ML20005A550
| ML20005A550 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 06/19/1981 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8106300447 | |
| Download: ML20005A550 (2) | |
Text
0
'~E i: ' i E
- -. ~ -
400 Chestnut Street Tower II June lo, 1981
~ j,.
v BLRD-50 438/81-39 SLRD-50 439/81 42 g'y l.h
...- ' 2 9 W3F )~
\\ej",'.-.. "
ss Mr. James.
O'Reilly, Director b
N 'k'/ g Office of In ection and Enforcement
~
U.S. Nuclear R_
11atory Commission Ig, Region II - Suit 3100 101 Marietta Stree.
Atlanta, Georgia 303
Dear Mr. O'Reilly:
3ELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - LOOSE MATERIALS FOUND IN SOLID STATE CONTROL SYSTEM CABINETS - BLRD-50-438/81-30, BLRD-50 434/81 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-OIE, Region II, 7.spector R. V. Crienjak on May 20, 1981 in accordance with 10 CFR 0.55(e) as NCR's 1?62 and 1450 Enclosed is our first interim report.
'fe expect to subisit our next report by Jul r 31, 1981
'de consider 10 CFR Part 21 to be erplicable to this deficiencv.
If you have any questions, please call Dave Lambert at FTS 357-2581 Very truly yours, T'ENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuc, lear Regulation and Safety Enclosure cc:
Mr. Victor Stello, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear 9egulatory Commission
'1ashington, DC 20555 i
i i
l i 1
1 8106 30 0 Y
} }hh n
O ENCLOSURE.
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 LOOSE MATERIALS FOUND IN SOLID-STATE CONTROL SYSTEM CABINETS BLRD-50-438/81-39, BLRD-50-439/81-42 FIRST INTERIM REPORT Description of Deficiency The mounting studs for female connections in Consolidated Controls Corporation (CCC) cabinet (2IX-IS-003-B) worked loose and fell behind the connector piste (nonconformance report 1459).
In.other cabinets, miscellaneous metal material and foreign matter were found behind connector mounting plates (nonconformance report 1362).
Interim Progress The vendo= (CCC) was notified of NCR 1362 and provided a field change procedure (KBB 7136) to eliminate the problems identified. CCC shall provide all materials and labor to accomplish the cleanup of the cabinets.
The vendor (CCC) is being notified of NCR 1459 Inspeccion ';111 be made of all cabinets to ascertain the extent of such problems, and a locking compound will be placed on the mounting nuts and the studs tightened or replaced.
TVA will m'onitor the vendor's quality assurance program closely.