PNO-TMI-81-012:on 810625,polar Crane Insp Delayed Due to Delays in Opening & Closing of Outer Airlock Door.Caused by Mechanical Failures.Door Locking Mechanism Repaired
ML20005A551
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/25/1981
From: Barrett L, Fasano A, Oneill B, Shanbaky M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), Office of Nuclear Reactor Regulation
To:
References
PNO-TMI-81-012, PNO-TMI-81-12, NUDOCS 8106300448
Download: ML20005A551 (2)


Text

"-

PRELIMINARY NOTIFICATION 50320810625 June 25, 1981 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-TMI61-12 This preliminary notification constitutues EARLY notice of events of POSSIBLE safety or public interest significance.

The infonnation presented is as initially received without verification or evaluation and is basically all that is known by NRC staff on this date.

Facility: Metropolitan Edison Company Three Mile Island, Unit 2 Middletown, Pennsylvania Do m.t Number 50-320

Subject:

POSTPONEMENT OF POLAR CRANE INSPECTION DURING REA'. TOR BUILDING ENTRY On June 25, 1981. onsite NRC staff observed a planned entry (No.12) into the Unit 2 Several t'sks were planned to be perfonned during the entry, reactor building.

a including:

a co Closed circuit TV maintenance h

( b,--

  • \\

b

-i ~

h Installation of lights in enclosed stairwell, 347' elevatio 2N JUN 2 0 GSI * $

Gai-Tronics (in place communications) maintenance p,

,,,,,, y cowsss=4 Radiation survey of elevations 305' and 347' and loose sample /-

- [O, removal Polar crane inspection and survey All tasks were successfully completed with the exception of the polar crane inspection and survey.

The inspection and survey of the polar crane was planned to commence early during the day. However, delays were encountered involving the closure and opening of the outer airlock door. The door locking mechanirn was repaired later in the day, but at that time the Reactor Building Comand Center personnel decided to postpone the polar crane task due to the unforeseen delays.

The polar crane inspection and survey is now planned to be performed on Thursday, July 2, 1981.

The onsite NRC staff will monitor that entry.

The media has been contacted on the airlock door difficulty and the licensee plans to issue a press release. The Commonwealth of Pennsylvania has been infonned.

i l

The NRC does not plan to issue a press release at this time.

This preliminary notification is issued for information only and was i:urrent as of 4:00 p.m. today.

f g/y '

Contact:

B. O'Neill 590-1144 M. Shanbaky 590-11E han

/1 cA as o 590-1123 arrett 590-1120 y

8106300F&

s

y i

l J

a,.-

PNO-TMI 12 (continued) i DISTRIBUTION:

(Facsimile Transmission Times Noted) r IE:TAS MARYLAND NATIONAL Region I (E/W TOWERS)

BANK BLDG Region II W. J. Dircks, ED0 Region III H ST BLDG C. Michelson, AED0 Region IV Chairman Hendrie J. J. Fouchard, PA -

Region V Commissioner Gilinsky N. M. Haller, MPA Commissioner Bradford H. K. Shapar, ELD NSAC Commissioner Ahearne INP0 __

ACRS-AIR RIGHTS BLDG S. J. Chilk, SECY G. W. Kerr, SP (MAIL)

C. C. Kammerer, CA B. J. Snyder, NRR IE:TAS

@ ment M g. Br.

PHILLIPS BLDG WILLSTE BLDG S. Ebbin, NSOC"'~

H.'R.

Dent.on, NRR J. G. Davis, NMSS J. Tourtellotte R. H. Vollmer, NRR R. B. Minogue, RES Asst. Chief Hearine T. E. Murley, NRR Counsel, OELD D. Eisenhut, NRR LANDOW BLDG (rax by HQ)

DOT (Transportation S. H. Hanauer, NRR (6 MIN /PAGE) only)

R. J. Mattson, NRR J. J. Cummings, 01A PRELIMINARY NOTIFICATION 4

l l

j