Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318A887 + (ML19318A887)
- ML19318A888 + (ML19318A888)
- ML19318A889 + (ML19318A889)
- ML19318A890 + (ML19318A890)
- ML19318A891 + (ML19318A891)
- ML19318A892 + (ML19318A892)
- ML19318A894 + (ML19318A894)
- ML19318A895 + (ML19318A895)
- ML19318A896 + (ML19318A896)
- ML19318A897 + (ML19318A897)
- ML19318A898 + (ML19318A898)
- ML19318A899 + (ML19318A899)
- ML19318A900 + (ML19318A900)
- ML19318A901 + (ML19318A901)
- ML19318A902 + (ML19318A902)
- ML19318A903 + (ML19318A903)
- ML19318A904 + (ML19318A904)
- 05000327/LER-1980-075, Forwards LER 80-075/01T-0 + (ML19318A905)
- ML19318A906 + (ML19318A906)
- ML19318A907 + (ML19318A907)
- ML19318A908 + (ML19318A908)
- ML19318A909 + (ML19318A909)
- 05000327/LER-1980-075-01, /01T-0:on 800524,auxiliary Essential Raw Cooling Pump B-B Failed During Surveillance Testing.Caused by Personnel Error in Calculating Pump Differential Pressure. Instrumentation Recalibr & Pump Retested + (ML19318A910)
- ML19318A911 + (ML19318A911)
- 05000327/LER-1980-074, Forwards LER 80-074/03L-0 + (ML19318A912)
- ML19318A913 + (ML19318A913)
- 05000348/LER-1980-034-03, /03L-0:on 800519,diesel Generator 1C Was Declared Inoperable When Generator Failed to Reach Rated Speed within Time Specified by Tech Spec.Probably Caused by Leaky Check Valve in Fuel Oil Sys.Valve Replaced + (ML19318A914)
- 05000348/LER-1980-035-03, /03L-0:on 800519,diesel Generator 2C Would Not auto-start & Was Declared Inoperable.Caused by Switch Being Inadvertently Placed in Run Position Rather than Auto Position.Switch Placed in Auto + (ML19318A915)
- ML19318A916 + (ML19318A916)
- 05000327/LER-1980-074-03, /03L-0:on 800521,voltage & Frequency Failed to Stabilize While Performing Surveillance Test on Diesel Generator 1B-B.Cause Unknown.Diesel Allowed to Cool Down for 1-h & Voltage & Frequency Stabilized + (ML19318A918)
- ML19318A919 + (ML19318A919)
- ML19318A920 + (ML19318A920)
- 05000245/LER-1980-007, Forwards LER 80-007/03L-0 + (ML19318A922)
- ML19318A925 + (ML19318A925)
- ML19318A926 + (ML19318A926)
- 05000245/LER-1980-007-03, /03L-0:on 800516,discovered That Semiannual Functional Test of Cable Vault Smoke Detection Sys Had Been Overlooked.Caused by Test Not Being Listed on Unit Surveillance Schedule.Verification of Schedules Performed + (ML19318A928)
- ML19318A929 + (ML19318A929)
- 05000327/LER-1980-045, Supplemental LER 80-045/01T-1:on 800509,gate Between Spent Fuel Pool & Cask Loading Area Found Not to Be Designed or Constructed to Category 1 Requirements.Caused by Overlooking Loading Effects in Seismic Analysis + (ML19318A930)
- ML19318A931 + (ML19318A931)
- ML19318A932 + (ML19318A932)
- ML19318A933 + (ML19318A933)
- ML19318A934 + (ML19318A934)
- ML19318A935 + (ML19318A935)
- 05000327/LER-1980-061, Forwards LER 80-061/03L-0 + (ML19318A936)
- ML19318A937 + (ML19318A937)
- ML19318A938 + (ML19318A938)
- 05000327/LER-1980-072, Forwards LER 80-072/03L-0 + (ML19318A939)
- ML19318A940 + (ML19318A940)
- ML19318A941 + (ML19318A941)
- ML19318A942 + (ML19318A942)
- ML19318A943 + (ML19318A943)