ML20005A589

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/81-05 on 810408-0501.No Noncompliance Noted
ML20005A589
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/11/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20005A590 List:
References
NUDOCS 8106300479
Download: ML20005A589 (2)


See also: IR 05000423/1981005

Text

-

/

' / p nee

,-

{jo

UNITED STATES

g

E

g

NUCLEAR REGULATORY COMMISSION

8

REGION 1

4

8

a31 PARK AVENUE

,o#

KING QF PRUSSIA, PENNSYLVANIA 19406

'

c....

JUN 111981

,ss.

m/ . _

Occket No. 50-423

/c v ~ . . : e

'

h ,7 [

, h

-

Northeast Nuclear Energy Company

f f,i p

' M _

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

'3

.3

,.

Engineering Operations

(0:

., . f"

3

^-

P. O. Box 270

,

9.5"J # '

Hartford, Connecticut 06101

\\ .-

Gentlemen:

J 9

Subject:

Inspection 81-05

This refers to the routine safety inspection conducted by Mr. J. Mattia of

this office on April 8-30 and May 1,1981 at Millstone Nuclear Power Station

Unit 3, Waterford, Connecticut of activities authori:ed by NRC License No.

CPPR-113 and to the discussions of our findings held by Mr. Mattia with Mr.

Toth and-others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative re~ cords, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a requ;st

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such information.

Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

\\

\\(D$

-

I

}

78106300477

p

--

-.

..

.

.

'

. ;

LNortheast' Nuclear. Energy-Company ~

2

L JUN 11 1381.

7

of-the reasons on the basis which-it is claimed.that the information should

be withheld from public-disclosure. This section further requires the

statement to address with specificity the~ considerations listed in 10 CFR

2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate.part of-the af.fidavit.

If.we do not

hear from you in this regard'within the specified periods noted above, the

report will be placed.in the Public Document Room.

The telephone notification

.of your intent to request withholding, or any request for an extension of

tha 10 day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I~ at (215) .337-5223.

,

No reply to this letter is required; nowever, if you have any questions

concerning this inspection, we will be pleased'to discuss them with you.

,

Sincerely,

.

e

_

-

c_, - ~~~

El o

Brunner, Chief, Projects

g

.

Branch #1, Division of Resident

and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

,

Report Number 50-423/31-05

,

i

cc w/ encl.

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Diractor of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R..Himmelwrignt, Licensing Safeguards Engineer

D. G. Otedrick, Manager of Quality Assurance

i

y

4

1

- .

-

.

s

.. - . . . -

,-

-

.

-

-

-