Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345A470 + (ML19345A470)
- ML19345A471 + (ML19345A471)
- ML19345A473 + (ML19345A473)
- ML19345A474 + (ML19345A474)
- ML19345A476 + (ML19345A476)
- ML19345A478 + (ML19345A478)
- ML19345A479 + (ML19345A479)
- ML19345A480 + (ML19345A480)
- ML19345A481 + (ML19345A481)
- ML19345A482 + (ML19345A482)
- ML19345A483 + (ML19345A483)
- ML19345A485 + (ML19345A485)
- 05000029/LER-1976-005-30, /030-1:on 760520,weld on Inlet to Charging Pump 3 Relief Valve Found Leaking.Caused by Error in Installation of Pipe in Which Full 1/16 Inch Pullback Not Allowed + (ML19345A488)
- 05000029/LER-1976-002, Forwards LER 76-002/03L-0 + (ML19345A489)
- 05000029/LER-1976-002-03, /03L-0:on 760210,auxiliary Operator Noted Leak in Weld on Reducer Discharge Header of Charging Pump 3.Caused by Vibration Induced Fatigue Failure,Due to Continuous Operation of Displacement Charging Pump + (ML19345A491)
- ML19345A492 + (ML19345A492)
- ML19345A493 + (ML19345A493)
- ML19345A494 + (ML19345A494)
- ML19345A497 + (ML19345A497)
- ML19345A498 + (ML19345A498)
- ML19345A499 + (ML19345A499)
- ML19345A501 + (ML19345A501)
- ML19345A502 + (ML19345A502)
- ML19345A504 + (ML19345A504)
- ML19345A505 + (ML19345A505)
- ML19345A506 + (ML19345A506)
- ML19345A508 + (ML19345A508)
- ML19345A509 + (ML19345A509)
- ML19345A510 + (ML19345A510)
- ML19345A512 + (ML19345A512)
- ML19345A513 + (ML19345A513)
- ML19345A515 + (ML19345A515)
- ML19345A516 + (ML19345A516)
- ML19345A518 + (ML19345A518)
- ML19345A519 + (ML19345A519)
- ML19345A521 + (ML19345A521)
- ML19345A523 + (ML19345A523)
- ML19345A524 + (ML19345A524)
- ML19345A525 + (ML19345A525)
- ML19345A526 + (ML19345A526)
- ML19345A527 + (ML19345A527)
- ML19345A529 + (ML19345A529)
- ML19345A530 + (ML19345A530)
- 05000029/LER-1977-022, Forwards LER 77-022/03L-0 + (ML19345A531)
- 05000029/LER-1977-022-03, /03L-0:on 770421,steam Generator Chloride Concentration Increased to Max Level of 0.8 Ppm in All Four Steam Generators,Exceeding Tech Specs Limits.Caused by Chloride Entering Steam Generator in Feedwater Areas + (ML19345A535)
- ML19345A536 + (ML19345A536)
- 05000029/LER-1977-015-03, /03L-0:on 770311,reading of built-in Source Check of Main Coolant Leak Detection Vapor Container Air Particulate Monitor Found Indicating Low & Declared Inoperative.Caused by High Voltage & Control Drift + (ML19345A537)
- ML19345A539 + (ML19345A539)
- 05000029/LER-1977-017, Forwards LER 77-017/03L-0 + (ML19345A541)
- ML19345A543 + (ML19345A543)
- 05000029/LER-1977-017-03, /03L-0:on 770324,following Plant Trip,Chlorides in Steam Generator 4 Exceeded Tech Specs Limits.Caused by Impurities Released in Bulk Water + (ML19345A544)