009G045)
- ML20009G046 + (ML20009G046)
- 05000259/LER-1981-031-03, /03L-0:on 810610,discovered That Eight Level Switches Would Not Operate During Maint on Scram Accumulator.Caused by Excessive Amounts of Substance on Switch Float & Guide Stem,Causing Float to Stick + (ML20009G047)
- ML20009G049 + (ML20009G049)
- ML20009G051 + (ML20009G051)
- ML20009G052 + (ML20009G052)
- ML20009G053 + (ML20009G053)
- ML20009G054 + (ML20009G054)
- ML20009G057 + (ML20009G057)
- ML20009G058 + (ML20009G058)
- ML20009G061 + (ML20009G061)
- BSEP-81-1271, Confirms 810625 Conversation Between CS Bohanan & R Butcher Re United Engineers & Constructors,Inc Notification That 38 Control Rod Driveline Gang Pipe Supports Would Fail in as-built Condition During Design Seismic Event + (ML20009G062)
- BSEP-81-0945, Ro:On 810506,investigation on RHR Heat Exchangers Determined That B Heat Exchanger Baffle Was Deformed at Bottom Allowing Bypass Flow.Cause Being Evaluated.Repairs on 2B RHR Heat Exchanger in Progress + (ML20009G063)
- ML20009G064 + (ML20009G064)
- IR 05000412/1981005 + (ML20009G065)
- ML20009G066 + (ML20009G066)
- 05000369/LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl + (ML20009G068)
- ML20009G069 + (ML20009G069)
- AECM-81-232, First Status Rept on Potentially Reportable Deficiency Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve,Initially Reported on 810527.Investigation Ongoing.Final Rept Expected by 811029 + (ML20009G070)
- ML20009G071 + (ML20009G071)
- TXX-3373, Forwards Test Procedure to Qualify Protective Envelope Sys to Protect Redundant Essential Electrical Cables at Comanche Peak Steam Electric Station + (ML20009G073)
- ML20009G074 + (ML20009G074)
- IR 05000213/1981007 + (ML20009G075)
- ML20009G076 + (ML20009G076)
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written + (ML20009G077)