Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000317/LER-1981-041, Forwards LER 81-041/03L-1 + (ML20008G272)
- ML20008G273 + (ML20008G273)
- 05000317/LER-1981-041-03, /03L-1:on 810612,discovered One of Four RWT Level Switches Was Isolated.Caused by Failure to Return 1-LS-4142C to Proper Lineup After Monthly Surveillance Test. Test Procedure Revised to Describe Inservice Valve Lineup + (ML20008G274)
- ML20008G275 + (ML20008G275)
- ML20008G276 + (ML20008G276)
- 05000317/LER-1981-042, Forwards LER 81-042/01T-0 + (ML20008G277)
- ML20008G278 + (ML20008G278)
- ML20008G279 + (ML20008G279)
- 05000317/LER-1981-042-01, /01T-0:on 810613,C-E Informed That Pipe Fittings Upstream of RCS Code Safety Valves Did Not Have Proper Inner Diameter (Id).Caused by Min Pipe Diameter Not Properly Stated on Original Drawings + (ML20008G280)
- 05000309/LER-1981-010, Forwards LER 81-010/03L-0 + (ML20008G281)
- 05000309/LER-1981-010-03, /03L-0:on 810611,w/plant in Refueling Shutdown Mode,Pressurizer Safety Valve Position Monitor Discovered Inoperable.Caused by Failed Preamp.Preamp Unit Replaced + (ML20008G283)
- ML20008G284 + (ML20008G284)
- ML20008G285 + (ML20008G285)
- ML20008G286 + (ML20008G286)
- PNO-III-81-058, on 810621,manual Valve on Common Discharge from Sodium Hydroxide Addition Tank Found Locked Shut During Periodic Sys Valve Check.Valve Returned to Locked Open Position + (ML20008G287)
- ML20008G288 + (ML20008G288)
- ML20008G289 + (ML20008G289)
- ML20008G290 + (ML20008G290)
- ML20008G291 + (ML20008G291)
- ML20008G292 + (ML20008G292)
- ML20008G293 + (ML20008G293)
- ML20008G294 + (ML20008G294)
- ML20008G295 + (ML20008G295)
- ML20008G297 + (ML20008G297)
- ML20008G298 + (ML20008G298)
- ML20008G299 + (ML20008G299)
- ML20008G302 + (ML20008G302)
- ML20008G306 + (ML20008G306)
- ML20008G308 + (ML20008G308)
- ML20008G311 + (ML20008G311)
- ML20008G312 + (ML20008G312)
- ML20008G314 + (ML20008G314)
- ML20008G315 + (ML20008G315)
- ML20008G318 + (ML20008G318)
- ML20008G319 + (ML20008G319)
- ML20008G321 + (ML20008G321)
- W3P81-1324, Forwards Training Program Per TMI Action Plan Item II.B.4 Re Mitigating Accidents Involving Core Damage,In Response to 810430 Telcon Request + (ML20008G322)
- ML20008G323 + (ML20008G323)
- ML20008G324 + (ML20008G324)
- ML20008G325 + (ML20008G325)
- ML20008G327 + (ML20008G327)
- ML20008G328 + (ML20008G328)
- IR 05000219/1981008 + (ML20008G329)
- ML20008G331 + (ML20008G331)
- ML20008G332 + (ML20008G332)
- ML20008G333 + (ML20008G333)
- 05000309/LER-1981-007, Forwards LER 81-007/01T-0 + (ML20008G334)
- ML20008G336 + (ML20008G336)
- 05000309/LER-1981-007-01, /01T-0:on 810602,svc Water Cooling to Specialized Common Carrier Was Interrupted for Approx 30 Minutes Due to Tripping 6080 Bus 6 to Breaker 8.Caused by Normal Breaker Trip Due to Addl Loads During Maint Verification Testing + (ML20008G337)
- ML20008G340 + (ML20008G340)
- ML20008G341 + (ML20008G341)