Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005A540 + (ML20005A540)
- 05000213/LER-1981-007, Forwards LER 81-007/03L-0 + (ML20005A541)
- 05000368/LER-1981-020, Forwards LER 81-020/03L-0 + (ML20005A543)
- ML20005A544 + (ML20005A544)
- ML20005A545 + (ML20005A545)
- ML20005A546 + (ML20005A546)
- ML20005A547 + (ML20005A547)
- ML20005A548 + (ML20005A548)
- 05000213/LER-1981-007-03, /03L-0:on 810604,during Testing of Emergency Diesel Generator B Load Sequencing timers,20-s Acceptance Criteria for Starting Charging Pump Was Exceeded.Cause Not Stated.Time Delay Relay Reset + (ML20005A549)
- ML20005A550 + (ML20005A550)
- ML20005A551 + (ML20005A551)
- ML20005A552 + (ML20005A552)
- 05000368/LER-1981-020-03, /03L-0:on 810520,two Source Range Neutron Flux Monitor Signals Increased Suddenly.Probably Caused by Noise Interference.Investigation Underway.Cables & Connectors to Be Changed During Next Refueling Outage + (ML20005A554)
- ML20005A555 + (ML20005A555)
- 05000260/LER-1981-028, Forwards LER 81-028/01T-0 + (ML20005A557)
- ML20005A558 + (ML20005A558)
- TXX-3348, Informs That Licensee Evaluating Inclusion of TMI Action Plan Item II.F.1,containment High Range Radiation Monitor Into Existing Plant Radiation Monitoring Sys.Will Provide Exact Location of Monitors in Future Amend to FSAR + (ML20005A559)
- ML20005A560 + (ML20005A560)
- ML20005A561 + (ML20005A561)
- ML20005A562 + (ML20005A562)
- PNO-II-81-046, on 810622,primary to Secondary Leak Identified in Steam Generator 2B.Caused by Mechanical Tube Damaged During Installation of Insp Access + (ML20005A563)
- 05000312/LER-1981-030, Forwards LER 81-030/04T-0.Detailed Event Analysis Submitted + (ML20005A564)
- ML20005A566 + (ML20005A566)
- ML20005A567 + (ML20005A567)
- 05000368/LER-1981-021, Forwards LER 81-021/99X-0 + (ML20005A569)
- ML20005A570 + (ML20005A570)
- ML20005A571 + (ML20005A571)
- IR 05000334/1981011 + (ML20005A573)
- 05000260/LER-1981-028-01, /01T-0:on 810611,while Performing Routine Surveillance Test SI 4.2.B.8 During Maint Outage,Reactor High Pressure Switches Ps 68-93 Switch 2 & Ps 68-94 Switch 2 Were Above Tech Spec Limits.Caused by Setpoint Drift + (ML20005A574)
- ML20005A575 + (ML20005A575)
- 05000312/LER-1981-030-04, /04T-0:on 810602,plant Effluent Ph Exceeded Limit. Caused by Fluctuating Ph of Water Supply.Negotiations Underway to Set Ph Limits Based on Max Observed Canal Ph in Previous 30 Days + (ML20005A576)
- ML20005A577 + (ML20005A577)
- 05000368/LER-1981-021-99, /99X-0:on 810528,RCS Iodine Levels Increased, Indicating Failure of 20 to 30 Fuel Rods.Cause Being Investigated by Periscope Exam of Rods & Discharged Bundles. Leaking Assemblies Isolated,Reconstituted & Resipped + (ML20005A578)
- ML20005A580 + (ML20005A580)
- ML20005A581 + (ML20005A581)
- ML20005A582 + (ML20005A582)
- ML20005A583 + (ML20005A583)
- ML20005A587 + (ML20005A587)
- ML20005A588 + (ML20005A588)
- ML20005A589 + (ML20005A589)
- ML20005A591 + (ML20005A591)
- ML20005A593 + (ML20005A593)
- ML20005A595 + (ML20005A595)
- TXX-3351, Informs That Analyses for Moderate & High Energy Pipe Breaks on Redundant Pump Rooms,Per ,Will Include Verification That Breaks Will Not Cause Unacceptable Flooding of Redundant Essential Equipment + (ML20005A597)
- ML20005A598 + (ML20005A598)
- 05000324/LER-1981-028, Forwards LER 81-028/01T-0 + (ML20005A599)
- ML20005A600 + (ML20005A600)
- ML20005A601 + (ML20005A601)
- ML20005A604 + (ML20005A604)
- ML20005A605 + (ML20005A605)
- ML20005A607 + (ML20005A607)