Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318C010 + (ML19318C010)
- ML19318C011 + (ML19318C011)
- ML19318C012 + (ML19318C012)
- ML19318C013 + (ML19318C013)
- ML19318C014 + (ML19318C014)
- ML19318C015 + (ML19318C015)
- ML19318C016 + (ML19318C016)
- ML19318C017 + (ML19318C017)
- ML19318C018 + (ML19318C018)
- ML19318C019 + (ML19318C019)
- ML19318C020 + (ML19318C020)
- ML19318C021 + (ML19318C021)
- ML19318C022 + (ML19318C022)
- ML19318C024 + (ML19318C024)
- ML19318C026 + (ML19318C026)
- ML19318C027 + (ML19318C027)
- ML19318C030 + (ML19318C030)
- ML19318C031 + (ML19318C031)
- ML19318C032 + (ML19318C032)
- ML19318C033 + (ML19318C033)
- ML19318C034 + (ML19318C034)
- ML19318C035 + (ML19318C035)
- B10020, Updates Schedule,Previously Submitted 790518,for Implementing Mark I Containment long-term Program Mods + (ML19318C037)
- 05000285/LER-1980-010, Forwards LER 80-010/01T-0 + (ML19318C039)
- ML19318C040 + (ML19318C040)
- ML19318C041 + (ML19318C041)
- 05000289/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19318C042)
- ML19318C043 + (ML19318C043)
- 05000219/LER-1980-023, Forwards LER 80-023/03L-0 + (ML19318C044)
- ML19318C045 + (ML19318C045)
- ML19318C049 + (ML19318C049)
- 05000285/LER-1980-010-01, /01T-0:on 800516,during Cold Pressure Test,Leakage Discovered at Gasket Joint Between Pump Casing & Pump Cover on Reactor Coolant Pumps RC-3A,3B & 3C.Closure Studs Corroded by Boric Acid.Leaks Caused by Deteriorated Gaskets + (ML19318C050)
- 05000219/LER-1980-010-03, /03L-1:on 790417,excavation Was Started to Repair Leak Near Inside Penetration within Pipe Tunnel.Activity Was Detected in Soil Near Dedt Line.Dedt Line Rerouted on 800316.Line Will Be Repaired + (ML19318C052)
- 05000289/LER-1980-009-03, /03L-0:on 800607,reactor Bldg Tendon Surveillance Late Date Was Exceeded.Caused by Problems W/Availability of Contractor Equipment.Surveillance Continuing + (ML19318C053)
- 05000219/LER-1980-023-03, /03L-0:on 800523,prior to Inservice Insp Reactor Vessel Hydro,Testing Revealed That Electromatic Relief Valve High Pressure Sensor IA83B Exceeded Tech Spec Setpoint. on 800531,sensor IA83F Found to Exceed Setpoint + (ML19318C054)
- ML19318C055 + (ML19318C055)
- 05000344/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19318C056)
- ML19318C058 + (ML19318C058)
- ML19318C059 + (ML19318C059)
- 05000344/LER-1980-009-03, /03L-0:on 800522,following Refueling,Spent Fuel Pool Was Partially Drained While Draining Refueling Cavity. Caused by Personnel Error.Personnel Have Been Reinstructed & Procedure Changed + (ML19318C060)
- ML19318C062 + (ML19318C062)
- ML19318C063 + (ML19318C063)
- ML19318C064 + (ML19318C064)
- ML19318C067 + (ML19318C067)
- ML19318C068 + (ML19318C068)
- ML19318C069 + (ML19318C069)
- ML19318C070 + (ML19318C070)
- ML19318C071 + (ML19318C071)
- ML19318C072 + (ML19318C072)
- ML19318C073 + (ML19318C073)
- 05000327/LER-1980-077, Forwards LER 80-077/03L-0 + (ML19318C074)