Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1980-013-03, /03L-0:on 800124,during Refueling Operations,Time Delay Relay 2E-K 34 of Automatic Depressurization Sys Timed Out at 93-s.Caused by Random Mechanical Failure.Relay, Agastat Model 7012SE Replaced & Set within Tolerance + (ML19296C543)
- ML19296C544 + (ML19296C544)
- 05000259/LER-1980-006, Forwards LER 80-006/03L-0 + (ML19296C545)
- ML19296C546 + (ML19296C546)
- ML19296C547 + (ML19296C547)
- ML19296C549 + (ML19296C549)
- ML19296C550 + (ML19296C550)
- ML19296C551 + (ML19296C551)
- 05000259/LER-1980-006-03, /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced + (ML19296C553)
- ML19296C554 + (ML19296C554)
- 05000259/LER-1980-007, Forwards LER 80-007/03L-0 + (ML19296C555)
- ML19296C556 + (ML19296C556)
- ML19296C557 + (ML19296C557)
- 05000259/LER-1980-007-03, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed + (ML19296C558)
- ML19296C559 + (ML19296C559)
- ML19296C560 + (ML19296C560)
- ML19296C562 + (ML19296C562)
- 05000259/LER-1980-009-03, /03L-0:on 800125,SI 4.2.A-10,reactor Bldg Monitoring Was Performed Three Weeks Late.Caused by Oversight by Cognizant Section.Personnel Instructed to Be More Aware of Due Dates + (ML19296C563)
- ML19296C564 + (ML19296C564)
- ML19296C565 + (ML19296C565)
- ML19296C566 + (ML19296C566)
- ML19296C567 + (ML19296C567)
- ML19296C568 + (ML19296C568)
- ML19296C569 + (ML19296C569)
- ML19296C570 + (ML19296C570)
- ML19296C571 + (ML19296C571)
- 05000346/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19296C572)
- ML19296C573 + (ML19296C573)
- ML19296C574 + (ML19296C574)
- 05000346/LER-1980-009-03, /03L-0:on 800122,discovered That NI-7 Indication on Computer Group 38 Was Reading Less than Heat Balance Power,Putting NI-7 Below Instrumentation Operability Limit Line.Caused by Extremely Tight Calibr Band at 100% Power + (ML19296C575)
- ML19296C576 + (ML19296C576)
- ML19296C578 + (ML19296C578)
- 05000321/LER-1980-017, Forwards LER 80-017/03L-0 + (ML19296C579)
- ML19296C580 + (ML19296C580)
- ML19296C582 + (ML19296C582)
- ML19296C583 + (ML19296C583)
- ML19296C585 + (ML19296C585)
- ML19296C586 + (ML19296C586)
- 05000336/LER-1980-002, Forwards LER 80-002/03L-0 + (ML19296C587)
- ML19296C588 + (ML19296C588)
- ML19296C589 + (ML19296C589)
- 05000259/LER-1980-015, Forwards LER 80-015/01T-0 + (ML19296C590)
- ML19296C591 + (ML19296C591)
- 05000321/LER-1980-017-03, /03L-0:on 800201,while Performing MSIV Closure Instrumentation Ft&C,Scram Relays IC71-K3G & H Found de-energized W/Associated MSIVs Fully Open.Caused by Loose Limit Switch on Actuating Arm.Arm Reset & Tightened + (ML19296C592)
- ML19296C593 + (ML19296C593)
- ML19296C594 + (ML19296C594)
- 05000336/LER-1980-002-03, /03L-0:on 800131,during Steady State Operation, Leakage Was Observed from Packing on High Pressure Safety Injection Valve.Caused by Worn Packing.Valve Repacked & Restored to Svc + (ML19296C595)
- ML19296C596 + (ML19296C596)
- ML19296C597 + (ML19296C597)
- ML19296C598 + (ML19296C598)
- ML19296C599 + (ML19296C599)