ML20008G290
| ML20008G290 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/30/1981 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20008G291 | List: |
| References | |
| NUDOCS 8107070278 | |
| Download: ML20008G290 (2) | |
Text
-
PHILADELPHIA ELECTRIC COMPANY s
2301 M ARKET STREE.T P.O. BOX 8699 8
0) 1881 -1981 PHILADELPHI A. PA.19101
>~
JUL 0 6198W #
F EMIE S DALTROFF
(
suenic,.ooveno k$.7er ; '
June 30, 1981
'M -
Docket Nos. 50-278 Mr. John F.
Stolz, Chief Operating Reactors Branch #4 Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555
Reference:
Docket No. 50-278, Application for Amendment of Facility Operating License DPR-56, submitted 3/30/81 with respect to the Peach Bottom Atomic Power Station Unit 3 Reload 4 Application
Dear Mr. Stolz:
Due to our concern that surveillance specifications 3.5.K and 4.5.K with respect to scram time testing as submitted in our March 30, 1981 Amendment Application may be interpreted as inconsistent, we are submitting the attached revised pages 133b, c,d,& e which are to be inserted in the Application ~in place of the originally filed pages.
Page revisions are indicated by a vertical bar in the page margin.
In particular, the attached revised pages 133b, 133c, 133d, and 133e provide clarification of the relation between Sections 3.5.K and 4.5.K, with respect to the Technical Specifications pertaining to scram time surveillance.
The scram time surveillance Technical Specifications were modified in the k
6 u
s 8107070278 810630 Q i PDR ADOCK 050002784 l L4gl (\\
P PDR;j
Mr.
R. W. Stolz Page 2 3/30/81 license amendment request to accommodate the
' implementation of the ODYN transient analysis code into reload licensing.
If you or your staff have any questions regarding the above changes, please contact us.
Very truly yours, uen ;y
/
Attachment
,.,---ee--
- - U