Letter Sequence Request |
|---|
|
|
MONTHYEARIR 05000266/19810011981-02-13013 February 1981 IE Insp Repts 50-266/81-01 & 50-301/81-01 on 810102-30.No Noncompliance Noted.Major Areas Inspected:Followup on Items of Noncompliance,Operational Safety Verification & Monthly Maint Observation Project stage: Request ML20008E7351981-03-0202 March 1981 Responds to NRC 801021 & 810122 Requests for Addl Info Re Fire Protection Safety Evaluation Suppl.App R Mod Requirements Are Narrow in Scope & Do Not Assure That Increased Plant Safety Will Be Achieved Project stage: Other ML19247E3141981-03-18018 March 1981 Provides Info Re Fire Protection Mods at Facilities.Items Addressed:Water Damage Protection,Fire Barriers,Ventilation Sys Control Cables,Diesel Generator Air Intake Structure & Containment Bldg Fire Stops Project stage: Other ML19347D5751981-03-18018 March 1981 Requests Extension of Schedule Dates in New Fire Protection Regulations.Requests Exemption from Requirement Forbidding Shift Supervisor to Belong to Fire Brigade.Provides Basis for Both Requests Project stage: Other ML19347D5721981-03-18018 March 1981 Forwards Fire Protection Exemption Request Project stage: Other ML20003E7381981-04-0404 April 1981 Revises Reading of Second Paragraph on Page 7 of . Revised Statement Is Compatible W/Present Facility Fire Protection Organization Excluding Maint Group Personnel as Fire Brigade Members Project stage: Other ML20003G9571981-04-23023 April 1981 Informs That Fee for Fire Protection Mods Not Justified Per 10CFR170.22 Project stage: Other ML20004D4481981-06-0505 June 1981 Responds to NRC Re Fee for Approval of Licensee 810423 Request for Time Extension for Fire Protection Mods. Payment of Fee Should Not Be Required Since Request Was Not in Form of Amend to OL Project stage: Request ML20005A6041981-06-23023 June 1981 Advises That Applicant Disagrees W/Denial of Request for Exemption to 10CFR50 App R, Section Iii.H.Duty Operating Supervisor Designated as Fire Brigade Leader.Util Will Revise Circulating Water Pumphouse Mod for Item 3.2.2 Project stage: Request ML20030A9371981-07-24024 July 1981 Notifies That Util Will Periodically Test Inservice Hydostatic Fire Hoses Per NFPA 1962 & Requirements of 10CFR50 App E Section Iii.E Project stage: Other ML17275B3781981-08-11011 August 1981 Responds to 810724 Request for Clarification of Requirements Re Fire Hose Hydrostatic Testing.Util Commitment to Purchase New Fire Hose Is in Accordance W/Requirements of NEPA 1961 Code Project stage: Approval ML20031D3361981-10-0202 October 1981 Provides Status of Fire Protection Mods for Facility. Detectors Will Be Installed in Unit 1 Containment During Refueling Outage Which Begins 811009 & in Unit 2 During Spring 1982 Outage Project stage: Other ML20040E6821982-01-29029 January 1982 Requests Mod to 810318 Submittal Requesting Extension of Schedule Date Re Fire Protection to Revise Commitment Dates to 820630 & 820131,respectively Project stage: Other ML20041D8461982-02-18018 February 1982 Ack Receipt of Modifying 10CFR,App R Fire Protection Exemption Request.Evaluation of Request Will Be Forthcoming Project stage: Other ML20052F8051982-05-0404 May 1982 Advises That Commission Has Granted Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c). Revision of Generic Ltr 81-12 Encl Project stage: Approval ML20052F8091982-05-0404 May 1982 Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c) Project stage: Approval 1981-06-23
[Table View] |
Text
,: -
F Wisconsin Electnc ecua coupasr 231 W. MICHIGAN P.o BOX 2046. MitMUKEE. *I $3201 June 23, 1981 Yi
- ? y m.,',
fj[fg n((Y-Mr. Harold R. Denton, Director H
Office of Nuclear Reactor Regulation
{I 7 LI
'I.
U. S NUC:
"IGULATORY COMMISSION 2y JUll~o0198Jn d Washingt>
20555 d
.of Attention:
Mr. R. A. Clark, Chief "c%grou [/
Operating Reactors Branch #3
.?/
S Gentlemen:
3 DOCKET NOS. 50266 AND 50301 FIRE PROTECTION MODIFICATIONS POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Your May 4,1981 letter denied our request for exemption to 10 CFR Part 50 Appendix R, Section III.H. which was submitted with our March 18, 1981 letter.
Tne subject request for exemption would have allowed the shift super-visor to act as the fire brigade leader.
Although we disagree with your denial of our request for exemption, the duty operating supervisor has been designated to be the fire brigade leader.
Thereby, the Point Beach Nuclear Plant fire brigade satisfies the requirements of 10 CFR Part 50 Appendix R, Section III.H.
Your letter also states that our proposed modification for item 3.2.2 does not meet the requirements of Section III.G. of Appendix R to 10 CFR Part 50.
Therefore, we will revise the circulating water pumphouse modification to include a wet pipe automatic sprinkler system over the safety related pump area and we will provide fire detection and a fire-rated barrier to divide the service water pumps into two groups of three each and separate one group of three service water pumps from the diesel-driven fire pump as requested in to your letter.
Thereby, the circulating water pumphouse fire protection will satisfy the requirements of Section III.G. of Appendix R to 10 CFR Part 50.
The requested exemptions from certain schedule requirements of paragraph (c) of 10 CFR Part 50.48 were submitted with our March 18 letter to provide sufficient time for our completion of the detailed plant evaluation which the Commission requires.
These requested exemptions from arbitrarily specified completion dates do not, in our judgement, affect terms or conditions of our operating license as contemplated by 10 CFR 170.22. 06N 8106300lTO f
S'8 l
s a
s' Mr. Harold R. Denton June 23, 1981 Therefore, as stated in our April 23, 1981 letter, we do not believe that such requests are subject to any specified fees.
Very truly yours,