UNITED STATFS
l'
NUCLEAR REGULATORY COMMISSION
,
g
- e
REGION lli
o
799 ROOSEVELT ROAD
\\ c . . . . e*
GLEN ELLYN, ILLINOu 60137
.JUN 1 6 1981
{'h~
/.Qk
Docket No. 50-373
,9
sp
Decket No. 50-374
-
-
Commonwea1th Edison Company
h
k.~,
h...
g g 31 '" ',
ATTN:
Mr. Cordell Reed
,,
-i
.. *
,
Vice President
, qcf[ *
,
Post Office Box 767
Chicago, IL 60690
3 ',
'
(a . _
,x,
Gentlemen:
/%,/l
This refers to the special safety inspection conducted by Mr. I. T. Yin of
this office on May 4, 1981 at Reactor Controls, Inc., on May 5, 1981 at
Quadrex Corporation, and on May 6, 1981 at General Electric Company, of
activities at La Salle County Station, Units 1 and 2, auchorized by NRC
Construction Permits No. CPPrl-99 and No. CPPR-100 and to the discussion
of our findings with Mr. B. R. Shelton and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or af firmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations. a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
\\
O
e\\
s
8106300@8:
9
E
a
e '
m
Corionwealth Edison Company
-2-
>JUN 1 0 NM
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis thich it is claimed that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the c'onsiderations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-373/81-17 and
No. 50-374/81-11
cc w/ encl:
J. S. Abel, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson
Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
R)II.
RI
I
RI
-
b
2
Y'
lin/db
Dante on
Reimann
Sq
sard
N
IIur
.
6/2/81
(,,lpffl'
c / ;js <
l
i_