Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325F263 + (ML19325F263)
- ML19325F264 + (ML19325F264)
- 05000423/LER-1989-024, :on 891010,inconclusive Test Results for MSIV C Obtained During Quarterly MSIV Partial Stroke Surveillance. Caused by Inadequate Procedural Guidance for Identifying Correct Acceptance Criteria + (ML19325F265)
- ML19325F267 + (ML19325F267)
- ML19325F268 + (ML19325F268)
- ML19325F269 + (ML19325F269)
- ML19325F270 + (ML19325F270)
- ML19325F271 + (ML19325F271)
- ML19325F272 + (ML19325F272)
- ML19325F273 + (ML19325F273)
- ML19325F274 + (ML19325F274)
- BECO-89-166, Responds to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Util Installed H2/02 Analyzers Procured in 1980 & Therefore Exempt from Bulletin Requirements + (ML19325F275)
- ML19325F276 + (ML19325F276)
- ML19325F277 + (ML19325F277)
- ML19325F278 + (ML19325F278)
- 05000333/LER-1989-007, :on 890509,surveillance of Fire Barrier Penetrations,Per Tech Spec 4.12.F Not Conducted within Allowed Time Period.Caused by Misinterpretation of Fire Protection Ref Manual.Fire Watch Established + (ML19325F279)
- U-601555, Monthly Operating Rept for Oct 1989 for Clinton Power Station Unit 1 + (ML19325F280)
- ML19325F281 + (ML19325F281)
- ML19325F283 + (ML19325F283)
- ML19325F284 + (ML19325F284)
- ML19325F286 + (ML19325F286)
- ML19325F287 + (ML19325F287)
- AECM-89-0186, Forwards Executed Amend 3 to Indemnity Agreement B-72 + (ML19325F288)
- ML19325F289 + (ML19325F289)
- ML19325F290 + (ML19325F290)
- ML19325F291 + (ML19325F291)
- 05000311/LER-1989-016-02, :on 891014,three of Four MSIVs Failed to Close within 5 & Declared Inoperable.Cause Not Determined. Hydraulic Sys for Each Valve Drained,Refilled W/Fresh Oil & Properly Vented + (ML19325F294)
- ML19325F300 + (ML19325F300)
- ST-HL-AE-3263, Responds to NRC Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Contingency Procedures Developed Using Listed Approaches,Including Safe Standoff Distances for Vital Equipment (Ref NUREG/CR-52 + (ML19325F301)
- ML19325F302 + (ML19325F302)
- ML19325F304 + (ML19325F304)
- IR 05000297/1989004 + (ML19325F308)
- ML19325F318 + (ML19325F318)
- ML19325F323 + (ML19325F323)
- ML19325F326 + (ML19325F326)
- ML19325F329 + (ML19325F329)
- 05000443/LER-1989-012, :on 891011,one of Two Suction Valves on RHR Train a Pump Closed,Causing Loss of All RHR Cooling Capability.Caused by Procedure Inadequacies.Procedure Revised to Specify Sequence of Restoration + (ML19325F330)
- ML19325F331 + (ML19325F331)
- IR 05000369/1989032 + (ML19325F333)
- ML19325F335 + (ML19325F335)
- ML19325F336 + (ML19325F336)
- 05000302/LER-1989-033, :on 890908,second Level Undervoltage Relay Sys Setpoint for Engineered Safeguards Buses Not Conservative & Led to Operation Outside Plant Design Basis.Caused by Personnel Error.Setpoint Changed + (ML19325F337)
- BVY-89-106, Application for Amend to License DPR-28,consisting of Proposed Tech Spec Change Request 153,adding to Tech Spec Section 3.5.A.4 Limiting Conditions for Operation & Surveillance Requirements Re Uninterruptible Power Supply + (ML19325F339)
- ML19325F340 + (ML19325F340)
- 05000373/LER-1989-024-01, :on 891013 & 30,unsealed Openings in Main Control Room Floor & Main Control Room West Wall Discovered. Caused by Wide Gap Between Structural Beam & Cable Tray. Openings Sealed & Fire Watch Established + (ML19325F341)
- ML19325F342 + (ML19325F342)
- ML19325F343 + (ML19325F343)
- 05000341/LER-1989-027, :on 891015,reactor Bldg Hvac,Control Ctr HVAC & Drywell Floor & Equipment Drain Sumps Isolated & Standby Gas Treatment Sys & Noninterrruptalbe Control Air Compressors Started.Caused by Personnel Error + (ML19325F344)
- ML19325F345 + (ML19325F345)
- ML19325F346 + (ML19325F346)
- ML19325F347 + (ML19325F347)