ML20009G028

From kanterella
Jump to navigation Jump to search
Forwards LER 81-096/01T-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G028


LER 81-096/01T-0:on 810624,Type C Leak Test Not Performed as Required for Bypass Leakage Paths on Penetration Used for Ice Loading.Caused by Not Being Listed in FSAR as Requiring Leak Test.Test Performed Satisfactorily
ML20009G030
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/07/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G030 (1)
Forwards LER 81-096/01T-0.Detailed Event Analysis Encl
ML20009G027
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 07/07/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G027 (2)