Text
,
THE CLEV'1 AND ELECTR!C li i d ld l >! 6 i ! ".
U.' FAN P O. Box 5000 e CLEVELANo, oHC 44101 e TELEPHONE (216) 622 9800 e ILLUM6NATING BLDG.
o SS PUBLICSoVA4 E
U
- "U Dalwyn R. Davidson VICE PRESIDENT Systiu ENGINEERING AND CONSTRUCflON June 18, 1980 U. S. Nuclear Regulatory Co=nission Director of Reactor Construction Inspection, 0.I.E.
Washington, D.C. 20555 Re:
Perry Nuclear Power Plant Docket Nos. 50 440; 50-441 Construction Permits Nos. CPPR-148; CPFR-149 IE Bulletin No. 80-09 Gentlemen:
The following information is supplied in response to IE Eulletin No. 80-09 which addresses Hydramotor Actuator deficiencies.
A survey of the vendors supplying valve actuators to the Perry Nuclear Power Plant indicated that only Powers Regulator Co. is supplying ITT General Controls Model NH-90 Series Hydremotor Actuators. No Model AH-90 are being supplied to Perry.
ITT-GC has confirmed that the Powers Regulator Co. purchase order for Perry is not affected by the deficiencies noted in the IE Bulletin. Furthermore, ITT-GC has supplied Powers Regulator Co. with updated test data which shows ample spring force for the Perry damper operators.
If you require additional information, please let me know.
Very tru3y yours,
') (,
/
4.'5h > f, k/ t1,{ ft(
Dalwyn h. Davidson Vice President System Engineering and Construction DRD/cmw
, cc:
Mr. James G. Keppler, Director h
Region III Office of Inspection and Enforcement 799 Roosevelt Road
/
Glen Ellyn, Illinois 60137
- /O U. S. Nuclear 'egulatory Commission c/o Document Management Branch Washington, D.C. 20555 800624 037%