- - _ _ _ _ _ _ - _ _ _ _ _ _ _ _
+
9 E
a E James W. Durnam
.=
_.. Portland Genem! Electric Company v1ce P es ce,t a,0 Gere a Co nse Lega Decar: ment Senier Ass:stan:Gerera'Cc nse; AMn A!erancersen e
June 18, 1980 warren Hastings Ass >stant General Counse a
sc Marshall E. !! iller, Esq., Chairman Atomic Safety and Licensing Board Da!!as A. MarcKx U. S. Nuclear Regulatory Commission 5:even F. McCarre!
Washington, D. C.
20555 Dr. Kenneth A. !!cCollos, Dean Division of Engineering, Architecture & Technology Oklahoma State University Stillwater, OK 74074 Dr. Hugh C. Paxton 1229 41st Street Lca Alamos, NM 67544 Gentlemen:
Attached to this letter is a list of Requests for Design Changes (?,DCs) associated with the modification program described in the Report on Design Modifications for the Trojan Control Building (PGE-1020). These items are modifications involving piping supports necessary to qualify piping systems for response spectra developed in accordance with PGE-1020, Appendix B.
The items on this list will not individually or collectively with other modifi-cations reduce the shear capacity of any major shear wall by greater than percent. Nor do the items involve weight additions which may result in an increase of greater than 1 percent of the calculated lateral forces in any major shear wall.
The Licensee will continue to keep the Board informed of activities'at Trojan' as described at the March 30, 1979 Prehearing Conference (Tr. 3204-05).
~
Sincerely, A
m Steven F. McCarrel Assistant General Counsel Attachment c:
lir. R. H. Engelken, Director U.'S. Nuclear Regulatory Commission Region V
\\
s
!!r. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing 1300 Willamette Center 8 0 0 6 2 4 030
<121 S.W. Salmon Street, Portland, Oregon 97204 s03> 220 3000
~
ATTACHMENT Fdllowing is the list of Request for Design Change (RDC) work items for which field work may be performed within the next few weeks.
The relationship of the work with the Control, Auxiliary and Fuel Building structures is briefly summarized below:
RDC No.
Modification Relationship 79-028 Job Nos. 177 & 178: Two These restraints are attached existing seismic restraints to floor steel in the Fuel on 4 in, lines in the Service Building at elevation 58'.
Water System are being strengthened. HFD-8-2 (SR235 & SR236) i Job No.199: A gusset is This anchor is attached to being acced to a seismic floor steel at elevation 90' anchor on a 4 in, line in the in the Fuel Building.
Chemical and Volume Control System. CS-151R-12-2 (SA16)
Job No. 202: A restraint on This support is floor mounted a 10" line in the Spent Fuel at elevation 45' in the Auxil-Pool Cooling System is being iary Building facade area.
replaced with a snubber.
HCC-48-2 (SS305)
Job Nos. 109, & 110:
This frame is floor mounted These restraints are being at elevation 45' in the Auxi-attached to a common frame.
liary Building facade area They are connected to a 4 in, with a connection to the Spent line in the Boron Injection Fuel Pool wall.
System. SI-2501R-3-3 (SR46, SR48, & SR50)
Job No. 53n: A seismic This anchor is being welded to anchor is being attached to another pipe support which is a 1-1/2" line in the Service floor mounted at elevation 77' Water-System. JBD-31-67 in the Control Building.
(SA312) 4 '
Job Nos. 123, 124, & 125:
These anchors are attached to Seismic anchors on iden-a 44" masonry shear wall at tical 3-in diameter-lines elevation 78' in the Auxiliary in the Spent Resin System Building. Weight addition for are being added. HCC-27-1 each anchor is about 20 lbs.
(SA300,SA301,SA302)
I RDC No.
Modification Relationship 79-028 Job No 96: A seismic rs This restraint is floor mounted straint on a 4 in. line in at elevation 77' in the Fuel the Chemical and Volume Con-
- Building, trol System is being modified.
-CS-151R-12-2 (SR 157)
Job No. 58 (Rev.1): A The restraint is being welded seismic restraint-on a 4 in.
to the floor support steel at diameter line in the Chemical elevation 69' in the Auxiliary and Volume Control System is Building.
being modified. CS-151R-6-1 (S5502)
WLP/rc/31mn55.58A1 6
1 e
b e
v.,v, s
4 UNITED STATES OF N! ERICA NUCLEAR REGULATORY C0:211SSION BEFORE THE AT0!!IC SAFETY AND LICENSING BOARD In the Matter of
)
Docket 50-344 PORTLAND GENERAL ELECTRIC C0!!PANY,
)
et a1
)
(Control Building Proceeding)
)
(Trojan Nuclear Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on June 18, 1980, Licensee's letter, dated June 18, 1980 with a list of Requests for Design Changes, has been served upon the persons liste'd below by depositing copies thereof in the United States mail with proper postage affixed for first class mail.
e tiarshall E. !! iller, Esq., Chairman Atomic Safety and Licensing Appeal Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Dr. Kenneth A. McCollom, Dean Dock'eting and Service Section (3)
Division of Engineering, Office of the Secretary Architecture and Technology U. S.-Nuclear Regulatory Commission Oklahoma State University Washington, D. C.
20555 Stillwater, Oklahoma 74074 Joseph R. Gray, Esq.
Dr. Hugh C. Paxton Counsel for NRC Staff 1229 - 41st Street U. S. Nuclear Regulatory Commission Los Alamos, New Mexico 87544 Washington, D. C.
20555 Atomic Safety and Licensing Board Lowenstein, Newman, Reis, Axelrad & Toll
~
Panel 1025 Connecticut Ave., N. W.
U. S. Nuclear Regulatory Commission Suite 1214 Washington, D. C.
20555 Washington, D. C.
20036 s
A ww
CERTIFICATE OF SERVICE Frank W. Ostrander, Jr., Esq.
11r. David B. !!cCoy
. Richard M. Sandvik,-Esq.
348 Hussey Lane Assistant Attorney General Grants Pass, Oregon 97526 State of. Oregon Department of Justice lis. C. Gail Parson
-500 Pacific Building' P. O. Box 2992 520 S. W. Yamhill Kodiak, Alaska 99615 Portland, Oregon 97204 Mr. Eugene Rosolie William Kinsey, Esq.
Coalition for Safe Power
'Bonneville Power Administration 215 S. E. 9th Avenue P.^0. Box 3621 Portland, Oregon 97214 Portland, Oregon 97208 Columbia County Courthouse
!!s. Nina Bell Law Library 728 S. E. 26th Avenue Circuit Court Room Portland, Oregon 97214 St. Helens, Oregon 97051
!!r. John A. Kullbert 15523 S. E. River Forest Drive Portland,. Oregon 97222 1
et Steven F. McCarrel Assistant General Counsel Portland General Electric Company Dated: ' June 18, 1980'
.jed6A16
-