Provides Results of Preliminary Review of Generic BWR Safety Relief Valve Test Program in Response to NUREG-0737, Item II.D.1
ML20008G288
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/01/1981
From: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM FVY-81-99, NUDOCS 8107070273
Download: ML20008G288 (2)


Text

>

VERMONT YAN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RUTLAND VERMONT 057O1 FVY 81-99 ft EPLY TOs ENGINEERING OFFICE July 1, 1981 167 ORCESTER ROAD FRAMINGH.. M ASSACH USETTS 017o1 TELEPHONE 617 872-8100 United States Nuclear Regulatory Commission Washington, D. C.

20555 q

s p, Attention: Office of Nuclear Reactor Regulation y

=

JUL 0 61981 > p$

Mr. D. G. Eisenhut, Director Division of Licensing

'/

s

References:

(a) License No. DPR-28 (Docket No. 50-271)

.f (b) Letter from T. Dente (BWR Owners' Group) to D. G. Eisenhut (NRC), " Transmittal of Preliminaiy Q, ; ', A '

Data from Generic BWR Safety / Relief Valve (S/RV)

Test Program" dated 7-1-81 (c) Letter from D. B. Waters (BWR Owners' Group) to R. H. Vollmer (NRC), "NUREG-0578 Requirement 2.1.2-Performance Testing of BWR and PWR Relief and Safety Valves" dated September 17, 1980 (d) Letter from D. B. Waters (BWR Owner's Group) to D. G. Eisenhut (NRC), " Responses to NRC Questions on the BWR S/RV Test Progreim" dated March 31, 1981 (Rosponse to NRC Question No. 1)

Subject:

Preliminary Saf aty/ Relief Valve (S/RV) Operability Test Results for Vermont Yankee

Dear Sir:

In response to NUREG 0737, Item II.D.1, this letter provides the results of a preliminary review of the generic BWR S/RV test program results (Reference b) in order to confirm the adequacy of the S/RV's used by Vermont Yankee for all test conditions as defined in the test description (Reference c).

Vermont Yankee employs S/RV's manufactureu by Target Rock, Model No. 67-F.

The test results for the three stage Target Rock Valve indicated as74-67F are applicable to the valves used at Vermont Yankee (Reference (d)). A preliminary review of the generic BWR S/RV test program results demonstrates that the tested valve satisfies the acceptance criteria for operability. Therefore, based on this preliminary review, we have no reason to question the operational adequacy of the SRV's in use at Vermont Yankee.

,~8107070273 810701 gM

PDR ADOCK 05000271 6l l
P PDR 0

L.

j 1:

United States' Nuclear Regulatory Commission July 1, 1981 Attention:

Mr, 3. G. risenhut, Director Page Two We trust this information is acceptable. Should you have any questions, please contact us.-

Very truly youro, C-VERMONT YANKEE..UCLEAR POWER CORPORATION

,kh R. L. Smith Licensing Engineer i