Amend 38 to License DPR-3,deleting Provision for Visual Insp of Accessible Portions of RCS from RCS Surveillance Requirements
ML19345A478
Person / Time
Site: Yankee Rowe
Issue date: 05/03/1977
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19345A475 List:
References
NUDOCS 8011210703
Download: ML19345A478 (4)


Text

.

f

'9 g

UNITED STATES I'

  1. v 9't i4UCLEAR REGULATORY COMMisslON g g( ) M j WASHING ton, D. C. 20555 v

_e YANKEE ATOMIC ELECTRIC COMPANY DOCKET NO. 50-29 YANKEE NUCLEAR POWER STATION (YANKEE-ROWE)

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

License No. DPR-3 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Yankee Atomic Electric Company (the licensee) dated December 9,1976, complies with the standards and requirements of the Atomic Energy Act of 1954, as amanded (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

0011210

}

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.

DPR-3 is hereby amended to read as follows:

"(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment tio. 38, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective as of the date of its issuance.

FOR THE "U: LEAR REGULATORY COMMISSIO"

/

/

<,p-f,f,;t< :lSi -- --

A. Schwencer, Chief Operating Reacters Branch #1 Division of Operating Reactors Attachrent:

Changes tc the Technical Specifications Date of Issuance:

May 3, 1977

=-

1 4

i i

1.

4 J.

ATTACHMENT TO LICENSE AMENDMENT NO.

FACILITY LICENSE N0. DPR-3 DOCKET NO. 50-29 4

Revise Appendix A as follows:

Replace page 3/4 4-11 with attached revised page.

rs u

i 4

i r

l-i t

h r

l-a m.

MAIN COOLANT SYSTEM LIMITING CON'DITION FOR OPERATION (Continued) 2.

> 45 CPS, be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

e.

With more than two leaking incore detection system thimbles which are valved off but not plugged when in MODE 1, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and-in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.5.2 Main Coolant System leakages shall be demonstrated to be-within each of the above limits by; a.

Monitoring the containment atmosphere particulate radioactiv-ity monitor at least onde per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except when a Main Coolant System water inventory has not been performed within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, then monitor the containment atmosphere particulate radioactivity monitor at least once per hour.

b.

Monitoring the contair. ment drain tank monitoring system at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

Performance of a Main Coolant System water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during steady state. operation, and d.

Monitoring the reactor head flange leakoff system at least once-per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

YANKEE-ROWE 3/4 4-11

.