i 11 h
..')pos:d Ch:nge tio.117 i
applem2nt No. 6 tf
-.. ~ _
Telephone 6l7 366-90ll
---N v M.
[i)]}{,] F { ]
.g 7, rwx
/ \\/,.,,
710 390 0739 y-
~~~*" ~~ ~
TT WYR 75-139 1
YANKEE MOMIC ELECTRIC COMPANY l
- P-
}
Ya &
20 Turnpike Road Westborough, Massachusetts 01581 g.
mxus
~
c A.
%I November 26, 1975
, /~
' O \\,
fj-
!cf's,
\\(.\\
- ll-!b y
., j,1 t 3 1
A j 'O,,NQ!
u v;/
l f
United States Nuclear Regulatory Commission
(
% j "8 9
\\[.
Washington, D. C.
20555 1
Attention: Office of Nuclear Reactor Regulation
'q e,
N,.f.
1,.,
y
}-
Robert A. Purple, Chief
.' X Lperating Reactors Branch No. 1
'T References (1)
License No. DPR-3 (Docket No. 50-29) g*,y s
(2)
Proposed Change No. 117, Supplement No. 3,
![
- p submitted to DOL /NRC July 9, 1975.
G
.[y
.q (3)
Letter from R. A. Purple DOL /NRC to Yankee Atomic 4
' f{
lQ; Electric Company, Attention:
G. C. Andognini,
,A he/
.e
~
'l April 16, 1975.
.92 j
(4)
Proposed Change No. 117, Supplement No. 5, E
N
(
submitted to DOL /NRC November 24, 1975
. _.,Q /
\\
t
,s
/
'O/
Subject:
Single Failure Analysis l
l
Dear Sir:
This supplement modifies Proposed Change No. 117, Supplement No. 5 l
in response to the requirements of Branch Technical Position EICSB-18.
1.
Paragraph No.1(1)a. of Supplement No. 5 is changed to read as follows:
(1)
Electrical valve and equipment failures which result in 3
adverse ECCS capability are listed below in accordance g
with the corrective actions proposed.
A Operating procedures shall be changed to require that j
a.
the circuit breakers to the following motor operated
]
valves be removed with the valve placed in the specified i
position.
- )
j Valve f
Valve No.
Function Position SI-MOV-1 Accumulator Outlet Open 1
SI-MOV-22 SI Branch to Loop No. 1 Open
',I SI-MOV-23 SI Branch to Loop No. 2 Open SI-MOV-24 SI Branch to Loop No. 3 Open CD i
sonm 7R P
Q'
{A y.
p W
{t a
l f
United States Nuclear Regulatory Commission November 26, 1975
' Attn: Office of Nuclear Reactor Regulation Page Two Valve Valve No.
Function Position SI-MOV-25 SI Branch to Loop No. 4 Open SI-MOV-4 X-over LPSI to HPSI Open SI-MOV-46 HPSI Throttle Open SI-MOV-49 HPSI Recirculation Open
- CS-MOV-532 LPSI Recirculation Closed 2.
The enclosed attachment modifies Section D.2.e(5) of the technical specifications.
The physical modifications described above will be reviewed and implemented in accordance with approved Yankee Atomic Electric Company Quality Assurance procedures.
This Proposed Change has been reviewed by the Nuclear Safety Audit and Review Committee.
We trust thic information meets with your approval; however, should you desire additional information, feel free to contact us.
- Breaker may be replaced and valve opened for recirculating SI tank following make up (administrative control), for a maximum of 60 minutes.
SIAS over-rides and closes valve.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY l
b.t.V D. E. Vandenburgh Vice President COMMONWEALTH OF MASSACHUSETTS)
)ss.
COUNTY OF WORCESTER
)
Then personally appeared before me, D. E. Vandenburgh, who being duly sworn, did state that he is a Vice President of Yankee Atomic Electric Conpany, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Yankee Atomic Electric Company, and that the state-ments therein are true to the best of his knowledge and belief.
/
Armand R. Soucy Notary Public My Commission Expires September 9, 1977 l
g y.
(2)
The reactor shall be scrammed automatically, cbove 15 MW electric when the generator is tripped for any reason. The
[i 0/
generator shall be protected by all usual protective trips N
including overcurrent, differential and loss of field.
N g
(3)
Automatic initiation of the safety injection system, pumps and Che valves, shall be set to operate at a main coolant pressure not 97 y
less than 1700 psig or a containment pressure not greater than 115
}
5 psig.
A (4)
The minimum nitrogen overpressure on the. Low Pressure Safety Cha Injection Accumulator'shall be 410 psig.
97 (5)
"The Safety Injection System which includes the Charging Pumps
- t shall be maintained in readiness to inject borated water into i
the reactor at all times when the main coolant pressure is j
1,000 psig or higher. Charging system readiness requires that two fixed speed pumps be available.
Since the pumps are high g
maintenance items, a fixed speed charging pump may be out of q
service for eight hours before a pressure reduction to less than j
1000 psig is required."
The following manually-controlled, electri,cally operated valves should
')
Cha:
be in the position indicated during normal power operation.
117 i
Valve No.
" Normal Position PU-MOV-541 Open 3
PU-MOV-542 Open a
PU-MOV-543 closed PU-MOV-544 Closed PU-MOV-545 Open PU-MOV-546 Open a
PU-MOV-547 Closed PU-MOV-548 Closed The following manually-controlled, electrically-cperated valves shall have power disconnected (both series breakers in open position) to meet single failure requirements during normal power operation.
Valve No.
Position CH-MCV-522 Closed CH-MOV-523 Open CH-MO7-524 Open I
?
(6)
The reactor shall be scram.ed automatically, when the power level Chan; is above 15 MWe, by two or more low steam generator level signals.
97 (7)
The. boiler feed pumps shall be automatically tripped out of service, above 15 MW electric, by any reactor scram.
(8) Valves in all outgoing lines from the vapor container shall close automatically if at any time vapor container pressure increases
)
above 5 psig.
}
(9) The integrity of the vapor container shall be maintained at all I
times when the reactor is critical or when the main coolant system is above 200 r or above 300 psig with the reactor core in place.
M.z 5dihEJMkic6CID GAmni: =
~ - - - - -
= = - - -
?.
o-o Y
NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL i
- (TEMPORARY FORM)
CONTROL NO: / 3 M M-FILE:
FROM: Yankee A omic Elec Co
' DATE OF DOC DATE REC'D LTR TWX RPT OTHER
^
Westborough, Mass n v vemdenburch 11-26-75 11-28-75 XXXX ORIG CC OTHER.
SENTIMC PDR YY TO:
XX 3 signed SENT LOCAL PDR I
NRC CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXXXXXXXXX 1
5 0 -253 ENCLOSURES:
DESCRIPTION:
Ltr re tech specs change #117 dtd 7-14-74.....
Suppl ~#b to tech Specs change #117/.........
furnishing addl info concerning ECCS' analysis trans the following:.
,.. _, a
~~.
...........(40 cys encl rec'd)
- . +- " =
~g 'j; 'iy
~~
t
, ; a :., w -
PLANT NAME: Yankee Rowe FOR ACTION /lNFORMATION 11-28-75 ehf BUTLER (L)
SCHWENCER (L) ZIEM ANN (L)
REG AN (E)
REID(L)
W/ Copics W/ Copies W/ Copies W/ Copies W/ COPIES CLARK (L)
STOLZ (L)
DICKER (E)
LE AR (L)
W/ Copies Wi Copies W/ Copies W/ Copics PAR R lL)
VASSALLO (L)
KNiGHTON (E)
SPIES W/ Copies W/ Copics' W/ Copies -
W/ Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD (E) trn i
W/ Copics
/ W/[ Copies W/ Copics W/ Gopies i
INTERNAL DISTRIBUTION (REG FM TECH REVIEW _
DENTON LIC ASST A/T IND.
f wrw rDR SCHROEDER GRIMES R. OlGGS (L)
BRAITMAN i
OGC. ROOM P 506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN f GOSSICK/ST AF F KNIGHT KASTNER E'. GOULBOURNE (L)
ME LTZ 7
i CASE PAWLICKl BALLARD P. KREUTZER (El q
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS 3
BOYD pSTELLO M.RIDHBR00E(L)
MCDONALD MOORE (L)
HOUSTON ENVIRO S. REED (El CHAPMAN H
DEYOUNG (L)
NOVAK MULLER-M. SERVICE (L)
DUBE (Ltr)
I DICKER pS. SHEPPARD (L)
E. COUPE 1
SKOVHOLT (L) f0SS(3)
GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLAT?R (E)
PETERSON 1.
P. CO LLINS
'TEDESCO
.YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L)
KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
/ FILE & REGION (2)
BENAROYA V. WILSON (L)
WlGGINTON i
HIPC VOLLMER H AR' ESS R. INGR ' M (L) a H. DUNCAN (a 1
EXTEi4NAL DISTRIBUTION f
TIC (ABERNATHY)LOCALPDR[or W~~ dee./dl M45s' 1 - PD R. SAN /LA/NY 1
l (1)(2)(10 N ATION AL LABS 1 - BROOKHAVEN NAT LAB f-
/ - NSIC (BUCHANAN) 1 - W. FENNINGTON, Rm E 201 GT 1
1 - G. ULRIKSON ORNL 1 - CONSULTANTS 1 - ASLB 1 - Newton Anderson NEWM ARK /B LUME/AG BABI AN' l
j
/ y;:g-
/ -[ACRS un'3'NG/SENT j
O C.. A S
i y
_sjp p
~
_