Text
-
/
' / p nee
,-
{jo
UNITED STATES
g
E
g
NUCLEAR REGULATORY COMMISSION
8
REGION 1
4
8
a31 PARK AVENUE
,o#
KING QF PRUSSIA, PENNSYLVANIA 19406
'
c....
JUN 111981
,ss.
m/ . _
Occket No. 50-423
/c v ~ . . : e
'
h ,7 [
, h
-
Northeast Nuclear Energy Company
f f,i p
' M _
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
'3
.3
,.
Engineering Operations
(0:
., . f"
3
^-
P. O. Box 270
,
9.5"J # '
Hartford, Connecticut 06101
\\ .-
Gentlemen:
J 9
Subject:
Inspection 81-05
This refers to the routine safety inspection conducted by Mr. J. Mattia of
this office on April 8-30 and May 1,1981 at Millstone Nuclear Power Station
Unit 3, Waterford, Connecticut of activities authori:ed by NRC License No.
CPPR-113 and to the discussions of our findings held by Mr. Mattia with Mr.
Toth and-others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative re~ cords, interviews with personnel, and
observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten
(10) days from the date of this letter of your intention to file a requ;st
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to withhold such information.
Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement
\\
\\(D$
-
I
}
78106300477
p
--
-.
..
.
.
'
. ;
LNortheast' Nuclear. Energy-Company ~
2
L JUN 11 1381.
7
of-the reasons on the basis which-it is claimed.that the information should
be withheld from public-disclosure. This section further requires the
statement to address with specificity the~ considerations listed in 10 CFR
- 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate.part of-the af.fidavit.
If.we do not
hear from you in this regard'within the specified periods noted above, the
report will be placed.in the Public Document Room.
The telephone notification
.of your intent to request withholding, or any request for an extension of
tha 10 day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I~ at (215) .337-5223.
,
No reply to this letter is required; nowever, if you have any questions
concerning this inspection, we will be pleased'to discuss them with you.
,
Sincerely,
.
e
_
-
c_, - ~~~
El o
Brunner, Chief, Projects
g
.
Branch #1, Division of Resident
and Project Inspection
Enclosure: Office of Inspection and Enforcement Inspection
,
Report Number 50-423/31-05
,
i
cc w/ encl.
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Diractor of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R..Himmelwrignt, Licensing Safeguards Engineer
D. G. Otedrick, Manager of Quality Assurance