ML19318A935
| ML19318A935 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/20/1980 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| RJL-46-80, NUDOCS 8006240409 | |
| Download: ML19318A935 (1) | |
Text
.
.-O%
enn!msrs s
1 3. w, y!...,,
bii James W cook 1
. +.
- 1. 5 }
Vsce hesdent, Wiland hoyce
- y' L%2-General of fices: 1945 West Parnall Road, Jackson, %chigan 49201 + (517) 788-0640 June 20, 1980 RJL h6-80
?'r Albert Schwencer, Acting Chief Licensing Branch 3 Division of Licensing US Nuclear Regulatory Commission
'4ashington, DC 20555 MIDLAIID PLANT U'iITS 1 AND 2 DOCKET NUM3ERS 50-329/330 COST AND SCHEDULE REVISIONS FILE: 0505.5 UFI: 70*0l*03 SERIAL:
9065 Consumers Power Company has developed a tentative timetable for the submittal of cost and construction schedule revisions related to the Midland Plant Units 1 and 2.
Following the anticipated adoption of a revised construction schedule by the Company's Board of Directors during early July, 1980, the Company vill prepare the associated cost estimates for the Midland Plant.
The scope of these estimates vill involve the complete project as currently envisioned including applicable design changes required by the NRC Task Action Plan. Both the revised cost and the revised schedule infomation vill be incor-porated into Revision 11 of the Environmental Report and submitted to the NRC by September 15, 1980.
J'4C/jm tool s
ik 800824o p f