ML20009G016

From kanterella
Jump to navigation Jump to search
Forwards LER 81-092/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G016


LER 81-092/03L-0:on 810530,auxiliary Feedwater Flow Rate Instrumentation Pegged High.Caused by Failed Transmitters. Transmitters Replaced & Calibr.Power Supply Removed & Will Be Replaced
ML20009G017
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/25/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G017 (1)
Forwards LER 81-092/03L-0.Detailed Event Analysis Encl
ML20009G015
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/25/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G015 (1)